Pathfinder

Permanently Shut Down

Xcel Energy·Sioux Falls, SD·BWR·59 MWe

Technical specifications, photos, nearby jobs, satellite map, contact information, and per diem rates for Pathfinder.

Permanently Shut Down

Permanently shut down on 1967-10-01.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
1 unit: 1 permanent shutdown.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Pathfinder BWR Prototype 59 1959-01-01 1966-07-25 1966-08-01 1967-10-01 Permanent Shutdown
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Pathfinder 59 63 220 1964-01-01 ALLIS CHALMERS ALLIS CHALMERS
Operator: NUCLEAR MANAGEMENT CO.
Owner: Xcel Energy
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Working Here

Per Diem Rates FY 2027

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2027.
$113
Lodging/Night
$68
M&IE/Day
$181
Total/Day
Standard Rate, SD

Unemployment Benefits SD

?
Maximum state unemployment insurance benefits for SD. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$487
Max Weekly
26
Max Weeks
$12,662
Max Total
7-day waiting period before benefits begin

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Sioux Falls, SD 57101, USA
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Pathfinder Nuclear Generating Station; NRC: Pathfinder licensing history.

The Pathfinder Atomic Power Plant was a nuclear power station near Sioux Falls, South Dakota, built by Northern States Power as a proof-of-concept plant, in cooperation with the U.S. Atomic Energy Commission. It used a boiling water reactor with an Allis-Chalmers nuclear superheater.

Read more

The reactor first went critical in 1964 and the plant entered commercial operation in 1966. It was shut down in 1967 after the failure of steam separators, and the superheater had been plagued with technical difficulties. In 1968 the owner decided to keep the reactor permanently shut down and installed three package boilers to convert the plant to fossil fuel. The reactor was defueled and placed in SAFSTOR in 1969 and 1970, and the reactor itself was removed in 1991.

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Xcel Energy
XEL Xcel Energy Inc. NasdaqGS
$76.78 ▲ +0.10 (+0.13%)
Previous Close 76.68
Day's Range 76.53 – 77.44
52-Week Range 68.72 – 84.23
Volume 5,465,653
Delayed quote as of Oct 21, 2026 4:00 PM ET. Source: Yahoo Finance. Full quote on Yahoo Finance

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: BWR
NSS Supplier: AC
Net Capacity: 59 MWe

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Const. Permit: 1959-01-01
Operating Lic: 1966-07-25