Tarapur
Reactor Data
Reactor Units
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
4 units: 4 operational.
Net capacity in service: 1,160 MWe.
| Unit | Type | Model | Net MWe | Construction | Grid | Commercial Op | Shutdown | Status |
|---|---|---|---|---|---|---|---|---|
| Tarapur 1 | BWR | BWR-1 (Mark 2) | 150 | 1964-10-01 | 1969-04-01 | 1969-10-28 | Operational | |
| Tarapur 2 | BWR | BWR-1 (Mark 2) | 150 | 1964-10-01 | 1969-05-05 | 1969-10-28 | Operational | |
| Tarapur 4 | PHWR | Horizontal Pressure Tube Type | 378 | 2000-03-08 | 2005-06-04 | 2005-09-12 | Operational | |
| Tarapur 3 | PHWR | Horizontal Pressure Tube Type | 482 | 2000-05-12 | 2006-06-15 | 2006-08-18 | Operational |
Capacity, milestones and suppliers
| Unit | Design MWe | Gross MWe | Thermal MWt | First Criticality | Reactor Supplier | Turbine Supplier | Notes |
|---|---|---|---|---|---|---|---|
| Tarapur 1 | 200 | 160 | 530 | 1969-02-01 | GENERAL ELECTRIC CO. | GENERAL ELECTRIC CO. | Suspended 2020-01-18; Restarted 2026-01-29 |
| Tarapur 2 | 200 | 160 | 530 | 1969-02-28 | GENERAL ELECTRIC CO. | GENERAL ELECTRIC CO. | Suspended 2020-07-13; Restarted 2026-06-06 |
| Tarapur 4 | 502 | 540 | 1,730 | 2005-03-06 | NUCLEAR POWER CORPORATION OF INDIA, LTD. Vikram Sarabhai Bhavan, Anushakti Nagar, Mumbai - 400 094. | Bharat Heavy Electricals Ltd (BHEL) www.bhel.com | |
| Tarapur 3 | 502 | 540 | 1,730 | 2006-05-21 | NUCLEAR POWER CORPORATION OF INDIA, LTD. Vikram Sarabhai Bhavan, Anushakti Nagar, Mumbai - 400 094. | Bharat Heavy Electricals Ltd (BHEL) www.bhel.com |
Lifetime performance, through 2025
| Unit | Electricity Supplied | Load Factor | Energy Availability | Operating Factor |
|---|---|---|---|---|
| Tarapur 1 | 45.4 TWh | 63.1% | 67.4% | 75.4% |
| Tarapur 2 | 47.0 TWh | 64.2% | 67.6% | 75.2% |
| Tarapur 4 | 64.2 TWh | 74.3% | 75.1% | 85.5% |
| Tarapur 3 | 66.9 TWh | 80.5% | 81.3% | 88.8% |
Operator: NUCLEAR POWER CORPORATION OF INDIA, LTD.
Owner: NUCLEAR POWER CORPORATION OF INDIA, LTD.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-14.
Fuel Cycle Facilities
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
2 facilities: 2 in operation.
| Facility | Type | Scale | Design Capacity | Operated | Status | Operator |
|---|---|---|---|---|---|---|
| Tarapur (AFR) | AFR Wet Spent Fuel Storage (Pool) | Commercial | 275 t HM | 1990– | In Operation | Nuclear Power Corporation of India Ltd |
| Tarapur NPP Site | AFR Dry Spent Fuel Storage | Commercial | 20 t HM | 1990– | In Operation | Nuclear Power Corporation of India Ltd |
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.
Working Here
Per Diem Rates FY 2026
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$196
Lodging/Night
$92
M&IE/Day
$288
Total/Day
India: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.
Photos
Photos of this facility from the NukeWorker photo gallery. Click the header or any photo to browse the full album.
Facility Map
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
19.8283, 72.6642
Location & Contact
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Plant Facts
About This Site
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Tarapur Atomic Power Station.
Tarapur Atomic Power Station is a nuclear power plant on the Arabian Sea coast in Palghar district, Maharashtra, India, near Boisar.
Read more
Its first two units are boiling water reactors built by General Electric and Bechtel under a 1963 agreement among India, the United States and the IAEA. Construction of those units began in the 1960s, and they were connected to the grid on 1 April and 5 May 1969. They were the first commercial nuclear power units in India. Construction of two Indian-designed 540 MW heavy water reactors began in 2000, with Unit 4 reaching the grid on 4 June 2005 and Unit 3 on 15 June 2006.
