Zaporozhye

Technical specifications, photos, nearby jobs, and satellite map for Zaporozhye.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
6 units: 6 operational. Net capacity in service: 5,700 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Zaporizhzhia 1 PWR VVER V-320 950 1980-04-01 1984-12-10 1985-12-25 Operational
Zaporizhzhia 2 PWR VVER V-320 950 1981-01-01 1985-07-22 1986-02-15 Operational
Zaporizhzhia 3 PWR VVER V-320 950 1982-04-01 1986-12-10 1987-03-05 Operational
Zaporizhzhia 4 PWR VVER V-320 950 1983-04-01 1987-12-18 1988-04-14 Operational
Zaporizhzhia 5 PWR VVER V-320 950 1985-11-01 1989-08-14 1989-10-27 Operational
Zaporizhzhia 6 PWR VVER V-320 950 1986-06-01 1995-10-19 1996-09-17 Operational
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Zaporizhzhia 1 950 1,000 3,000 1984-12-07 PRODUCTION AMALGAMATION IZHORSKY PLANT ATOMMASH,VOLGODONSK,RUSSIA Kharkiv Turbine Plant "Turboatom"
Zaporizhzhia 2 950 1,000 3,000 1985-06-28 PRODUCTION AMALGAMATION IZHORSKY PLANT ATOMMASH,VOLGODONSK,RUSSIA Kharkiv Turbine Plant "Turboatom"
Zaporizhzhia 3 950 1,000 3,000 1986-12-04 PRODUCTION AMALGAMATION IZHORSKY PLANT ATOMMASH,VOLGODONSK,RUSSIA Kharkiv Turbine Plant "Turboatom"
Zaporizhzhia 4 950 1,000 3,000 1987-12-15 PRODUCTION AMALGAMATION IZHORSKY PLANT ATOMMASH,VOLGODONSK,RUSSIA Kharkiv Turbine Plant "Turboatom"
Zaporizhzhia 5 950 1,000 3,000 1989-07-20 PRODUCTION AMALGAMATION IZHORSKY PLANT ATOMMASH,VOLGODONSK,RUSSIA Kharkiv Turbine Plant "Turboatom"
Zaporizhzhia 6 950 1,000 3,000 1995-10-06 PRODUCTION AMALGAMATION IZHORSKY PLANT ATOMMASH,VOLGODONSK,RUSSIA Kharkiv Turbine Plant "Turboatom"
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Zaporizhzhia 1 195.1 TWh 65.2% 66.7% 71.1%
Zaporizhzhia 2 195.0 TWh 66.2% 68.5% 72.6%
Zaporizhzhia 3 197.3 TWh 69.6% 71.3% 76.5%
Zaporizhzhia 4 196.2 TWh 71.4% 72.9% 76.3%
Zaporizhzhia 5 187.3 TWh 71.8% 73.4% 77.0%
Zaporizhzhia 6 164.5 TWh 77.8% 78.6% 80.5%
Operator: State Enterprise “National Nuclear Energy Generating Company ‘Energoatom”
Owner: State Enterprise “National Nuclear Energy Generating Company ‘Energoatom”
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-12.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$140
Lodging/Night
$97
M&IE/Day
$237
Total/Day
Ukraine: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Enerhodar, Zaporizhia Oblast, Ukraine
Get Directions