Shin-Hanul

Technical specifications, photos, nearby jobs, and satellite map for Shin-Hanul.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
4 units: 2 operational, 2 under construction. Net capacity in service: 2,845 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Shin-Hanul 1 PWR APR-1400 1,429 2012-07-10 2022-06-09 2022-12-07 Operational
Shin-Hanul 2 PWR APR-1400 1,416 2013-06-19 2023-12-21 2024-04-05 Operational
Shin-Hanul 3 PWR APR-1400 1,340 2025-05-20 Under Construction
Shin-Hanul 4 PWR APR-1400 1,340 2026-05-29 Under Construction
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Shin-Hanul 1 1,340 1,455 3,983 2022-05-22 DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD./KOREA POWER ENGINEERING COMPANY/COMBUSTIONENGINEERING Doosan Heavy Industries & Construction and General Electric
Shin-Hanul 2 1,340 1,455 3,983 2023-12-06 DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD./KOREA POWER ENGINEERING COMPANY/COMBUSTIONENGINEERING Doosan Heavy Industries & Construction and General Electric
Shin-Hanul 3 1,340 1,400 3,983 DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD./KOREA POWER ENGINEERING COMPANY/COMBUSTIONENGINEERING Doosan Heavy Industries & Construction and General Electric
Shin-Hanul 4 1,340 1,400 3,983 DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD./KOREA POWER ENGINEERING COMPANY/COMBUSTIONENGINEERING Doosan Heavy Industries & Construction and General Electric
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Shin-Hanul 1 33.0 TWh 79.9% 79.8% 81.1%
Shin-Hanul 2 16.9 TWh 70.6% 70.3% 70.6%
Operator: Korea Hydro and Nuclear Power Co.
Owner: Korea Hydro and Nuclear Power Co.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$60
Lodging/Night
$40
M&IE/Day
$100
Total/Day
South Korea: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Buk-myeon, North Gyeongsang, South Korea
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Hanul Nuclear Power Plant.

Shin-Hanul Nuclear Power Plant (earlier called Shin-Uljin) is in Buk-myeon, Uljin County, North Gyeongsang Province, South Korea, on the East Sea (Sea of Japan) coast.

Read more

Ground was broken for two APR-1400 pressurized water reactors on 4 May 2012. Unit 1 started construction on 21 July 2012, reached first criticality on 22 May 2022 and was connected to the grid on 9 June 2022. Unit 2 started construction on 19 June 2013, reached criticality on 6 December 2023 and was connected to the grid on 21 December 2023.