Nogent
Reactor Data
Reactor Units
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
2 units: 2 operational.
Net capacity in service: 2,620 MWe.
| Unit | Type | Model | Net MWe | Construction | Grid | Commercial Op | Shutdown | Status |
|---|---|---|---|---|---|---|---|---|
| Nogent 1 | PWR | P4 REP 1300 | 1,310 | 1981-05-26 | 1987-10-21 | 1988-02-24 | Operational | |
| Nogent 2 | PWR | P4 REP 1300 | 1,310 | 1982-01-01 | 1988-12-14 | 1989-05-01 | Operational |
Capacity, milestones and suppliers
| Unit | Design MWe | Gross MWe | Thermal MWt | First Criticality | Reactor Supplier | Turbine Supplier | Notes |
|---|---|---|---|---|---|---|---|
| Nogent 1 | 1,310 | 1,363 | 3,817 | 1987-09-12 | FRAMATOME | ALSTOM | |
| Nogent 2 | 1,310 | 1,363 | 3,817 | 1988-10-04 | FRAMATOME | ALSTOM |
Lifetime performance, through 2025
| Unit | Electricity Supplied | Load Factor | Energy Availability | Operating Factor |
|---|---|---|---|---|
| Nogent 1 | 302.4 TWh | 72.9% | 77.6% | 79.9% |
| Nogent 2 | 315.4 TWh | 74.4% | 79.8% | 80.8% |
Operator: ÉLECTRICITÉ DE FRANCE
Owner: ÉLECTRICITÉ DE FRANCE
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-26.
Working Here
Per Diem Rates FY 2026
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$220
Lodging/Night
$132
M&IE/Day
$352
Total/Day
France: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.
Photos
Photos of this facility from the NukeWorker photo gallery. Click the header or any photo to browse the full album.
Facility Map
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
48.5157, 3.51676
Location & Contact
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Plant Facts
About This Site
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Nogent Nuclear Power Plant.
Nogent is a nuclear power plant in the commune of Nogent-sur-Seine, in the Aube department of Grand Est, on the right bank of the Seine. It has two pressurized water reactor units supplied by Framatome.
Read more
Construction began in 1981, and the units were first connected to the grid in October 1987 and December 1988. On 30 September 2005, water was accidentally sprayed onto electrical cabinets and a reactor shut down automatically, with no injuries or radiation release; the event was rated level 1 on the International Nuclear Event Scale. On 5 December 2011, nine Greenpeace activists cut through a fence, climbed onto the roof of a reactor building and displayed a banner.