Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
8 units: 4 operational, 2 under construction, 2 permanent shutdown.
Net capacity in service: 4,052 MWe.
| Unit | Type | Model | Net MWe | Construction | Grid | Commercial Op | Shutdown | Status |
|---|---|---|---|---|---|---|---|---|
| Leningrad 1 | LWGR | RBMK-1000 | 925 | 1970-03-01 | 1973-12-21 | 1974-11-01 | 2018-12-21 | Permanent Shutdown |
| Leningrad 2 | LWGR | RBMK-1000 | 925 | 1970-06-01 | 1975-07-11 | 1975-11-11 | 2020-11-10 | Permanent Shutdown |
| Leningrad 3 | LWGR | RBMK-1000 | 925 | 1973-12-01 | 1979-12-07 | 1980-06-29 | Operational | |
| Leningrad 4 | LWGR | RBMK-1000 | 925 | 1975-02-01 | 1981-02-09 | 1981-08-29 | Operational | |
| Leningrad 2-1 | PWR | VVER V-491 | 1,101 | 2008-10-25 | 2018-03-09 | 2018-10-24 | Operational | |
| Leningrad 2-2 | PWR | VVER V-491 | 1,101 | 2010-04-15 | 2020-10-22 | 2021-03-18 | Operational | |
| Leningrad 2-3 | PWR | VVER V-491 | 1,064 | 2024-03-14 | 2030-03-06 | 2030-10-20 | Under Construction | |
| Leningrad 2-4 | PWR | VVER V-491 | 1,064 | 2025-03-20 | 2032-03-06 | 2032-10-20 | Under Construction |
Capacity, milestones and suppliers
| Unit | Design MWe | Gross MWe | Thermal MWt | First Criticality | Reactor Supplier | Turbine Supplier | Notes |
|---|---|---|---|---|---|---|---|
| Leningrad 1 | 925 | 1,000 | 3,200 | 1973-09-12 | Atomenergomash | Kharkiv Turbine Factory | Decommissioning from 2025-12-23 |
| Leningrad 2 | 925 | 1,000 | 3,200 | 1975-05-06 | Atomenergomash | Kharkiv Turbine Factory | |
| Leningrad 3 | 925 | 1,000 | 3,200 | 1979-09-17 | Atomenergomash | Kharkiv Turbine Factory | |
| Leningrad 4 | 925 | 1,000 | 3,200 | 1980-12-29 | Atomenergomash | Kharkiv Turbine Factory | |
| Leningrad 2-1 | 1,106 | 1,188 | 3,200 | 2018-02-06 | Atomenergomash | Atomenergomash | |
| Leningrad 2-2 | 1,106 | 1,188 | 3,200 | 2020-08-29 | Atomenergomash | Atomenergomash | |
| Leningrad 2-3 | 1,064 | 1,150 | 3,200 | 2029-12-11 | Atomenergomash | Atomenergomash | |
| Leningrad 2-4 | 1,064 | 1,150 | 3,200 | 2031-12-13 | Atomenergomash | Atomenergomash |
Lifetime performance, through 2025
| Unit | Electricity Supplied | Load Factor | Energy Availability | Operating Factor |
|---|---|---|---|---|
| Leningrad 1 | 244.1 TWh | 67.4% | 67.9% | 73.1% |
| Leningrad 2 | 255.7 TWh | 69.9% | 70.2% | 75.8% |
| Leningrad 3 | 272.2 TWh | 73.0% | 73.9% | 76.6% |
| Leningrad 4 | 263.7 TWh | 74.6% | 75.3% | 77.9% |
| Leningrad 2-1 | 54.0 TWh | 75.1% | 76.2% | 77.8% |
| Leningrad 2-2 | 40.5 TWh | 82.7% | 82.5% | 85.0% |
Operator: Joint Stock Company 'Concern Rosenergoatom'
Owner: Joint Stock Company 'Concern Rosenergoatom'
Source: IAEA Power Reactor Information System (PRIS), as of 2026-11-02.
Fuel Cycle Facilities
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
1 facility: 1 in operation.
| Facility | Type | Scale | Design Capacity | Operated | Status | Operator |
|---|---|---|---|---|---|---|
| Leningrad NPP Site | AFR Wet Spent Fuel Storage (Pool) | Commercial | 4000 t HM | 1984– | In Operation | Leningrad NPP |
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.
Working Here
Per Diem Rates FY 2026
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$173
Lodging/Night
$112
M&IE/Day
$285
Total/Day
Russia: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.
Photos
Photos of this facility from the NukeWorker photo gallery. Click the header or any photo to browse the full album.
Facility Map
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
59.8395, 29.0483
Location & Contact
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Plant Facts
About This Site
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Leningrad Nuclear Power Plant; IAEA PRIS: Russian Federation.
The Leningrad nuclear power plant is at Sosnovy Bor on the southern shore of the Gulf of Finland, about 70 km west of Saint Petersburg, in Leningrad Oblast, Russia. The original station, Leningrad I, has four RBMK-1000 reactors.
Read more
Construction of Unit 1 began on March 1, 1970, and it was connected to the grid on December 21, 1973. On November 28, 1975, a fuel channel failure in Unit 1 partly melted a fuel assembly. Unit 1 was permanently shut down on December 21, 2018, and Unit 2 on November 10, 2020. The VVER-1200 units of Leningrad II began construction in October 2008, and the first was connected to the grid on March 9, 2018.