Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
Operator: Nuclear Power Plant Company Bangladesh Limited
Owner: Bangladesh Atomic Energy Commission
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.
Working Here
Per Diem Rates
FY 2026
?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$235
Lodging/Night
$135
M&IE/Day
$370
Total/Day
Bangladesh: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
24.0667, 89.0482
Location & Contact
?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Rooppur Nuclear Power Plant.
Rooppur is a nuclear power plant site on the bank of the Padma River in Ishwardi Upazila, Pabna District, Rajshahi Division, Bangladesh, about 160 km north-west of Dhaka.
Read more
A nuclear plant for what was then East Pakistan was proposed in 1961, and Rooppur village was selected as the site in 1963. Bangladesh and Russia signed a framework agreement on peaceful nuclear cooperation on 21 May 2010, and a general engineering, procurement and construction contract with Rosatom followed on 25 December 2015. The design is two VVER-1200 pressurized water reactors supplied by Atomstroyexport. Construction of Unit 1 started on 30 November 2017, and Unit 2 on 14 July 2018 with its first concrete pour.