Oak Ridge K-25 (ETTP)

Oak Ridge, TN

Community ratings, technical specifications, photos, nearby jobs, satellite map, and per diem rates for Oak Ridge K-25 (ETTP).

Facility Data

Fuel Cycle Facilities

?
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
1 facility: 1 decommissioning.
Facility Type Scale Design Capacity Operated Status Operator
Oak Ridge K-25, Y-12 Uranium Enrichment Commercial 8500 MTSWU/year 1945–1985 Decommissioning Exxon Coal and Minerals Company
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.

Working Here

Per Diem Rates FY 2027

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2027.
$113
Lodging/Night
$68
M&IE/Day
$181
Total/Day
Standard Rate, TN

Unemployment Benefits TN

?
Maximum state unemployment insurance benefits for TN. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$275
Max Weekly
26
Max Weeks
$7,150
Max Total
7-day waiting period before benefits begin

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Oak Ridge, TN 37849, USA
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Oak Ridge Gaseous Diffusion Plant.

The Oak Ridge K-25 site (later the East Tennessee Technology Park) is at Oak Ridge, Tennessee, on the former Clinton Engineer Works of the Manhattan Project. K-25 was the codename for the project to enrich uranium by gaseous diffusion.

Read more

Work on the main facility area began on October 20, 1943. The four-story main process building was completed in 1944 with about 5.26 million square feet of floor space. Production began in February 1945, and the first product went to the Y-12 calutrons in March 1945. Gaseous diffusion ceased on August 27, 1985. The site was renamed the Oak Ridge K-25 Site in 1989 and the East Tennessee Technology Park in 1996. Demolition of the main K-25 building was completed by 2014.