Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
Active nuclear industry job listings in NY from the NukeWorker job board. Click a job title for full details, or click the header to search all jobs in this state.
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2027.
$163
Lodging/Night
$86
M&IE/Day
$249
Total/Day
Riverhead / Ronkonkoma / Melville, Suffolk County, NY
Maximum state unemployment insurance benefits for NY. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
40.9612, -72.8656
Location & Contact
?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Shoreham Nuclear Power Plant.
Shoreham Nuclear Power Plant was at Shoreham, on the north shore of Long Island in Suffolk County, New York, on Long Island Sound. The Long Island Lighting Company (LILCO) built it, with a General Electric boiling water reactor.
Read more
Construction began on November 1, 1972, and was completed in 1984 at a cost of about $6 billion. In 1983 Suffolk County determined the area could not be safely evacuated, and Governor Mario Cuomo ordered state officials not to approve LILCO's evacuation plan. In 1985 LILCO received permission for tests at 5 percent power. On May 19, 1989, LILCO agreed not to operate the plant. The Long Island Power Authority bought it in 1992 for $1, and decommissioning was completed in 1994.
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.