Tianwan

Technical specifications, photos, nearby jobs, and satellite map for Tianwan.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
8 units: 7 operational, 1 under construction. Net capacity in service: 7,411 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Tianwan 1 PWR VVER V-428 1,000 1999-10-20 2006-05-12 2007-05-17 Operational
Tianwan 2 PWR VVER V-428 1,000 2000-09-20 2007-05-14 2007-08-16 Operational
Tianwan 3 PWR VVER V-428M 1,060 2012-12-27 2017-12-30 2018-02-14 Operational
Tianwan 4 PWR VVER V-428M 1,060 2013-09-27 2018-10-27 2018-12-22 Operational
Tianwan 5 PWR CNP-1000 1,060 2015-12-27 2020-08-08 2020-09-08 Operational
Tianwan 6 PWR CNP-1000 1,060 2016-09-07 2021-05-11 2021-06-02 Operational
Tianwan 8 PWR VVER-1200/V491 1,171 2022-02-25 Under Construction
Tianwan 7 PWR VVER-1200/V491 1,171 2021-05-19 2026-10-08 Operational
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Tianwan 1 990 1,060 3,000 2005-12-20 Izhorskiye Zavody JOINT-STOCK COMPANY "LENINGRADSKIY METALLICHESKIY ZAVOD"
Tianwan 2 990 1,060 3,000 2007-05-01 Izhorskiye Zavody JOINT-STOCK COMPANY "LENINGRADSKIY METALLICHESKIY ZAVOD"
Tianwan 3 1,060 1,126 3,000 2017-09-29 Izhorskiye Zavody HARBIN TURBINE COMPANY LIMITED
Tianwan 4 1,060 1,126 3,000 2018-09-30 Izhorskiye Zavody HARBIN TURBINE COMPANY LIMITED
Tianwan 5 1,000 1,118 2,905 2020-07-27 Shanghai Electric Dongfang Electric Corporation
Tianwan 6 1,000 1,118 2,905 2021-05-04 China First Heavy Industries Dongfang Electric Corporation
Tianwan 8 1,171 1,265 3,200 Atommash AEM-Technologies Shanghai Electric Group
Tianwan 7 1,171 1,265 3,200 Atommash AEM-Technologies Shanghai Electric Group Grid connection 2026-10-08 per CNNC (World Nuclear News); not yet in IAEA PRIS
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Tianwan 1 140.0 TWh 87.3% 88.8% 88.4%
Tianwan 2 139.8 TWh 88.6% 90.1% 90.0%
Tianwan 3 60.4 TWh 82.9% 89.2% 89.1%
Tianwan 4 56.3 TWh 85.6% 92.2% 90.7%
Tianwan 5 44.0 TWh 89.5% 92.0% 92.5%
Tianwan 6 37.8 TWh 90.7% 95.0% 96.1%
Operator: Jiangsu Nuclear Power Corporation
Owner: Jiangsu Nuclear Power Corporation; CHINA NATIONAL NUCLEAR CORPORATION
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-14.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$170
Lodging/Night
$98
M&IE/Day
$268
Total/Day
China: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Lianyungang, Jiangsu, China
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Tianwan Nuclear Power Plant.

Tianwan is a nuclear power plant site on the Yellow Sea coast, about 30 km east of downtown Lianyungang, Jiangsu Province, China.

Read more

China and Russia signed a nuclear cooperation agreement in 1992 that became the basis for the plant, and regulators approved the initial design in 1997. Construction of Units 1 and 2, Russian VVER-1000 pressurized water reactors, began in October 1999 and October 2000. They were connected to the grid on 12 May 2006 and 14 May 2007. Units 3 and 4 are VVER-1000/428M units, begun in December 2012 and September 2013. Units 5 and 6 are Chinese ACPR-1000 units, begun in December 2015 and September 2016. Construction of the VVER-1200 Units 7 and 8 began in May 2021 and February 2022.