Three Mile Island 1

Decommissioned

Constellation Energy·Middletown, PA·PWR·786 MWe

Operational history, outage history & performance charts, scram history, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for Three Mile Island 1.

Decommissioned

Permanently shut down on 2019-09-20. View Outage History →

Excellence Score, Records & Plant Facts

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Three Mile Island 1 has operated for about 45 years and averaged a 87% lifetime capacity factor, generating roughly 133.0 TWh of electricity. Its longest unbroken run reached 2,031 days.
Lifecycle & Tenure
Operating Age: 45 Yrs
Build Time: 6.3 Yrs
Lic. Remaining: N/A Yrs
Production & Power
Lifetime CF: 87%
Efficiency: 30.6%
Generated: 133.0 TWh
Reliability & Outages
Record Run: 2,031 Days
Refuelings: 10
Avg Startup: 4.5 Days

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Constellation Energy
Architect Engineer: GIL
Constructor: UE&C
Ownership, operation and management history
DateChange FromTo
Dec 20, 1999 Sold GPU AmerGen (PECO Energy / British Energy)
Dec 22, 2003 Ownership stake AmerGen (Exelon / British Energy) AmerGen (wholly owned by Exelon)
Jan 2009 Merger AmerGen Exelon
Feb 1, 2022 Spin-off Exelon Constellation Energy
CEG Constellation Energy Corporation NasdaqGS
$295.79 ▲ +1.90 (+0.65%)
Previous Close 293.89
Day's Range 286.13 – 298.50
52-Week Range 228.63 – 412.70
Volume 2,291,570
Delayed quote as of Oct 13, 2026 4:00 PM ET. Source: Yahoo Finance. Full quote on Yahoo Finance

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: PWR
Containment: PWR-DRYAMB
NSS Supplier: B&W LLP
Turbine Supplier: GENERAL ELECTRIC CO. IAEA
Thermal Power: 2568 MWt
Net Capacity: 786 MWe
Gross Capacity: 880 MWe IAEA
Design Capacity: 819 MWe IAEA
Efficiency: 30.6%
Lifetime Output: 245.1 TWh through 2025 IAEA

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000289
License #: DPR-50
License Type: OL-FP
Const. Permit: 1968-05-18
Construction Start: 1968-05-18 IAEA
Operating Lic: 1974-04-19
First Criticality: 1974-06-05 IAEA
Grid Connection: 1974-06-19 IAEA
Commercial Op: 1974-09-02
License Renewed: 2009-10-22
License Exp: 2034-04-19

Market & Region

?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
Balancing Authority: PJM — PJM Interconnection (ISO/RTO)