Arkansas Nuclear 2

Online · 100% power

Entergy·Russellville, AR·PWR·985 MWe

Data refreshed 10.6h ago Rx Status: Oct 15, 2026 at 5:21 AM (M-F)

Reactor Status Timeline

Online NRC data, Mon to Fri ? Actual daily reactor status from NRC reports (Mon to Fri) and the current state. What is coming -- the utility's published Scheduled outage and NukeWorker's model Projection -- is part of a subscription. Colored by status. How far ahead you can see depends on your plan.
Nov2025DecJan2026FebMarAprMayJunJulAugSepOctOnline: Oct 15, 2025 to Feb 18, 2026Coastdown: Feb 19, 2026 to Mar 13, 2026Refueling Outage (2R31): Mar 14, 2026 to Apr 30, 20262R31Power Ascension: May 1, 2026 to May 3, 2026Online: May 4, 2026 to Jun 7, 2026Reduced Power: Jun 8, 2026 to Jun 11, 2026Online: Jun 12, 2026 to Oct 15, 2026Today
OnlineReduced PowerCoastdownPower AscensionRefueling Outage
?
Composite Operational Excellence Score (0-100) — average percentile rank across 7 dimensions in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). 5-year window. Higher = more operationally excellent. Click to see the full breakdown.
   
Excellence
Rank locked · 93 units
Subscribers
?
Days of continuous operation since the last outage ended (Started 2026-04-30). Clean run (no forced outages since last refueling).
168
Current Run
days ✔
?
Longest recorded period of continuous operation between outages (2005-04-10 to 2006-09-20).
528
Record Run
days
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold set for this unit with no trips to 0% power.
6
B2B Runs
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power).
87.8%
Capacity Factor
?
Net electricity actually generated over the most recent 12 months reported by the U.S. EIA (Form EIA-923), summed across every unit at this plant. Authoritative actuals, not an estimate.
14.08 TWh
Net Generation
EIA-923 · 12 mo to 2026-07 · plant total
?
Total number of scheduled refueling outages detected in the historical data.
19
Outages
since 1999
?
Average time from first power generation (>0%) to sustained full power (≥95% for 2+ days) across the last 3 scheduled outages. Click to compare against the fleet on the Operator Efficiency Leaderboard.
3.3
Avg Startup
days (last 3)
?
Average fuel utilization — percent of the designed fuel cycle that this unit consumes before refueling, derived from the historical burn-down trajectory. Higher = more efficient operator (refuels with less margin remaining; closer to coastdown). Computed as 100% minus the unit's average refuel-point fuel %, using the last 3 years where available, otherwise lifetime average. Click to compare against the fleet on the Operator Efficiency Leaderboard.
98.2%
Fuel Utilization
3yr avg

Reactor Status

Capacity Factor (365-Day)

?
100%
Current
85.4%
365-Day Avg
#68
of 94 plants
Min: 0% Max: 100% 54 days <80%

Outage Days by Year

?
Total days spent in outage each year, split by scheduled refueling (blue) and forced/unplanned (red). Lower totals indicate better reliability and outage execution. Hover for details.
Across its recorded history, Arkansas Nuclear 2 has spent 838 days in scheduled refueling outages and 252 days in forced or unplanned outages. Taller bars mark the years with the most downtime.
?
Duration of each outage in days, shown chronologically. Green bars are scheduled refueling outages, red bars are forced/unscheduled. The orange dashed line marks the average duration. Extended outages (>180 days) and D&D periods are excluded.

Outage Duration Trend

Arkansas Nuclear 2 has 41 outages plotted here, averaging 27 days each. The most recent, in Mar 2026, was a scheduled refueling outage lasting 48 days.
?
Scheduled refueling outage durations over time. Green bars are at or below this unit's average, amber up to 30% above it, red beyond that. The dashed line is the average. Shorter outages mean better execution.

Refueling Duration Trend

Arkansas Nuclear 2 has completed 19 scheduled refueling outages on record, averaging 44 days each. The most recent, in Mar 2026, ran 48 days.
?
Time in days from first power generation (>0%) to sustained full power (≥95% for 2+ consecutive days) after each scheduled refueling outage. The dashed line marks the average. Includes startup testing holds and power dips.

Startup Duration Trend

After a refueling outage, Arkansas Nuclear 2 takes about 4 days to climb from first power back to full power. That average is drawn from 19 startups on record, and the most recent took 3 days.
?
Daily reactor power over the 120 days before each scheduled refueling outage, one line per refueling, lined up on the day the outage began. A coastdown is the slow decline as the fuel runs out near the end of a cycle. The highlighted line is the most recent refueling and fainter lines are older. Counts and medians cover coastdowns of a week or longer. A shutdown straight from full power, with no decline ahead of it, is what a forced outage looks like.

Coastdown Before Refueling

8 of 18 refuelings 25 days median 79% power at shutdown 0.7% per day
Arkansas Nuclear 2 coasted down for a week or longer before 8 of its 18 refuelings on record. Those coastdowns ran a median of 25 days and ended near 79% power. The most recent refueling, in Mar 2026, followed a 23-day coastdown from 97% to 80%.
?
Estimated fuel remaining in the current cycle, expressed as a percentage of the unit's typical cycle. Starts at 100% when the unit returns to power post-refuel and drops as full-power-days are burned. Days at reduced power burn fuel proportionally — so a unit with significant downtime (high burn deficit) drops slower and ends up with MORE fuel left than its calendar position would suggest. Coastdown threshold around 15%. Toggle to overlay past cycles on a normalized "days into cycle" axis to see how aggressively this unit historically burns down before refuel.

