LaCrosse

SAFSTOR

Dairyland Power Cooperative·Genoa, WI·BWR·48 MWe

Technical specifications, photos, nearby jobs, satellite map, contact information, and per diem rates for LaCrosse.

SAFSTOR

Permanently shut down on 1987-04-30.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
1 unit: 1 permanent shutdown.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
LaCrosse BWR 48 1963-03-01 1968-04-26 1969-11-07 1987-04-30 Permanent Shutdown
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
LaCrosse 50 55 165 1967-07-11 ALLIS CHALMERS
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
LaCrosse 3.9 TWh 51.0% 64.7% 63.2%
Operator: DAIRYLAND POWER COOPERATIVE
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Fuel Cycle Facilities

?
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
1 facility: 1 in operation.
Facility Type Scale Design Capacity Operated Status Operator
Lacrosse NPP (shutdown) ISFSI AFR Wet Spent Fuel Storage (Pool) Commercial In Operation Dairyland Power Cooperative
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.

Working Here

Per Diem Rates FY 2027

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2027.
$113
Lodging/Night
$68
M&IE/Day
$181
Total/Day
Standard Rate, WI

Unemployment Benefits WI

?
Maximum state unemployment insurance benefits for WI. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$370
Max Weekly
26
Max Weeks
$9,620
Max Total
7-day waiting period before benefits begin

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Route 1
Genoa, WI 54632, USA
Get Directions
Phone: (608) 689-4249

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: La Crosse Boiling Water Reactor.

The La Crosse Boiling Water Reactor was a small nuclear power plant at Genoa, in Vernon County, Wisconsin, on the Mississippi River about 17 miles south of the city of La Crosse. Allis-Chalmers designed and built the reactor for Dairyland Power Cooperative.

Read more

Construction began on March 1, 1963. The reactor connected to the grid on April 26, 1968, and entered commercial operation in 1969. It was shut down in April 1987 because its small size made it uneconomical, and it was placed in SAFSTOR on August 7, 1991. The reactor vessel was removed and shipped to Barnwell, South Carolina in May 2007. Spent fuel was sealed into dry casks in 2012, and the NRC approved final decommissioning in February 2023.

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Publicly Traded No — Member-owned generation and transmission cooperative

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: BWR
NSS Supplier: AC
Net Capacity: 48 MWe
Status: SAFSTOR

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Const. Permit: 1963-03-01
Operating Lic: 1968-04-26
Commercial Op: 1969-11-07