Ohi

Technical specifications, photos, nearby jobs, and satellite map for Ohi.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
4 units: 2 operational, 2 permanent shutdown. Net capacity in service: 2,254 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Ohi 1 PWR WH 4LP 1,120 1972-10-26 1977-12-23 1979-03-27 2018-03-01 Permanent Shutdown
Ohi 2 PWR WH 4LP 1,120 1972-12-08 1978-10-11 1979-12-05 2018-03-01 Permanent Shutdown
Ohi 3 PWR M (4-loop) 1,127 1987-10-03 1991-06-07 1991-12-18 Operational
Ohi 4 PWR M (4-loop) 1,127 1988-06-13 1992-06-19 1993-02-02 Operational
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Ohi 1 1,120 1,175 3,423 1977-12-02 WESTINGHOUSE ELECTRIC CORPORATION MITSUBISHI HEAVY INDUSTRIES, LTD.
Ohi 2 1,120 1,175 3,423 1978-09-14 WESTINGHOUSE ELECTRIC CORPORATION MITSUBISHI HEAVY INDUSTRIES, LTD.
Ohi 3 1,127 1,180 3,423 1991-05-17 MITSUBISHI HEAVY INDUSTRIES, LTD. MITSUBISHI HEAVY INDUSTRIES, LTD.
Ohi 4 1,127 1,180 3,423 1992-05-28 MITSUBISHI HEAVY INDUSTRIES, LTD. MITSUBISHI HEAVY INDUSTRIES, LTD.
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Ohi 1 213.3 TWh 55.8% 55.3% 56.0%
Ohi 2 231.7 TWh 61.6% 60.9% 61.4%
Ohi 3 227.9 TWh 67.7% 66.7% 67.0%
Ohi 4 235.2 TWh 72.3% 71.0% 71.2%
Operator: Kansai Electric Power Co.
Owner: Kansai Electric Power Co.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-11-02.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$208
Lodging/Night
$107
M&IE/Day
$315
Total/Day
Japan: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Ohi, Fukui Prefecture, Japan
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Oi Nuclear Power Plant.

Ohi Nuclear Power Plant is in the town of Ohi, Fukui Prefecture, Japan, on the Sea of Japan coast.

Read more

Construction of Unit 1 began on 26 October 1972 and Unit 2 on 8 December 1972, both Westinghouse four-loop pressurized water reactors. Mitsubishi Heavy Industries four-loop reactors followed as Unit 3 (construction from 3 October 1987) and Unit 4 (13 June 1988). The units were connected to the grid in 1977, 1978, 1991 and 1992. In December 2017 the operator announced that Units 1 and 2 would be decommissioned, and both were permanently shut down on 1 March 2018.