Maine Yankee

DECON

Yankee Atomic Power·Wiscasset, ME·PWR·860 MWe

Technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for Maine Yankee.

DECON

Permanently shut down on 1997-08-01.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
1 unit: 1 permanent shutdown.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Maine Yankee PWR 860 1968-10-01 1972-11-08 1972-12-28 1997-08-01 Permanent Shutdown
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Maine Yankee 825 900 2,630 1972-10-23 COMBUSTION ENGINEERING CO.
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Maine Yankee 118.7 TWh 68.0% 70.6% 72.7%
Operator: MAINE YANKEE ATOMIC POWER CO.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Fuel Cycle Facilities

?
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
1 facility: 1 in operation.
Facility Type Scale Design Capacity Operated Status Operator
Maine Yankee NPP Site (shut down) ISFSI AFR Dry Spent Fuel Storage Commercial 190 t HM 1997– In Operation Maine Yankee Atomic Power Co
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.

Working Here

Per Diem Rates FY 2027

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2027.
$113
Lodging/Night
$68
M&IE/Day
$181
Total/Day
Standard Rate, ME

Unemployment Benefits ME

?
Maximum state unemployment insurance benefits for ME. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$781
Max Weekly
26
Max Weeks
$20,306
Max Total
7-day waiting period before benefits begin

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
321 Old Ferry Road
Wiscasset, ME 04578, USA
Get Directions
Phone: (207) 882-6321

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Maine Yankee Nuclear Power Plant.

Maine Yankee was a nuclear power plant on the Bailey Peninsula in Wiscasset, Lincoln County, Maine, on an 820-acre site that drew cooling water from the Back River.

Read more

Maine Yankee Atomic Power Company was formed in 1966, and construction began on October 1, 1968. The plant used a three-loop Combustion Engineering pressurized water reactor. It connected to the grid on November 8, 1972, and was commissioned on December 28, 1972. After an NRC investigation opened in 1995, the plant stopped operating in 1996 because correcting the deficiencies was judged too costly. Permanent shutdown dates to August 1, 1997. The reactor vessel was barged to Barnwell, South Carolina in 2003, the containment building was demolished in 2004, and decommissioning was completed in 2005.

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Yankee Atomic Power
Architect Engineer: S&W
Constructor: S&W
Publicly Traded No — Dissolved decommissioning trust company

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: PWR
Containment: PWR-DRYAMB
NSS Supplier: COMB CE
Thermal Power: 2700 MWt
Net Capacity: 860 MWe
Status: DECON

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000309
License #: DPR-36
License Type: OL-FP
Const. Permit: 1968-10-21
Operating Lic: 1973-06-29
Commercial Op: 1972-12-28
License Exp: 2008-10-21