Trojan

DECON

Portland General Electric·Rainier, OR·PWR·1,095 MWe

Community ratings, technical specifications, photos, nearby jobs, satellite map, contact information, and per diem rates for Trojan.

DECON

Permanently shut down on 1992-11-09.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
1 unit: 1 permanent shutdown.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Trojan PWR 1,095 1970-02-01 1975-12-23 1976-05-20 1992-11-09 Permanent Shutdown
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Trojan 1,130 1,155 3,411 1975-12-15 WESTINGHOUSE ELECTRIC CORPORATION
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Trojan 84.4 TWh 53.5% 57.7% 57.7%
Operator: PORTLAND GENERAL ELECTRIC CO.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-11-02.

Fuel Cycle Facilities

?
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
1 facility: 1 in operation.
Facility Type Scale Design Capacity Operated Status Operator
Trojan NPP Site (shutdown) ISFSI AFR Dry Spent Fuel Storage Commercial 359 t HM In Operation Portland General Electric Company
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.

Working Here

Per Diem Rates FY 2027

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2027.
$113
Lodging/Night
$68
M&IE/Day
$181
Total/Day
Standard Rate, OR

Unemployment Benefits OR

?
Maximum state unemployment insurance benefits for OR. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$835
Max Weekly
26
Max Weeks
$21,710
Max Total
7-day waiting period before benefits begin

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
71760 Columbia River Highway
Rainier, OR 97048, USA
Get Directions
Phone: (503) 556-4484

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Trojan Nuclear Plant.

Trojan Nuclear Plant was on the west bank of the Columbia River in Columbia County, Oregon, near Rainier and about 30 miles north of Portland. Portland General Electric built and operated it, with a single Westinghouse pressurized water reactor.

Read more

Construction began on February 1, 1970. The unit connected to the grid in December 1975 and entered commercial operation on May 20, 1976. It closed permanently in 1992 after repeated cracking of steam generator tubes proved too costly to repair, and in January 1993 the utility announced it would not restart the plant. Spent fuel was moved to dry storage casks in 2003. The reactor vessel was removed in 2005 and buried whole at the Hanford Site in Washington, and the 499-foot cooling tower was imploded on May 21, 2006.

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
POR Portland General Electric Company NYSE
$44.86 ▼ -0.66 (-1.44%)
Previous Close 45.52
Day's Range 44.86 – 45.41
52-Week Range 43.26 – 54.62
Volume 855,018
Delayed quote as of Nov 3, 2026 3:41 PM ET. Source: Yahoo Finance. Full quote on Yahoo Finance

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: PWR
NSS Supplier: Westinghouse
Net Capacity: 1095 MWe
Status: DECON

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Const. Permit: 1970-02-01
Operating Lic: 1975-12-23
Commercial Op: 1976-05-20