Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
4 units: 4 operational.
Net capacity in service: 3,660 MWe.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.
Fuel Cycle Facilities
?
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
10 facilities: 4 in operation, 1 shutdown, 3 decommissioning, 1 decommissioned, 1 under construction.
Facility
Type
Scale
Design Capacity
Operated
Status
Operator
Comurhex Pierrelatte (UF6)
Conversion to UF6
Commercial
14000 t HM/year
1961–
In Operation
New Areva
Areva NC W Plant
Re-Conversion to U3O8 (Rep. U)
Commercial
14000 t HM/year
1984–
In Operation
Orano
ORANO TU5 Plant
Re-Conversion to U3O8 (Rep. U)
Commercial
1600 t HM/year
1995–
In Operation
Orano
Georges Besse II
Uranium Enrichment
Commercial
7500 MTSWU/year
2011–
In Operation
Orano
Comurhex Pierrelatte (Rep. U)
Conversion to UF6
Commercial
350 t HM/year
1976–
Shutdown
New Areva
Eurodif (Georges Besse)
Uranium Enrichment
Commercial
10800 MTSWU/year
1979–2011
Decommissioning
Orano
Framatome - Pierrelatte
Fuel Fabrication (U Pellet, Pin, FA)
Commercial
500 t HM/year
1986–1999
Decommissioned
Framatome
TU2 Cogema
Conversion to UO2
Commercial
350 t HM/year
1988–
Decommissioning
Orano
TU2 Cogema Reprocessing Line
Re-Conversion to U3O8 (Rep. U)
Commercial
1200 t HM/year
1988–
Decommissioning
Orano
Comurhex II - Pierrelatte (UF6)
Conversion to UF6
Commercial
15000 t HM/year
2018–
Under Construction
New Areva
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.
Working Here
Per Diem Rates
FY 2026
?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$220
Lodging/Night
$132
M&IE/Day
$352
Total/Day
France: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
44.329, 4.72154
Location & Contact
?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Saint-Paul-Trois-Châteaux, Auvergne-Rhône-Alpes, France
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Tricastin Nuclear Power Plant.
Tricastin is a nuclear site beside the Donzère-Mondragon canal in southeastern France, near Pierrelatte and Saint-Paul-Trois-Châteaux, in the Drôme department. It has four pressurized water reactors of the CP1 design, supplied by Framatome, and fuel cycle plants on the wider site.
Read more
Construction began on unit 1 in November 1974, unit 2 in December 1974, unit 3 in April 1975 and unit 4 in May 1975, and the units were first connected to the grid between May 1980 and June 1981. The Eurodif gaseous diffusion enrichment plant ran from 1979 to 2012. In July 2008, about 18,000 liters of uranium solution overflowed from a tank, and some of it reached the ground; the event was rated level 1 on the International Nuclear Event Scale.