Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
Active nuclear industry job listings in PA from the NukeWorker job board. Click a job title for full details, or click the header to search all jobs in this state.
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2027.
Maximum state unemployment insurance benefits for PA. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
40.2247, -78.2427
Location & Contact
?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Federal Register: NRC license termination notice, Nov 22, 2005; CLUI: Saxton Experimental Nuclear Reactor Site.
The Saxton Nuclear Experimental Reactor was a small research reactor in Bedford County, Pennsylvania, near the borough of Saxton. It was a one-loop pressurized water reactor licensed at 23.5 megawatts thermal. It had no turbine of its own, so its steam was sent to a nearby coal-fired power station, and it was used for power reactor research and personnel training.
Read more
The reactor operated from 1962 to 1972, reaching initial criticality on April 13, 1962, and was shut down on May 1, 1972. Its fuel was shipped to the Savannah River Site. Minor decommissioning took place from 1972 to 1974, buildings were removed between 1987 and 1992, and full-scale decommissioning began in May 1998. The NRC terminated the license in November 2005 after finding the site met criteria for unrestricted release.
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.