Indian Point 2 — Decommissioned Reactor Data & History

Operational history, outage history & performance charts, scram history, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for Indian Point 2.

Decommissioned

Permanently shut down on 2020-04-30. View Outage History →
?
Current reactor power level from the most recent NRC daily report.
Shut Down
?
Days of continuous operation since the last outage ended. Ranked against all operating units.
1,754
Current Run
days
?
Longest recorded period of continuous operation between outages.
1,754
Record Run
days
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold (619 days for this 24-month cycle unit) with no trips to 0% power.
--
B2B Runs
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power). Ranked against all NRC-tracked units.
82.7%
Capacity Factor
?
Community rating score (Bayesian-adjusted). Based on 70 votes. Ranked against all rated facilities.
37.5
Rating
70 votes
#93 of 97
Bottom Quartile
?
Total NRC-reported scram events (emergency reactor shutdowns). Ranked fleet-wide — fewer scrams = better rank.
10
Scrams
?
Years since commercial operation began.
45.7
Operating Age
years

Outage Duration Trend

?
Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.
Indian Point 2 has completed 9 scheduled refueling outages on record, averaging 37 days each. The most recent, in Mar 2018, ran 33 days.

Outage Days by Year

?
Total days spent in outage each year, split by scheduled refueling (blue) and forced/unplanned (red). Lower totals indicate better reliability and outage execution. Hover for details.
Across its recorded history, Indian Point 2 has spent 333 days in scheduled refueling outages and 144 days in forced or unplanned outages. Taller bars mark the years with the most downtime.

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Indian Point 2 has operated for about 45.7 years and averaged a 82.7% lifetime capacity factor, generating roughly 158.9 TWh of electricity. Its longest unbroken run reached 1,754 days.
Lifecycle & Tenure
Operating Age: 45.7 Yrs
Build Time: 7.8 Yrs
Lic. Remaining: N/A Yrs
Production & Power
Lifetime CF: 82.7%
Efficiency: 31.4%
Generated: 158.9 TWh
Reliability & Outages
Record Run: 1,754 Days
Refuelings: 10
Avg Startup: 8.4 Days

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Broadway & Bleakley Ave
Buchanan, NY 10511, USA
Get Directions
Phone: (914) 736-8000

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2026.
$161
Lodging/Night
$92
M&IE/Day
$253
Total/Day
Tarrytown / White Plains / New Rochelle, Westchester County, NY

Unemployment Benefits NY

?
Maximum state unemployment insurance benefits for NY. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$504
Max Weekly
26
Max Weeks
$13,104
Max Total
7-day waiting period before benefits begin

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Holtec International
Architect Engineer: UE&C
Constructor: WDCO

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: PWR
Containment: PWR-DRYA MB
NSS Supplier: WEST 4LP
Thermal Power: 3071 MWt
Net Capacity: 965 MWe
Efficiency: 31.4%

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000247
License #: DPR-26
License Type: OL-FP
Const. Permit: 1966-10-14
Operating Lic: 1973-09-28
Commercial Op: 1974-08-01
License Renewed: 2018-09-17
License Exp: 2013-09-28