Tianwan
Reactor Data
Reactor Units
| Unit | Type | Model | Net MWe | Construction | Grid | Commercial Op | Shutdown | Status |
|---|---|---|---|---|---|---|---|---|
| Tianwan 1 | PWR | VVER V-428 | 1,000 | 1999-10-20 | 2006-05-12 | 2007-05-17 | Operational | |
| Tianwan 2 | PWR | VVER V-428 | 1,000 | 2000-09-20 | 2007-05-14 | 2007-08-16 | Operational | |
| Tianwan 3 | PWR | VVER V-428M | 1,060 | 2012-12-27 | 2017-12-30 | 2018-02-14 | Operational | |
| Tianwan 4 | PWR | VVER V-428M | 1,060 | 2013-09-27 | 2018-10-27 | 2018-12-22 | Operational | |
| Tianwan 5 | PWR | CNP-1000 | 1,060 | 2015-12-27 | 2020-08-08 | 2020-09-08 | Operational | |
| Tianwan 6 | PWR | CNP-1000 | 1,060 | 2016-09-07 | 2021-05-11 | 2021-06-02 | Operational | |
| Tianwan 8 | PWR | VVER-1200/V491 | 1,171 | 2022-02-25 | Under Construction | |||
| Tianwan 7 | PWR | VVER-1200/V491 | 1,171 | 2021-05-19 | 2026-10-08 | Operational |
| Unit | Design MWe | Gross MWe | Thermal MWt | First Criticality | Reactor Supplier | Turbine Supplier | Notes |
|---|---|---|---|---|---|---|---|
| Tianwan 1 | 990 | 1,060 | 3,000 | 2005-12-20 | Izhorskiye Zavody | JOINT-STOCK COMPANY "LENINGRADSKIY METALLICHESKIY ZAVOD" | |
| Tianwan 2 | 990 | 1,060 | 3,000 | 2007-05-01 | Izhorskiye Zavody | JOINT-STOCK COMPANY "LENINGRADSKIY METALLICHESKIY ZAVOD" | |
| Tianwan 3 | 1,060 | 1,126 | 3,000 | 2017-09-29 | Izhorskiye Zavody | HARBIN TURBINE COMPANY LIMITED | |
| Tianwan 4 | 1,060 | 1,126 | 3,000 | 2018-09-30 | Izhorskiye Zavody | HARBIN TURBINE COMPANY LIMITED | |
| Tianwan 5 | 1,000 | 1,118 | 2,905 | 2020-07-27 | Shanghai Electric | Dongfang Electric Corporation | |
| Tianwan 6 | 1,000 | 1,118 | 2,905 | 2021-05-04 | China First Heavy Industries | Dongfang Electric Corporation | |
| Tianwan 8 | 1,171 | 1,265 | 3,200 | Atommash AEM-Technologies | Shanghai Electric Group | ||
| Tianwan 7 | 1,171 | 1,265 | 3,200 | Atommash AEM-Technologies | Shanghai Electric Group | Grid connection 2026-10-08 per CNNC (World Nuclear News); not yet in IAEA PRIS |
| Unit | Electricity Supplied | Load Factor | Energy Availability | Operating Factor |
|---|---|---|---|---|
| Tianwan 1 | 140.0 TWh | 87.3% | 88.8% | 88.4% |
| Tianwan 2 | 139.8 TWh | 88.6% | 90.1% | 90.0% |
| Tianwan 3 | 60.4 TWh | 82.9% | 89.2% | 89.1% |
| Tianwan 4 | 56.3 TWh | 85.6% | 92.2% | 90.7% |
| Tianwan 5 | 44.0 TWh | 89.5% | 92.0% | 92.5% |
| Tianwan 6 | 37.8 TWh | 90.7% | 95.0% | 96.1% |
Working Here
Per Diem Rates FY 2026
Photos
Facility Map
34.6869, 119.46
Location & Contact
Plant Facts
About This Site
Tianwan is a nuclear power plant site on the Yellow Sea coast, about 30 km east of downtown Lianyungang, Jiangsu Province, China.
Read more
China and Russia signed a nuclear cooperation agreement in 1992 that became the basis for the plant, and regulators approved the initial design in 1997. Construction of Units 1 and 2, Russian VVER-1000 pressurized water reactors, began in October 1999 and October 2000. They were connected to the grid on 12 May 2006 and 14 May 2007. Units 3 and 4 are VVER-1000/428M units, begun in December 2012 and September 2013. Units 5 and 6 are Chinese ACPR-1000 units, begun in December 2015 and September 2016. Construction of the VVER-1200 Units 7 and 8 began in May 2021 and February 2022.