Rajasthan

Technical specifications, photos, nearby jobs, and satellite map for Rajasthan.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
8 units: 6 operational, 1 suspended operation, 1 under construction. Net capacity in service: 1,759 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Rajasthan 1 PHWR Horizontal Pressure Tube type 134 1965-08-01 1972-11-30 1973-12-16 Suspended Operation
Rajasthan 2 PHWR Horizontal Pressure Tube type 187 1968-04-01 1980-11-01 1981-04-01 Operational
Rajasthan 3 PHWR Horizontal Pressure Tube type 202 1990-02-01 2000-03-10 2000-06-01 Operational
Rajasthan 4 PHWR Horizontal Pressure Tube type 202 1990-10-01 2000-11-17 2000-12-23 Operational
Rajasthan 5 PHWR Horizontal Pressure Tube type 202 2002-09-18 2009-12-22 2010-02-04 Operational
Rajasthan 6 PHWR Horizontal Pressure Tube type 202 2003-01-20 2010-03-28 2010-03-31 Operational
Rajasthan 8 PHWR Horizontal Pressure Tube type 630 2011-09-30 Under Construction
Rajasthan 7 PHWR Horizontal Pressure Tube type 630 2011-07-18 2025-03-17 2025-04-15 Operational
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Rajasthan 1 207 100 346 1972-08-11 ATOMIC ENERGY OF CANADA, LTD. THE ENGLISH ELECTRIC CO., LTD. Suspended 2004-10-09
Rajasthan 2 207 200 693 1980-10-08 ATOMIC ENERGY OF CANADA Ltda AND DEPARTMENT OF ATOMIC ENERGY(INDIA) THE ENGLISH ELECTRIC CO., LTD.
Rajasthan 3 202 220 801 1999-12-24 NUCLEAR POWER CORPORATION OF INDIA, LTD. Vikram Sarabhai Bhavan, Anushakti Nagar, Mumbai - 400 094. Bharat Heavy Electricals Ltd (BHEL) www.bhel.com
Rajasthan 4 202 220 801 2000-11-03 NUCLEAR POWER CORPORATION OF INDIA, LTD. Vikram Sarabhai Bhavan, Anushakti Nagar, Mumbai - 400 094. Bharat Heavy Electricals Ltd (BHEL) www.bhel.com
Rajasthan 5 202 220 801 2009-11-24 NUCLEAR POWER CORPORATION OF INDIA, LTD. Vikram Sarabhai Bhavan, Anushakti Nagar, Mumbai - 400 094. TURBOATOM Kharkiv Turbine Manufacture Plant
Rajasthan 6 202 220 801 2010-01-23 NUCLEAR POWER CORPORATION OF INDIA, LTD. Vikram Sarabhai Bhavan, Anushakti Nagar, Mumbai - 400 094. TURBOATOM Kharkiv Turbine Manufacture Plant
Rajasthan 8 630 700 2,177 NUCLEAR POWER CORPORATION OF INDIA, LTD. Vikram Sarabhai Bhavan, Anushakti Nagar, Mumbai - 400 094. Bharat Heavy Electricals Ltd (BHEL) www.bhel.com
Rajasthan 7 630 700 2,177 2024-09-19 NUCLEAR POWER CORPORATION OF INDIA, LTD. Vikram Sarabhai Bhavan, Anushakti Nagar, Mumbai - 400 094. Bharat Heavy Electricals Ltd (BHEL) www.bhel.com
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Rajasthan 1 10.1 TWh 22.4% 26.0% 32.8%
Rajasthan 2 41.3 TWh 57.8% 60.4% 67.0%
Rajasthan 3 33.0 TWh 72.2% 75.3% 84.5%
Rajasthan 4 35.5 TWh 79.4% 81.7% 90.4%
Rajasthan 5 26.0 TWh 92.2% 90.5% 90.6%
Rajasthan 6 23.7 TWh 84.9% 84.3% 85.3%
Rajasthan 7 1.4 TWh 33.0% 33.0% 58.6%
Operator: NUCLEAR POWER CORPORATION OF INDIA, LTD.
Owner: NUCLEAR POWER CORPORATION OF INDIA, LTD.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-26.

Fuel Cycle Facilities

?
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
3 facilities: 2 in operation, 1 under construction.
Facility Type Scale Design Capacity Operated Status Operator
Kota Heavy Water Production Commercial 85 t/year 1985– In Operation Department of Atomic Energy (DAE)
AFR RAPP1/2 Rajasthan NPP Site AFR Dry Spent Fuel Storage Commercial 570 t HM 1994– In Operation Nuclear Power Corporation of India Ltd
Nuclear Fuel Complex- Kota Fuel Fabrication (U Pellet, Pin, FA) Commercial 1000 t HM 2025– Under Construction NFC
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$196
Lodging/Night
$92
M&IE/Day
$288
Total/Day
India: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Rawatbhata, Rajasthan, India
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Rajasthan Atomic Power Station.

Rajasthan Atomic Power Station is a nuclear power plant at Rawatbhata in Chittorgarh district, Rajasthan, India. It uses water from the Rana Pratap Sagar reservoir on the Chambal River.

Read more

Construction began in the 1960s under an agreement with Atomic Energy of Canada Limited for two CANDU heavy water reactors. Unit 1 was connected to the grid on 30 November 1972. Canada withdrew after India's 1974 nuclear test, and Unit 2 was completed by India alone, reaching the grid on 1 November 1980. Indian-designed 220 MW units 3 to 6 followed in 2000, 2000, 2009 and 2010, and a 700 MW Unit 7 in 2025.