Vermont Yankee

Decommissioned

NorthStar Group Services·Vernon, VT·BWR·506 MWe

Operational history, outage history & performance charts, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for Vermont Yankee.

Decommissioned

Permanently shut down on 2014-12-29. View Outage History →

Excellence Score, Records & Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Vermont Yankee Nuclear Power Plant.

Vermont Yankee Nuclear Power Plant was on the Connecticut River at Vernon, Vermont, which supplied its cooling water. It had one General Electric BWR-4 boiling water reactor with Mark I containment.

Read more

The Vermont Yankee Nuclear Power Corporation was the original owner, and the plant entered commercial operation on November 30, 1972. Entergy bought it in 2002. In February 2010 tritium was found in groundwater near the reactor, traced to steam pipes and repaired, and the Vermont Senate voted 26 to 4 against allowing the Public Service Board to consider re-certifying the plant beyond 2012. Entergy shut the reactor down on December 29, 2014. All spent fuel was in dry storage casks by August 2018, and two cooling towers were demolished in July 2019.

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Vermont Yankee has operated for about 42.1 years and averaged a 92.2% lifetime capacity factor, generating roughly 65.5 TWh of electricity. Its longest unbroken run reached 4,293 days.
Lifecycle & Tenure
Operating Age: 42.1 Yrs
Build Time: 5 Yrs
Lic. Remaining: N/A Yrs
Production & Power
Lifetime CF: 92.2%
Efficiency: 31.8%
Generated: 65.5 TWh
Reliability & Outages
Record Run: 4,293 Days
Refuelings: 10
Avg Startup: 4.2 Days

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: NorthStar Group Services
Architect Engineer: EBSO
Constructor: EBSO
Ownership, operation and management history
DateChange FromTo
Jul 2002 Sold Vermont Yankee Nuclear Power Corp Entergy
Jan 11, 2019 Sold Entergy NorthStar
Publicly Traded No — Privately held

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: BWR
Containment: BWR-MARK 1
NSS Supplier: GE 4
Turbine Supplier: GENERAL ELECTRIC CO. IAEA
Thermal Power: 1593 MWt
Net Capacity: 506 MWe
Gross Capacity: 635 MWe IAEA
Design Capacity: 514 MWe IAEA
Efficiency: 31.8%
Lifetime Output: 163.4 TWh through 2025 IAEA

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000271
License #: DPR-28
License Type: OL-FP
Const. Permit: 1967-12-11
Construction Start: 1967-12-11 IAEA
Operating Lic: 1973-02-28
First Criticality: 1972-03-24 IAEA
Grid Connection: 1972-09-20 IAEA
Commercial Op: 1972-11-30
License Renewed: 2011-03-21
License Exp: 2012-03-21