Three Mile Island 2

SAFSTOR

EnergySolutions·Middletown, PA·PWR·880 MWe

Community ratings, technical specifications, photos, nearby jobs, satellite map, contact information, and per diem rates for Three Mile Island 2.

SAFSTOR

Permanently shut down on 1979-03-28.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
1 unit: 1 permanent shutdown.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Three Mile Island 2 PWR PWR 880 1969-11-01 1978-04-21 1978-12-30 1979-03-28 Permanent Shutdown
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Three Mile Island 2 906 959 2,772 1978-03-27 BABCOCK & WILCOX CO. WESTINGHOUSE ELECTRIC CORPORATION
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Three Mile Island 2 2.0 TWh 69.3% 69.3% 74.6%
Operator: GENERAL PUBLIC UTILITIES (owned by FirstEnergy Corp.)
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-12.

Working Here

Per Diem Rates FY 2027

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2027.
$129
Lodging/Night
$74
M&IE/Day
$203
Total/Day
Harrisburg, Dauphin excluding Hershey County, PA

Unemployment Benefits PA

?
Maximum state unemployment insurance benefits for PA. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$605
Max Weekly
26
Max Weeks
$15,730
Max Total
7-day waiting period before benefits begin

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Route 441 South
Middletown, PA 17057, USA
Get Directions
Phone: (717) 948-8000

Plant Facts

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: EnergySolutions
Publicly Traded No — Privately held; taken private by Energy Capital Partners in 2013

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: PWR
NSS Supplier: B&W
Net Capacity: 880 MWe
Status: SAFSTOR

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Const. Permit: 1969-11-01
Operating Lic: 1978-04-21
Commercial Op: 1978-12-30