Breaker-to-Breaker Runs
5 runs
?
Breaker-to-breaker runs measure continuous operation between refueling outages using a cycle-adjusted threshold (90% of cycle length minus RFO duration). An active streak means the unit has been running continuously since the last refueling with no trips to 0% power.
LaSalle 2 has logged 5 breaker-to-breaker runs, continuous stretches from one refueling to the next with no trip to zero power. Its longest ran 715 days, and its runs average 702 days.
715
Best Run (days)
L2R17 (2019-03-10) → L2R18 (2021-02-22)
★ Double breaker-to-breaker
L2R10 → L2R11 → L2R12
All Runs
| 2023-03-09 |
2025-02-10 |
704 days |
L2R19 → L2R20 |
| 2019-03-10 |
2021-02-22 |
715 days |
L2R17 → L2R18 |
| 2011-03-07 |
2013-02-11 |
707 days |
L2R13 → L2R14 |
| 2007-03-17 |
2009-01-19 |
674 days |
L2R11 → L2R12 |
| 2005-03-17 |
2007-02-26 |
711 days |
L2R10 → L2R11 |
About This Site
?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: LaSalle County Nuclear Generating Station.
LaSalle County Generating Station has two units in Brookfield Township, LaSalle County, Illinois, near Marseilles and about 11 miles southeast of Ottawa. A 2,058-acre man-made cooling lake serves the plant in place of cooling towers.
Read more
Construction began on September 10, 1973. Both units use General Electric BWR-5 boiling water reactors with Mark 2 containments. Unit 1 connected to the grid on September 4, 1982, and began commercial operation on October 20, 1982. Unit 2 connected on April 20, 1984, and began commercial operation on October 19, 1984.
Facility Statistics
?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
LaSalle 2 has operated for about 42 years and averaged a 92.8% lifetime capacity factor, generating roughly 257.4 TWh of electricity. Its longest unbroken run reached 736 days.
Lifecycle & Tenure
Operating Age: 42 Yrs
Build Time: 11.1 Yrs
Lic. Remaining: 17.1 Yrs
Production & Power
Lifetime CF: 92.8%
Efficiency: 32%
Generated: 257.4 TWh
Reliability & Outages
Record Run: 736 Days
Refuelings: 15
Avg Startup: 5.4 Days
Ownership & Construction
?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Ownership, operation and management history
| Date | Change |
From | To |
| Oct 20, 2000 |
Merger |
Commonwealth Edison (Unicom) |
Exelon |
| Feb 1, 2022 |
Spin-off |
Exelon |
Constellation Energy |
CEG
Constellation Energy Corporation
NasdaqGS
$253.45
▼ -1.76 (-0.69%)
Previous Close
255.21
Day's Range
247.25 – 256.79
52-Week Range
228.63 – 406.04
Volume
2,888,283
Operational Excellence Score Subscribers
LaSalle 2 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.
- This unit's composite score and fleet rank
- Reliability, Efficiency and Discipline sub-scores
- All seven measured inputs, with fleet percentiles
- Rank against comparable units, not just the fleet
- Three-year, five-year and lifetime windows
- Five-year trend, and every other operating US reactor
Scram History
6 events since 2011
?
Automatic and manual reactor scram (emergency shutdown) events reported to the NRC since 2011. Includes event dates, trip type, and average recovery time. Click the title to view the full fleet scram dashboard.
LaSalle 2 has recorded 6 reactor scrams, or emergency shutdowns, since 2011 (2 automatic, 4 manual). On average the unit was back to full power about 9.7 days after each trip.
Recent Events
| 2022-09-26 |
Manual |
MANUAL REACTOR TRIP DUE TO REPORTED FIRE ON ISOPHASE BUS DUC... |
|
| 2018-08-31 |
Manual |
MANUAL REACTOR SCRAM DUE TO MAIN CONDENSER DEGRADATION"This ... |
|
| 2017-01-23 |
Manual |
MANUAL REACTOR SCRAM DUE TO STATOR WATER COOLING RUNBACK SIG... |
|
| 2014-08-05 |
Auto |
AUTOMATIC REACTOR SCRAM "This notification is being provided... |
|
| 2013-04-25 |
Manual |
MANUAL REACTOR SCRAM FOLLOWING TRIP OF CIRC WATER PUMPS "Thi... |
|
| 2013-04-17 |
Auto |
NOTIFICATION OF UNUSUAL EVENT DECLARED DUE TO LOSS OF OFFSIT... |
|
Technical Specs
?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Turbine Supplier:
GENERAL ELECTRIC CO. IAEA
Thermal Power:
3546 MWt
Net Capacity:
1134 MWe
Gross Capacity:
1,207 MWe IAEA
Design Capacity:
1,078 MWe IAEA
Efficiency:
32%
Lifetime Output:
316.2 TWh through 2025 IAEA
Licensing
?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #:
05000374
License #:
NPF-18
License Type:
OL-FP
Const. Permit:
1973-09-10
Construction Start:
1973-09-10 IAEA
Operating Lic:
1983-12-16
First Criticality:
1984-03-10 IAEA
Grid Connection:
1984-04-20 IAEA
Commercial Op:
1984-10-19
License Renewed:
2016-10-19
License Exp:
2043-12-16
Market & Region
?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region:
RFC
— Reliability First Corporation
Census Region:
ENC
— East North Central
Balancing Authority:
PJM
— PJM Interconnection (ISO/RTO)
Market Structure:
Merchant
— Competitive generator selling into wholesale markets