B2B CHAMPION
871 days without a trip
·
4 Career Runs · 1 since last trip
Champion since Sep 4, 2025
Breaker-to-Breaker Runs
4 runs
?
Breaker-to-breaker runs measure continuous operation between refueling outages using a cycle-adjusted threshold (90% of cycle length minus RFO duration). An active streak means the unit has been running continuously since the last refueling with no trips to 0% power.
Harris 1 has logged 4 breaker-to-breaker runs, continuous stretches from one refueling to the next with no trip to zero power. Its longest ran 527 days, and its runs average 515 days.
527
Best Run (days)
RO16 (2010-11-11) → RO17 (2012-04-21)
★ Double breaker-to-breaker
RO24 → RO25 → RO26
All Runs
| 2024-06-02 |
2025-10-04 |
489 days |
RO25 → RO26 |
| 2022-11-03 |
2024-04-10 |
524 days |
RO24 → RO25 |
| 2018-05-10 |
2019-10-12 |
520 days |
RO21 → RO22 |
| 2010-11-11 |
2012-04-21 |
527 days |
RO16 → RO17 |
About This Site
?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Shearon Harris Nuclear Power Plant; NRC: Shearon Harris Units 1-4 construction permit memo; Global Energy Monitor: Shearon Harris nuclear power plant.
Shearon Harris Nuclear Power Plant stands at New Hill, in Wake County, North Carolina, about 20 miles southwest of Raleigh. It uses Harris Lake for cooling water.
Read more
The NRC issued construction permits for four Westinghouse three-loop pressurized water reactors on January 27, 1978, and construction of Unit 1 began the next day. Units 3 and 4 were cancelled in December 1981, and Unit 2 was abandoned in 1983. Unit 1 was the one reactor completed. It reached criticality and connected to the grid in January 1987, and commercial operation began on May 2, 1987.
Facility Statistics
?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Harris 1 has operated for about 39.5 years and averaged a 91.7% lifetime capacity factor, generating roughly 211.4 TWh of electricity. Its longest unbroken run reached 544 days.
Lifecycle & Tenure
Operating Age: 39.5 Yrs
Build Time: 9.3 Yrs
Lic. Remaining: 20 Yrs
Production & Power
Lifetime CF: 91.7%
Efficiency: 32.7%
Generated: 211.4 TWh
Reliability & Outages
Record Run: 544 Days
Refuelings: 18
Avg Startup: 4.4 Days
Ownership & Construction
?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Ownership, operation and management history
| Date | Change |
From | To |
| Nov 30, 2000 |
Merger |
Carolina Power & Light |
Progress Energy |
| Jul 2, 2012 |
Merger |
Progress Energy |
Duke Energy |
DUK
Duke Energy Corporation
NYSE
$120.67
▼ -0.66 (-0.54%)
Previous Close
121.33
Day's Range
120.62 – 121.70
52-Week Range
112.40 – 134.49
Volume
3,195,549
Operational Excellence Score Subscribers
Harris 1 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.
- This unit's composite score and fleet rank
- Reliability, Efficiency and Discipline sub-scores
- All seven measured inputs, with fleet percentiles
- Rank against comparable units, not just the fleet
- Three-year, five-year and lifetime windows
- Five-year trend, and every other operating US reactor
Scram History
9 events since 2011
?
Automatic and manual reactor scram (emergency shutdown) events reported to the NRC since 2011. Includes event dates, trip type, and average recovery time. Click the title to view the full fleet scram dashboard.
Harris 1 has recorded 9 reactor scrams, or emergency shutdowns, since 2011 (5 automatic, 4 manual). On average the unit was back to full power about 8.4 days after each trip.
Recent Events
| 2024-05-30 |
Auto |
AUTOMATIC REACTOR TRIP The following information was provide... |
|
| 2022-10-30 |
Auto |
AUTOMATIC REACTOR TRIP AND AUXILIARY FEEDWATER SYSTEM ACTUAT... |
|
| 2022-08-28 |
Manual |
MANUAL REACTOR TRIP AND AUXILIARY FEEDWATER SYSTEM ACTUATION... |
|
| 2022-04-29 |
Manual |
MANUAL REACTOR TRIP AND AUXILIARY FEEDWATER SYSTEM ACTUATION... |
|
| 2020-12-16 |
Auto |
AUTOMATIC REACTOR TRIP DUE TO GENERATOR LOCKOUT "On December... |
|
| 2020-08-13 |
Manual |
MANUAL REACTOR TRIP DUE TO DROPPED CONTROL ROD "On August 13... |
|
| 2020-03-23 |
Auto |
AUTOMATIC REACTOR TRIP "On March 23, 2020, at 1013 EDT, with... |
|
| 2016-10-08 |
Auto |
UNPLANNED REACTOR TRIP AND SAFETY INJECTION DUE TO TURBINE C... |
|
+1 more events
Technical Specs
?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Turbine Supplier:
WESTINGHOUSE ELECTRIC CORPORATION IAEA
Thermal Power:
2948 MWt
Net Capacity:
964 MWe
Gross Capacity:
980 MWe IAEA
Design Capacity:
900 MWe IAEA
Efficiency:
32.7%
Lifetime Output:
274.0 TWh through 2025 IAEA
Licensing
?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #:
05000400
License #:
NPF-63
License Type:
OL-FP
Const. Permit:
1978-01-27
Construction Start:
1978-01-28 IAEA
Operating Lic:
1986-10-24
First Criticality:
1987-01-03 IAEA
Grid Connection:
1987-01-19 IAEA
Commercial Op:
1987-05-02
License Renewed:
2008-12-17
License Exp:
2046-10-24
Market & Region
?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region:
SERC
— SERC Reliability Corporation
Census Region:
SAT
— South Atlantic
Balancing Authority:
CPLE
— Duke Energy Progress East (formerly Carolina Power & Light - East)
Market Structure:
Regulated
— Rate-regulated utility (cost-of-service pricing)