Rolphton NPD

Permanently Shut Down

Rolphton, ON·CANDU

Community ratings, technical specifications, photos, nearby jobs, satellite map, and per diem rates for Rolphton NPD.

Permanently Shut Down

Permanently shut down on 2000-01-00.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
1 unit: 1 permanent shutdown.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Rolphton NPD PHWR CANDU 22 1958-01-01 1962-06-04 1962-10-01 1987-08-01 Permanent Shutdown
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Rolphton NPD 17 25 92 1962-04-11 CANADIAN GENERAL ELECTRIC GENERAL ELECTRIC COMPANY (UK)
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Rolphton NPD 3.2 TWh 66.7% 69.0% 72.0%
Operator: ONTARIO HYDRO
Owner: NUCLEAR PORTION: AECL ; CONVENTIONAL PORTION: ONTARIO HYDRO
Source: IAEA Power Reactor Information System (PRIS), as of 2026-11-02.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$167
Lodging/Night
$120
M&IE/Day
$287
Total/Day
Canada: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Rolphton, ON K0J1J0, Canada
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Nuclear Power Demonstration.

Rolphton NPD is the site of the Nuclear Power Demonstration (NPD) reactor, on the west bank of the Ottawa River at Rolphton, Ontario, near the Chalk River Laboratories.

Read more

The official sod-turning took place on 19 September 1956. A prototype CANDU pressurized heavy-water reactor of about 20 MWe, it was built by Canadian General Electric with Atomic Energy of Canada Limited and the Hydro-Electric Power Commission of Ontario. The reactor first went critical on 11 April 1962 and delivered its first power to the grid on 4 June 1962. It was Canada's first nuclear power reactor, a proof of concept for later CANDU designs and a training center for CANDU operators. It was permanently shut down on 1 August 1987.

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: CANDU