Fuel Burn Down Cycle since May 1, 2026

67.0% remaining 2.2 FPD margin
Arkansas Nuclear 2 has an estimated 67.0% of its fuel left. Across its last 18 cycles, it has refueled with an average of 3.9% remaining.
Avg refuel: 3.9% Avg refuel (3yr): 1.8% Deepest burn: 0.0% (1999-02 → 2000-09) Most margin: 18.3% (2018-11 → 2020-03)
?
Monthly capacity factor with outage events overlaid as red bands. Green bars show average power level per month. Toggle to Daily view for raw daily data.

Power History

Over its operating life, Arkansas Nuclear 2 has run at about 87.8% of its rated capacity. Across the last 12 reported months it averaged 85.3%. On the chart, green stretches near the top are full-power running, amber marks reduced power (50 to 89%), and red drops toward zero are outages.

Outage History & Daily Power Log

This table logs every recorded outage for Arkansas Nuclear 2, 41 in all since 1999. Of those, 19 were scheduled refueling outages and 22 were unplanned or forced. The typical outage lasted about 27 days. Where the Scheduled column shows (Model), the date is a NukeWorker projection because the utility had not published one.
Scheduled 2R31
2026-03-14 2026-04-30 48 502d 2026-03-07 +7d
Scheduled 2R30
2024-09-28 2024-10-28 31 495d 2024-10-06 -8d
Scheduled 2R29
2023-04-15 2023-05-22 38 504d 2023-04-15 0d
Scheduled 2R28
2021-09-25 2021-11-27 64 286d 2021-09-25 0d
Scram # 55028 Auto
2020-12-11 2020-12-13 3 38d - -
Unscheduled
2020-11-02 2020-11-03 2 196d - -
Scheduled 2R27
2020-03-13 2020-04-20 39 228d 2020-03-14 -1d
Scram # 54091 Auto
2019-05-27 2019-07-29 64 189d - -
Scheduled 2R26
2018-09-17 2018-11-19 64 437d 2018-09-15 +2d
Scheduled 2R25SGR/Major
2017-03-29 2017-07-07 101 153d 2017-04-01 -3d
Unscheduled
2016-09-29 2016-10-27 29 211d - -
Unscheduled
2016-02-24 2016-03-02 8 103d - -
Scheduled 2R24
2015-09-21 2015-11-13 54 467d 2015-09-20 +1d
Scheduled # 50063 Auto 2R23
2014-04-28 2014-06-11 45 24d 2014-03-09 +50d
Scram # 49995 Auto
2014-04-04 2014-04-04 1 84d - -
Scram # 49618 Auto
2013-12-10 2014-01-10 32 226d - -
Scram # 48869 Auto
2013-04-01 2013-04-28 28 173d - -
Scheduled 2R22
2012-09-14 2012-10-10 27 36d 2012-09-13 +1d
Scram # 48169 Auto
2012-08-09 2012-08-09 1 503d - -
Scheduled 2R21
2011-02-21 2011-03-25 33 171d 2011-02-20 +1d
Unscheduled
2010-08-24 2010-09-03 11 258d - -
Unscheduled
2009-12-09 2009-12-09 1 76d - -
Scheduled 2R20
2009-09-02 2009-09-24 23 170d 2009-09-22 -20d
Unscheduled
2009-03-14 2009-03-16 3 58d - -
Unscheduled
2009-01-15 2009-01-15 1 280d - -
Scheduled 2R19
2008-03-17 2008-04-10 25 410d 2008-03-16 +1d
Unscheduled
2007-01-26 2007-02-01 7 87d - -
Unscheduled
2006-10-31 2006-10-31 1 4d - -
Scheduled 2R18
2006-09-20 2006-10-27 38 528d 2006-09-19 +1d
Scheduled 2R17
2005-03-09 2005-04-10 33 158d 2005-03-08 +1d
Unscheduled
2004-09-28 2004-10-02 5 233d - -
Unscheduled
2004-02-07 2004-02-08 2 40d - -
Unscheduled
2003-12-26 2003-12-29 4 73d - -
Scheduled 2R16
2003-09-24 2003-10-14 21 508d 2003-09-24 0d
Scheduled 2R15
2002-04-13 2002-05-04 22 162d 2002-04-13 0d
Unscheduled
2001-11-02 2001-11-02 1 284d - -
Unscheduled
2001-01-18 2001-01-22 5 41d - -
Scheduled 2R14SGR/Major
2000-09-16 2000-12-08 84 31d 2000-09-16 0d
Unscheduled
2000-07-22 2000-08-16 26 242d - -
Unscheduled
1999-11-07 1999-11-23 17 255d - -
Scheduled 2R13
1999-01-09 1999-02-25 48 - 1999-01-09 0d
Page created in 0.227 seconds with 12 queries (cached).