Saeul

Technical specifications, photos, nearby jobs, and satellite map for Saeul.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
4 units: 2 operational, 2 under construction. Net capacity in service: 2,784 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Saeul 1 PWR APR-1400 1,392 2008-10-16 2016-01-15 2016-12-20 Operational
Saeul 3 PWR APR-1400 1,340 2017-04-01 Under Construction
Saeul 4 PWR APR-1400 1,340 2018-09-20 Under Construction
Saeul 2 PWR APR-1400 1,392 2009-08-19 2019-04-22 2019-08-29 Operational
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Saeul 1 1,340 1,488 3,983 2015-12-29 DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD./KOREA POWER ENGINEERING COMPANY/COMBUSTIONENGINEERING Doosan Heavy Industries & Construction and General Electric
Saeul 3 1,340 1,400 3,983 2026-04-12 DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD./KOREA POWER ENGINEERING COMPANY/COMBUSTIONENGINEERING Doosan Heavy Industries & Construction and General Electric First criticality 2026-04-12 per KHNP; in test operation, grid connection date not confirmed
Saeul 4 1,340 1,400 3,983 DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD./KOREA POWER ENGINEERING COMPANY/COMBUSTIONENGINEERING Doosan Heavy Industries & Construction and General Electric
Saeul 2 1,340 1,491 3,983 2019-04-08 DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD./KOREA POWER ENGINEERING COMPANY/COMBUSTIONENGINEERING Doosan Heavy Industries & Construction and General Electric
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Saeul 1 93.9 TWh 81.8% 81.5% 82.3%
Saeul 2 68.2 TWh 84.6% 84.3% 85.1%
Operator: Korea Hydro and Nuclear Power Co.
Owner: Korea Hydro and Nuclear Power Co.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-14.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$60
Lodging/Night
$40
M&IE/Day
$100
Total/Day
South Korea: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Ulju, Ulsan, South Korea
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Kori Nuclear Power Plant; WNA: Saeul 1; WNA: Saeul 2.

Saeul Nuclear Power Plant is in Ulju County, Ulsan, South Korea. Its units were built as part of the Shin Kori project and later renamed Saeul.

Read more

Construction of the first two units, Korean APR-1400 pressurized water reactors, began on 16 October 2008 and 19 August 2009. Unit 1 reached first criticality on 29 December 2015 and was connected to the grid on 15 January 2016, entering commercial operation on 20 December 2016. Unit 2 was connected to the grid on 22 April 2019 and entered commercial operation on 29 August 2019.