Indian Point 3

Decommissioned

Holtec International·Buchanan, NY·PWR·985 MWe

Operational history, outage history & performance charts, scram history, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for Indian Point 3.

Decommissioned

Permanently shut down on 2021-04-30. View Outage History →

Excellence Score, Records & Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Indian Point Energy Center.

Indian Point Energy Center is a three-reactor site at Buchanan, in Westchester County, New York, on the east bank of the Hudson River just south of Peekskill. It lies about 36 miles north of Midtown Manhattan.

Read more

Consolidated Edison began building Unit 1, a Babcock & Wilcox pressurized water reactor, on May 1, 1956. It connected to the grid in September 1962 and was shut down on October 31, 1974, because its emergency core cooling system did not meet requirements. Unit 2 (Westinghouse, construction started October 14, 1966) began operating in 1973 and was shut down in April 2020. Unit 3 (Westinghouse, built by the New York Power Authority, construction started November 1, 1968) began in 1976 and was shut down in April 2021.

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Indian Point 3 has operated for about 44.7 years and averaged a 91% lifetime capacity factor, generating roughly 178.5 TWh of electricity. Its longest unbroken run reached 1,843 days.
Lifecycle & Tenure
Operating Age: 44.7 Yrs
Build Time: 7 Yrs
Lic. Remaining: N/A Yrs
Production & Power
Lifetime CF: 91%
Efficiency: 32.6%
Generated: 178.5 TWh
Reliability & Outages
Record Run: 1,843 Days
Refuelings: 12
Avg Startup: 5.6 Days

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Holtec International
Architect Engineer: UE&C
Constructor: WDCO
Ownership, operation and management history
DateChange FromTo
Nov 2000 Sold New York Power Authority Entergy
May 28, 2021 Sold Entergy Holtec
Publicly Traded No — Privately held

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: PWR
Containment: PWR-DRYAMB
NSS Supplier: WEST 4LP
Turbine Supplier: GENERAL ELECTRIC CO. IAEA
Thermal Power: 3025 MWt
Net Capacity: 985 MWe
Gross Capacity: 1,085 MWe IAEA
Design Capacity: 965 MWe IAEA
Efficiency: 32.6%
Lifetime Output: 281.4 TWh through 2025 IAEA

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000286
License #: DPR-64
License Type: OL-FP
Const. Permit: 1969-08-13
Construction Start: 1968-10-30 IAEA
Operating Lic: 1976-04-05
First Criticality: 1976-04-04 IAEA
Grid Connection: 1976-04-25 IAEA
Commercial Op: 1976-08-30
License Renewed: 2018-09-17
License Exp: 2015-12-15