Shinpo

Technical specifications, photos, nearby jobs, and satellite map for Shinpo.

Working Here

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Geumho-eup, South Hamgyong, North Korea
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: KEDO: the light-water reactor project; NTI: Geumho-jigu light water reactor site.

Shinpo (Kumho) on North Korea's east coast was the site of the two light-water reactors that the Korean Peninsula Energy Development Organization (KEDO) was to build under the 1994 Agreed Framework, in exchange for North Korea freezing its gas-graphite reactors. Ground was broken in August 1997, and the first concrete for the reactor buildings was poured in August 2002.

Read more

Work was suspended in 2003, after North Korea expelled IAEA inspectors and withdrew from the Non-Proliferation Treaty. KEDO formally ended the project in January 2006, with the plant about 30 percent complete.

Never completed: project ended in 2006