Composite Operational Excellence Score (0-100) — average percentile rank across 7 dimensions in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). 5-year window. Higher = more operationally excellent. Click to see the full breakdown.
Excellence
ranked of 93
Subscribers
?
Current reactor power level from the most recent NRC daily report.
0%
Power
OFFLINE (12 Days)
?
Days of continuous operation since the last outage ended. Ranked against all operating units.
--
Current Run
days
#89 of 95
Bottom Quartile
?
Longest recorded period of continuous operation between outages.
715
Record Run
days
#31 of 95
Mid Quartile
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold (621 days for this 24-month cycle unit) with no trips to 0% power.
--
B2B Runs
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power). Ranked against all NRC-tracked units.
63.3%
Capacity Factor
#95 of 95
Bottom Quartile
?
Net electricity actually generated over the most recent 12 months reported by the U.S. Energy Information Administration (Form EIA-923), summed across every unit at this plant. These are authoritative actuals, not an estimate.
30.96 TWh
Net Generation
EIA-923 · 12 mo to 2026-06 · plant total
?
Community rating score (Bayesian-adjusted). Based on 59 votes. Ranked against all rated facilities.
49
Rating
59 votes
#64 of 97
Mid Quartile
?
Total NRC-reported scram events (emergency reactor shutdowns). Ranked fleet-wide — fewer scrams = better rank.
8
Scrams
#57 of 94
Mid Quartile
?
Years since commercial operation began. License remaining: 27.2 years.
52.1
Operating Age
years
27.2 yrs remaining
Reactor Status Timeline
Refueling Outage · Day 12 NRC data, Mon to Fri ? Actual daily reactor status from NRC reports (Mon to Fri) and the current state. What is coming -- the utility's published Scheduled outage and NukeWorker's model Projection -- is part of a subscription. Colored by status. How far ahead you can see depends on your plan.OnlineReduced PowerCoastdownPower AscensionRefueling OutageForced Outage
Operational Excellence Score Subscribers
Browns Ferry 1 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.
- This unit's composite score and fleet rank
- Reliability, Efficiency and Discipline sub-scores
- All seven measured inputs, with fleet percentiles
- Rank against comparable units, not just the fleet
- Three-year, five-year and lifetime windows
- Five-year trend, and every other operating US reactor
Included with every outage subscription and with NukeWorker Gold membership. Trading the outage rather than working it? The same record, cut by power market, is on NukeGryd.
Capacity Factor (365-Day)
0%
Current
94.3%
365-Day Avg
#43
of 94 plants
Min: 0%
Max: 100%
24 days <80%
Scram History 8 events since 2011
Automatic and manual reactor scram (emergency shutdown) events reported to the NRC since 2011. Includes event dates, trip type, and average recovery time. Click the title to view the full fleet scram dashboard.
Browns Ferry 1 has recorded 8 reactor scrams, or emergency shutdowns, since 2011 (6 automatic, 2 manual). On average the unit was back to full power about 12.1 days after each trip.
Outage Duration Trend
?Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.
Browns Ferry 1 has completed 10 scheduled refueling outages on record, averaging 31 days each. The most recent, in Sep 2026, ran 12 days.
Power History (12-Month)
?Daily power output as a percentage of rated capacity over the past 365 days. Green segments indicate full power (90%+), yellow shows reduced output, and red indicates significant power reductions or shutdowns.
Over the past 12 months Browns Ferry 1 has run at an average of 94.3% of rated power. On the chart, green stretches are full-power running and dips toward zero mark reduced output or outages.
Outage Days by Year
?Total days spent in outage each year, split by scheduled refueling (blue) and forced/unplanned (red). Lower totals indicate better reliability and outage execution. Hover for details.
Across its recorded history, Browns Ferry 1 has spent 306 days in scheduled refueling outages and 157 days in forced or unplanned outages. Taller bars mark the years with the most downtime.
Facility Statistics
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Browns Ferry 1 has operated for about 52.1 years and averaged a 63.3% lifetime capacity factor, generating roughly 179.3 TWh of electricity. Its longest unbroken run reached 715 days.
Lifecycle & Tenure
Operating Age: 52.1 Yrs
Build Time: 7.2 Yrs
Lic. Remaining: 27.2 Yrs
Production & Power
Lifetime CF: 63.3%
Efficiency: 31.8%
Generated: 179.3 TWh
Reliability & Outages
Record Run: 715 Days
Refuelings: 10
Avg Startup: 13.9 Days
NukeWorker Member Ratings 59 votes
Community ratings from NukeWorker members. Vote to share your experience working at this facility. Score uses a Bayesian average that accounts for vote count — facilities with few votes are pulled toward the fleet average, so rankings reflect confidence, not just raw percentages.
Above Average
20 (33%)
Average
15 (25%)
Below Average
24 (40%)
Facility Map
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
34.7058, -87.1202
Location & Contact
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Phone:
(265) 729-2000
Website:
http://www.tva.gov/
Per Diem Rates FY 2026
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2026.
$110
Lodging/Night
$68
M&IE/Day
$178
Total/Day
Standard Rate, Al
Unemployment Benefits AL
Maximum state unemployment insurance benefits for AL. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$275
Max Weekly
26
Max Weeks
$7,150
Max Total
7-day waiting period before benefits begin
Photos
Photos of this facility from the NukeWorker photo gallery. Click the header or any photo to browse the full album.
Ownership & Construction
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Publicly Traded
No — Federal corporation with no common equity. Its listed TVC/TVE securities are power bonds, not stock.
Technical Specs
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type:
BWR
Containment:
BWR-MARK 1
NSS Supplier:
GE 4
Thermal Power:
3952 MWt
Net Capacity:
1256 MWe
Efficiency:
31.8%
Status:
Operating
Licensing
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #:
05000259
License #:
DPR-33
License Type:
OL-FP
Const. Permit:
1967-05-10
Operating Lic:
1973-12-20
Commercial Op:
1974-08-01
License Renewed:
2025-12-11
License Exp:
2053-12-20
Market & Region
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region:
SERC
— SERC Reliability Corporation
Census Region:
ESC
— East South Central
Balancing Authority:
TVA
— Tennessee Valley Authority
Market Structure:
Regulated
— Rate-regulated utility (cost-of-service pricing)