Reactor Status Timeline

Online NRC data, Mon to Fri ? Actual daily reactor status from NRC reports (Mon to Fri) and the current state. What is coming -- the utility's published Scheduled outage and NukeWorker's model Projection -- is part of a subscription. Colored by status. How far ahead you can see depends on your plan.
Nov2025DecJan2026FebMarAprMayJunJulAugSepOctNovRefueling Outage: Oct 19, 2025 to Dec 2, 2025Power Ascension: Dec 3, 2025 to Dec 6, 2025Online: Dec 7, 2025 to Feb 8, 2026Reduced Power: Feb 9, 2026 to Feb 10, 2026Online: Feb 11, 2026Reduced Power: Feb 12, 2026 to Feb 13, 2026Online: Feb 14, 2026 to Oct 19, 2026Today
OnlineReduced PowerPower AscensionRefueling Outage
?
Composite Operational Excellence Score (0-100) — average percentile rank across 7 dimensions in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). 5-year window. Higher = more operationally excellent. Click to see the full breakdown.
   
Excellence
Rank locked · 93 units
Subscribers
?
Days of continuous operation since the last outage ended (Started 2025-12-02). Clean run (no forced outages since last refueling).
321
Current Run
days ✔
?
Longest recorded period of continuous operation between outages (2022-11-09 to 2024-04-06).
514
Record Run
days
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold set for this unit with no trips to 0% power.
6
B2B Runs
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power).
89.2%
Capacity Factor
?
Net electricity actually generated over the most recent 12 months reported by the U.S. EIA (Form EIA-923), summed across every unit at this plant. Authoritative actuals, not an estimate.
31.17 TWh
Net Generation
EIA-923 · 12 mo to 2026-07 · plant total
?
Total number of scheduled refueling outages detected in the historical data.
18
Outages
since 2000
?
Average time from first power generation (>0%) to sustained full power (≥95% for 2+ days) across the last 3 scheduled outages. Click to compare against the fleet on the Operator Efficiency Leaderboard.
5.3
Avg Startup
days (last 3)
?
Average fuel utilization — percent of the designed fuel cycle that this unit consumes before refueling, derived from the historical burn-down trajectory. Higher = more efficient operator (refuels with less margin remaining; closer to coastdown). Computed as 100% minus the unit's average refuel-point fuel %, using the last 3 years where available, otherwise lifetime average. Click to compare against the fleet on the Operator Efficiency Leaderboard.
99.6%
Fuel Utilization
3yr avg

Reactor Status

Capacity Factor (365-Day)

?
100%
Current
86.8%
365-Day Avg
#51
of 94 plants
Min: 0% Max: 100% 49 days <80%

Outage Days by Year

?
Total days spent in outage each year, split by scheduled refueling (blue) and forced/unplanned (red). Lower totals indicate better reliability and outage execution. Hover for details.
Across its recorded history, Palo Verde 3 has spent 796 days in scheduled refueling outages and 165 days in forced or unplanned outages. Taller bars mark the years with the most downtime.
?
Duration of each outage in days, shown chronologically. Green bars are scheduled refueling outages, red bars are forced/unscheduled. The orange dashed line marks the average duration. Extended outages (>180 days) and D&D periods are excluded.

Outage Duration Trend

Palo Verde 3 has 46 outages plotted here, averaging 21 days each. The most recent, in Oct 2025, was a scheduled refueling outage lasting 60 days.
?
Scheduled refueling outage durations over time. Green bars are at or below this unit's average, amber up to 30% above it, red beyond that. The dashed line is the average. Shorter outages mean better execution.

Refueling Duration Trend

Palo Verde 3 has completed 18 scheduled refueling outages on record, averaging 44 days each. The most recent, in Oct 2025, ran 60 days.
?
Time in days from first power generation (>0%) to sustained full power (≥95% for 2+ consecutive days) after each scheduled refueling outage. The dashed line marks the average. Includes startup testing holds and power dips.

Startup Duration Trend

After a refueling outage, Palo Verde 3 takes about 5 days to climb from first power back to full power. That average is drawn from 18 startups on record, and the most recent took 4 days.
?
Daily reactor power over the 120 days before each scheduled refueling outage, one line per refueling, lined up on the day the outage began. A coastdown is the slow decline as the fuel runs out near the end of a cycle. The highlighted line is the most recent refueling and fainter lines are older. Counts and medians cover coastdowns of a week or longer. A shutdown straight from full power, with no decline ahead of it, is what a forced outage looks like.

Coastdown Before Refueling

2 of 18 refuelings 11 days median 89% power at shutdown 0.8% per day
Palo Verde 3 coasted down for a week or longer before 2 of its 18 refuelings on record. Those coastdowns ran a median of 11 days and ended near 89% power. The most recent refueling, in Oct 2025, began with no extended coastdown.
?
Estimated fuel remaining in the current cycle, expressed as a percentage of the unit's typical cycle. Starts at 100% when the unit returns to power post-refuel and drops as full-power-days are burned. Days at reduced power burn fuel proportionally — so a unit with significant downtime (high burn deficit) drops slower and ends up with MORE fuel left than its calendar position would suggest. Coastdown threshold around 15%. Toggle to overlay past cycles on a normalized "days into cycle" axis to see how aggressively this unit historically burns down before refuel.

