Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.
Working Here
Per Diem Rates
FY 2026
?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$237
Lodging/Night
$140
M&IE/Day
$377
Total/Day
Germany: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
49.1042, 8.43237
Location & Contact
?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Eggenstein-Leopoldshafen, Baden-Württemberg, Germany
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: World Nuclear Association: MZFR; Euronuclear: MZFR.
MZFR (Mehrzweckforschungsreaktor, multi-purpose research reactor) was a heavy-water power and research reactor on the grounds of the Karlsruhe nuclear research center in Eggenstein-Leopoldshafen, Baden-Württemberg, Germany.
Read more
Construction began in December 1961. The reactor used heavy water as moderator and coolant, and had a thermal output of 200 MW and an electrical output of 50 MW. It first reached criticality on 29 September 1965 and was connected to the grid on 9 March 1966. Besides power generation it served as a test bed for materials and for operator training, and from 1979 to 1984 it supplied heat as well as electricity. Operation ended on 3 May 1984. In 1989 it was decided to dismantle the plant in stages.