Operational history, outage history & performance charts, scram history, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for Indian Point 3.
Breaker-to-breaker runs measure continuous operation between refueling outages using a cycle-adjusted threshold (90% of cycle length minus RFO duration). An active streak means the unit has been running continuously since the last refueling with no trips to 0% power.
Indian Point 3 has logged 2 breaker-to-breaker runs, continuous stretches from one refueling to the next with no trip to zero power. Its longest ran 753 days, and its runs average 718 days.
753
Best Run (days)
3R20 (2019-04-09) → 3R21 (2021-05-01)
718
Avg Run (days)
All Runs
2019-04-09
2021-05-01
753 days
3R20 → 3R21
2007-04-28
2009-03-11
683 days
3R14 → 3R15
About This Site
?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Indian Point Energy Center.
Indian Point Energy Center is a three-reactor site at Buchanan, in Westchester County, New York, on the east bank of the Hudson River just south of Peekskill. It lies about 36 miles north of Midtown Manhattan.
Read more
Consolidated Edison began building Unit 1, a Babcock & Wilcox pressurized water reactor, on May 1, 1956. It connected to the grid in September 1962 and was shut down on October 31, 1974, because its emergency core cooling system did not meet requirements. Unit 2 (Westinghouse, construction started October 14, 1966) began operating in 1973 and was shut down in April 2020. Unit 3 (Westinghouse, built by the New York Power Authority, construction started November 1, 1968) began in 1976 and was shut down in April 2021.
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Indian Point 3 has operated for about 44.7 years and averaged a 91% lifetime capacity factor, generating roughly 178.5 TWh of electricity. Its longest unbroken run reached 1,843 days.
Lifecycle & Tenure
Operating Age:44.7 Yrs
Build Time:7 Yrs
Lic. Remaining:N/A Yrs
Production & Power
Lifetime CF:91%
Efficiency:32.6%
Generated:178.5 TWh
Reliability & Outages
Record Run:1,843 Days
Refuelings:12
Avg Startup:5.6 Days
Ownership & Construction
?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Automatic and manual reactor scram (emergency shutdown) events reported to the NRC since 2011. Includes event dates, trip type, and average recovery time. Click the title to view the full fleet scram dashboard.
Indian Point 3 has recorded 10 reactor scrams, or emergency shutdowns, since 2011 (8 automatic, 2 manual). On average the unit was back to full power about 6.9 days after each trip.
10
Total
8
Automatic
2
Manual
6.9
Avg Recovery (days)
Recent Events
2018-09-18
Manual
MANUAL REACTOR TRIP DUE TO A STEAM LEAK ON A HIGH PRESSURE F...
2018-02-16
Auto
AUTOMATIC TRIP DUE TO LOSS OF EXCITATION ON MAIN GENERATOR "...
2017-11-03
Auto
INDIAN POINT UNIT 3 REACTOR TRIP ON LOW STEAM GENERATOR LEVE...
2015-12-14
Auto
AUTOMATIC REACTOR TRIP DUE TO MAIN GENERATOR LOCKOUT "At 190...
2015-07-08
Manual
MANUAL REACTOR TRIP DUE TO LOWERING STEAM GENERATOR WATER LE...
2015-06-15
Auto
REACTOR TRIP DUE TO TURBINE TRIP "On June 15, 2015 at 1920 E...
2015-05-09
Auto
UNUSUAL EVENT DECLARED DUE TO MAIN TRANSFORMER FIRE "At 1750...
2014-08-13
Auto
AUTOMATIC REACTOR TRIP "On August 13, 2014 at 1157 EDT, the ...
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.