Fuel Burn Down Cycle since Dec 4, 2025

37.7% remaining 1.5 FPD margin
Palo Verde 3 has an estimated 37.7% of its fuel left. Across its last 17 cycles, it has refueled with an average of 4.5% remaining.
Avg refuel: 4.5% Avg refuel (3yr): 0.4% Deepest burn: 0.0% (2012-04 → 2013-10) Most margin: 18.2% (2004-12 → 2006-04)
?
Monthly capacity factor with outage events overlaid as red bands. Green bars show average power level per month. Toggle to Daily view for raw daily data.

Power History

Over its operating life, Palo Verde 3 has run at about 89.2% of its rated capacity. Across the last 12 reported months it averaged 90.2%. On the chart, green stretches near the top are full-power running, amber marks reduced power (50 to 89%), and red drops toward zero are outages.

Outage History & Daily Power Log

This table logs every recorded outage for Palo Verde 3, 46 in all since 2000. Of those, 18 were scheduled refueling outages and 28 were unplanned or forced. The typical outage lasted about 21 days. Where the Scheduled column shows (Model), the date is a NukeWorker projection because the utility had not published one.
Scheduled 3R25
2025-10-04 2025-12-02 60 510d 2025-09-25 +9d
Scheduled 3R24
2024-04-06 2024-05-12 37 514d 2024-04-05 +1d
Scheduled 3R23
2022-10-08 2022-11-09 33 303d 2022-10-08 0d
Scram # 55626 Auto
2021-12-07 2021-12-09 3 204d - -
Scheduled 3R22
2021-04-10 2021-05-17 38 419d 2021-04-10 0d
Unscheduled
2020-02-09 2020-02-16 8 81d - -
Scheduled 3R21
2019-10-05 2019-11-20 47 462d 2019-09-29 +6d
Scram # 53477 Auto
2018-06-28 2018-06-30 3 55d - -
Scheduled 3R20
2018-04-07 2018-05-04 28 328d 2018-04-07 0d
Unscheduled
2017-05-10 2017-05-14 5 187d - -
Scheduled 3R19
2016-10-08 2016-11-04 28 16d 2016-10-07 +1d
Unscheduled
2016-09-20 2016-09-22 3 506d - -
Scheduled 3R18
2015-04-04 2015-05-03 30 495d 2015-04-04 0d
Scheduled 3R17
2013-10-05 2013-11-25 52 339d 2013-10-05 0d
Unscheduled
2012-10-25 2012-10-31 7 191d - -
Scheduled 3R16
2012-03-17 2012-04-17 32 421d 2012-03-17 0d
Scram # 46556 Auto
2011-01-20 2011-01-21 2 72d - -
Scheduled 3R15
2010-10-02 2010-11-09 39 301d 2010-10-02 0d
Unscheduled
2009-12-04 2009-12-05 2 191d - -
Scheduled 3R14
2009-04-04 2009-05-27 54 187d 2009-04-04 0d
Unscheduled
2008-09-28 2008-09-29 2 9d - -
Unscheduled
2008-09-17 2008-09-19 3 246d - -
Scheduled 3R13SGR/Major
2007-09-29 2008-01-15 109 151d 2007-09-29 0d
Unscheduled
2007-04-13 2007-05-01 19 72d - -
Unscheduled
2007-01-27 2007-01-31 5 99d - -
Unscheduled
2006-10-19 2006-10-20 2 108d - -
Unscheduled
2006-07-02 2006-07-03 2 51d - -
Scheduled 3R12
2006-04-01 2006-05-12 42 26d 2006-03-31 +1d
Unscheduled
2006-03-06 2006-03-06 1 137d - -
Unscheduled
2005-10-12 2005-10-20 9 6d - -
Unscheduled
2005-10-02 2005-10-06 5 82d - -
Unscheduled
2005-07-06 2005-07-12 7 13d - -
Unscheduled
2005-05-23 2005-06-23 32 168d - -
Scheduled 3R11
2004-10-02 2004-12-06 66 105d 2004-10-02 0d
Unscheduled
2004-06-15 2004-06-19 5 6d - -
Unscheduled
2004-06-08 2004-06-09 2 93d - -
Unscheduled
2004-02-29 2004-03-07 8 209d - -
Unscheduled
2003-07-29 2003-08-04 7 39d - -
Unscheduled
2003-06-19 2003-06-20 2 50d - -
Scheduled 3R10
2003-03-29 2003-04-30 33 510d 2003-03-29 0d
Scheduled 3R9
2001-09-29 2001-11-04 37 41d 2001-09-29 0d
Unscheduled
2001-08-18 2001-08-19 2 89d - -
Unscheduled
2001-05-20 2001-05-21 2 81d - -
Unscheduled
2001-02-17 2001-02-28 12 138d - -
Unscheduled
2000-09-28 2000-10-02 5 150d - -
Scheduled 3R8
2000-04-01 2000-05-01 31 - 2000-04-01 0d