Tomari

Technical specifications, photos, nearby jobs, and satellite map for Tomari.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
3 units: 3 suspended operation. Net capacity in service: 1,966 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Tomari 1 PWR M (2-loop) 550 1985-04-18 1988-12-06 1989-06-22 Suspended Operation
Tomari 2 PWR M (2-loop) 550 1985-06-13 1990-08-27 1991-04-12 Suspended Operation
Tomari 3 PWR M (3-loop) 866 2004-11-18 2009-03-20 2009-12-22 Suspended Operation
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Tomari 1 550 579 1,650 1988-11-16 MITSUBISHI HEAVY INDUSTRIES, LTD. MITSUBISHI HEAVY INDUSTRIES, LTD. Suspended 2011-04-22
Tomari 2 550 579 1,650 1990-07-25 MITSUBISHI HEAVY INDUSTRIES, LTD. MITSUBISHI HEAVY INDUSTRIES, LTD. Suspended 2011-08-26
Tomari 3 866 912 2,660 2009-03-03 MITSUBISHI HEAVY INDUSTRIES, LTD. MITSUBISHI HEAVY INDUSTRIES, LTD. Suspended 2012-05-05
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Tomari 1 91.0 TWh 85.7% 84.9% 85.3%
Tomari 2 83.6 TWh 84.2% 82.9% 83.3%
Tomari 3 19.6 TWh 93.8% 89.9% 90.1%
Operator: HOKKAIDO ELECTRIC POWER CO., INC.
Owner: HOKKAIDO ELECTRIC POWER CO., INC.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$208
Lodging/Night
$107
M&IE/Day
$315
Total/Day
Japan: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Tomari, Hokkaido Prefecture, Japan
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Tomari Nuclear Power Plant.

Tomari Nuclear Power Plant is in the town of Tomari, Furuu District, in Hokkaido, Japan.

Read more

Construction began on 18 April 1985. All three units are pressurized water reactors of Mitsubishi design. Unit 1 was connected to the grid on 6 December 1988, Unit 2 on 27 August 1990 and Unit 3 on 20 March 2009, with commercial operation following in 1989, 1991 and December 2009. When Unit 3 was shut down for inspection on 5 May 2012, none of Japan's 50 reactors was generating power.