Leibstadt

Technical specifications, photos, nearby jobs, and satellite map for Leibstadt.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
1 unit: 1 operational. Net capacity in service: 1,233 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Leibstadt BWR BWR-6 1,233 1974-01-01 1984-05-24 1984-12-15 Operational
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Leibstadt 960 1,285 3,600 1984-03-09 GENERAL ELECTRIC TECHNICAL SERVICES CO. BROWN BOVERI ET CIE
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Leibstadt 337.0 TWh 83.1% 82.7% 86.3%
Operator: KERNKRAFTWERK LEIBSTADT
Owner: KERNKRAFTWERK LEIBSTADT
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-14.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$292
Lodging/Night
$195
M&IE/Day
$487
Total/Day
Switzerland: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Leibstadt, Aargau, Switzerland
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Leibstadt Nuclear Power Plant.

Leibstadt is a nuclear power plant near the village of Leibstadt in the canton of Aargau, Switzerland, on the Rhine close to the German border.

Read more

Planning began in 1964 for a plant of 600 MW, and in 1971 a cooling tower replaced direct river cooling in the design. Construction began in 1972. The reactor is a General Electric boiling water reactor. Safety rules introduced after the Three Mile Island accident in 1979 delayed completion for several years. The plant was commissioned on 24 May 1984, after about eleven years of construction.