Duane Arnold

Decommissioned

NextEra Energy·Palo, IA·BWR·562 MWe

Operational history, outage history & performance charts, scram history, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for Duane Arnold.

Decommissioned

Permanently shut down on 2020-08-10. View Outage History →

Excellence Score, Records & Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Duane Arnold Energy Center.

Duane Arnold Energy Center is a single-unit nuclear plant in Fayette Township, Linn County, Iowa, near Palo, on the west bank of the Cedar River about eight miles northwest of Cedar Rapids.

Read more

The construction permit was granted on June 17, 1970. The plant has a General Electric BWR-4 boiling water reactor with Mark I containment. Iowa Electric Light and Power, with Central Iowa Power Cooperative and Corn Belt Power Cooperative, applied for the license, and Bechtel was the architect-engineer. The reactor first went critical on March 23, 1974, was connected to the grid on May 19, 1974, and entered commercial operation on February 1, 1975. The August 2020 derecho damaged and leveled its cooling towers, and the reactor was permanently shut down on October 12, 2020.

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Duane Arnold has operated for about 45.5 years and averaged a 86.7% lifetime capacity factor, generating roughly 94.8 TWh of electricity. Its longest unbroken run reached 2,039 days.
Lifecycle & Tenure
Operating Age: 45.5 Yrs
Build Time: 4.6 Yrs
Lic. Remaining: N/A Yrs
Production & Power
Lifetime CF: 86.7%
Efficiency: 33.9%
Generated: 94.8 TWh
Reliability & Outages
Record Run: 2,039 Days
Refuelings: 12
Avg Startup: 17 Days

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: NextEra Energy
Architect Engineer: BECH
Constructor: BECH
Ownership, operation and management history
DateChange FromTo
Aug 7, 2000 Operator change Alliant Energy (IES Utilities) (owner, operated it) Nuclear Management Co (operator only)
Jan 27, 2006 Sold Alliant Energy (Interstate Power and Light) NextEra (FPL Energy)
NEE NextEra Energy, Inc. NYSE
$78.51 ▼ -0.35 (-0.44%)
Previous Close 78.86
Day's Range 77.93 – 79.85
52-Week Range 74.41 – 98.75
Volume 11,002,251
Delayed quote as of Oct 21, 2026 3:49 PM ET. Source: Yahoo Finance. Full quote on Yahoo Finance
NextEra Energy and Dominion Energy (D) announced a merger on 2026-05-18, subject to regulatory and shareholder approval.

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: BWR
Containment: BWR-MARK 1
NSS Supplier: GE 4
Turbine Supplier: GENERAL ELECTRIC CO. IAEA
Thermal Power: 1658 MWt
Net Capacity: 562 MWe
Gross Capacity: 624 MWe IAEA
Design Capacity: 538 MWe IAEA
Efficiency: 33.9%
Lifetime Output: 172.7 TWh through 2025 IAEA

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000331
License #: DPR-49
License Type: OL-FP
Const. Permit: 1970-06-22
Construction Start: 1970-06-22 IAEA
Operating Lic: 1974-02-22
First Criticality: 1974-03-23 IAEA
Grid Connection: 1974-05-19 IAEA
Commercial Op: 1975-02-01
License Renewed: 2010-12-16
License Exp: 2014-02-21

Market & Region

?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
Balancing Authority: MISO — Midcontinent Independent System Operator (ISO/RTO)