Neckarwestheim

Technical specifications, photos, nearby jobs, and satellite map for Neckarwestheim.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
2 units: 2 permanent shutdown.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Neckarwestheim 1 PWR PWR 785 1972-02-01 1976-06-03 1976-12-01 2011-08-06 Permanent Shutdown
Neckarwestheim 2 PWR Konvoi 1,310 1982-11-09 1989-01-03 1989-04-15 2023-04-15 Permanent Shutdown
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Neckarwestheim 1 805 840 2,497 1976-05-26 KRAFTWERK UNION, AG KRAFTWERK UNION, AG Decommissioning from 2017-02-13
Neckarwestheim 2 1,225 1,400 3,850 1988-12-29 KRAFTWERK UNION, AG KRAFTWERK UNION, AG Decommissioning from 2023-05-16
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Neckarwestheim 1 186.8 TWh 76.8% 82.9% 84.6%
Neckarwestheim 2 351.2 TWh 91.4% 92.3% 93.2%
Operator: EnBW Kernkraft GmbH
Owner: 1. (98.45%) EnBW 2. (1.55%) four other owners; EnBW Kernkraft GmbH
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Fuel Cycle Facilities

?
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
1 facility: 1 in operation.
Facility Type Scale Design Capacity Operated Status Operator
Neckarwestheim NPP On-Site Storage Facility AFR Dry Spent Fuel Storage Commercial 1600 t HM 2006–2046 In Operation BundesGesel,Germany
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$237
Lodging/Night
$140
M&IE/Day
$377
Total/Day
Germany: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Neckarwestheim, Baden-Württemberg, Germany
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Neckarwestheim Nuclear Power Plant.

Neckarwestheim is a nuclear power plant at Neckarwestheim in Baden-Württemberg, Germany, on the Neckar River.

Read more

Construction of the plant began in 1971. Both units were pressurized water reactors supplied by Kraftwerk Union (Siemens). Unit 1 was connected to the grid on 3 June 1976, and Unit 2 on 3 January 1989. Unit 1 was taken off line on 17 March 2011 during the moratorium that followed the Fukushima accident, and it was permanently shut down on 6 August 2011. Unit 2 was permanently shut down on 15 April 2023 at the end of the German nuclear phase-out.