Sizewell
Leiston, Suffolk
Reactor Data
Reactor Units
| Unit | Type | Model | Net MWe | Construction | Grid | Commercial Op | Shutdown | Status |
|---|---|---|---|---|---|---|---|---|
| Sizewell A-1 | GCR | MAGNOX | 210 | 1961-04-01 | 1966-01-21 | 1966-03-25 | 2006-12-31 | Permanent Shutdown |
| Sizewell A-2 | GCR | MAGNOX | 210 | 1961-04-01 | 1966-04-09 | 1966-09-15 | 2006-12-31 | Permanent Shutdown |
| Sizewell B | PWR | SNUPPS | 1,198 | 1988-07-18 | 1995-02-14 | 1995-09-22 | Operational |
| Unit | Design MWe | Gross MWe | Thermal MWt | First Criticality | Reactor Supplier | Turbine Supplier | Notes |
|---|---|---|---|---|---|---|---|
| Sizewell A-1 | 290 | 245 | 1,010 | 1965-06-01 | THE ENGLISH ELECTRIC CO., LTD / BABCOCK & WILCOX CO. / TAYLOR WOODROW CONSTRUCTION, LTD. | THE ENGLISH ELECTRIC CO., LTD. | |
| Sizewell A-2 | 290 | 245 | 1,010 | 1965-12-01 | THE ENGLISH ELECTRIC CO., LTD / BABCOCK & WILCOX CO. / TAYLOR WOODROW CONSTRUCTION, LTD. | THE ENGLISH ELECTRIC CO., LTD. | |
| Sizewell B | 1,188 | 1,250 | 3,425 | 1995-01-31 | PWR POWER PROJECTS, Ltd. | GENERAL ELECTRIC COMPANY (UK) |
| Unit | Electricity Supplied | Load Factor | Energy Availability | Operating Factor |
|---|---|---|---|---|
| Sizewell A-1 | 56.8 TWh | 74.7% | 74.8% | 84.3% |
| Sizewell A-2 | 53.4 TWh | 71.3% | 71.5% | 80.9% |
| Sizewell B | 243.6 TWh | 83.7% | 84.3% | 86.4% |
Working Here
Per Diem Rates FY 2026
Photos
Facility Map
52.2153, 1.62203
Location & Contact
Plant Facts
About This Site
Sizewell is a nuclear power station site near the village of Sizewell, close to Leiston in Suffolk, England, on the North Sea coast. It has two stations, Sizewell A and Sizewell B.
Read more
Sizewell A had two Magnox reactors, built by British Nuclear Design and Construction, a consortium of English Electric, Babcock & Wilcox and Taylor Woodrow. Construction began on 1 April 1961, and both units entered service in 1966. They were permanently shut down on 31 December 2006. Sizewell B has a single pressurized water reactor. A public inquiry into its design ran from 1982 to 1985, construction began in the late 1980s, and it was first synchronized with the national grid on 14 February 1995.