Yankee Rowe

DECON

Yankee Atomic Power·Rowe, MA·PWR·167 MWe

Technical specifications, photos, nearby jobs, satellite map, contact information, and per diem rates for Yankee Rowe.

DECON

Permanently shut down on 1991-10-01.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
1 unit: 1 permanent shutdown.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Yankee Rowe PWR PWR 167 1957-11-01 1960-11-10 1961-07-01 1991-10-01 Permanent Shutdown
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Yankee Rowe 175 180 600 1960-08-19 WESTINGHOUSE ELECTRIC CORPORATION WESTINGHOUSE ELECTRIC CORPORATION
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Yankee Rowe 33.9 TWh 71.5% 79.2% 77.1%
Operator: YANKEE ATOMIC ELECTRIC CO.
Owner: YANKEE ATOMIC ELECTRIC CO.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-14.

Fuel Cycle Facilities

?
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
1 facility: 1 in operation.
Facility Type Scale Design Capacity Operated Status Operator
Yankee Rowe NPP Site (shutdown) ISFSI AFR Dry Spent Fuel Storage Commercial 190 t HM 1991– In Operation Yankee Atomic Electric
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.

Working Here

Per Diem Rates FY 2027

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2027.
$113
Lodging/Night
$68
M&IE/Day
$181
Total/Day
Standard Rate, MA

Unemployment Benefits MA

?
Maximum state unemployment insurance benefits for MA. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$1,105
Max Weekly
30
Max Weeks
$33,150
Max Total
7-day waiting period before benefits begin

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
49 Yankee Road
Rowe, MA 01367, USA
Get Directions
Phone: (413) 424-2283

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Yankee Rowe Nuclear Power Station.

Yankee Rowe Nuclear Power Station was a 180-megawatt pressurized water reactor plant at Rowe, Massachusetts, on the Deerfield River. It was the third commercial nuclear plant in the United States and the first in New England.

Read more

Yankee Atomic Electric Company, owned by ten New England utilities, built and ran the plant. The first self-sustaining reaction took place on August 19, 1960, and commercial operation began in 1961. It was closed early in 1991 because of concerns about embrittlement of the reactor pressure vessel. The NRC declared decommissioning complete in August 2007, at a total cost of $608 million.

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Yankee Atomic Power
Publicly Traded No — Dissolved decommissioning trust company

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: PWR
NSS Supplier: Westinghouse
Net Capacity: 167 MWe
Status: DECON

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Const. Permit: 1957-11-01
Operating Lic: 1960-11-10
Commercial Op: 1961-07-01