Oconee 3 — Nuclear Reactor Data & Live Status

Live reactor status, daily power data, outage history & performance charts, scram history, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for Oconee 3.

?
Composite Operational Excellence Score (0-100) — average percentile rank across 7 dimensions in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). 5-year window. Higher = more operationally excellent. Click to see the full breakdown.
81
Excellence
#9 of 93
Top Quartile
?
Current reactor power level from the most recent NRC daily report.
100%
Power
ONLINE
?
Days of continuous operation since the last outage ended. Ranked against all operating units.
52
Current Run
days
#88 of 95
Bottom Quartile
?
Longest recorded period of continuous operation between outages.
728
Record Run
days
#20 of 95
Top Quartile
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold (619 days for this 24-month cycle unit) with no trips to 0% power.
3
B2B Runs
#70 of 86
Bottom Quartile
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power). Ranked against all NRC-tracked units.
92.3%
Capacity Factor
#21 of 95
Top Quartile
?
Net electricity actually generated over the most recent 12 months reported by the U.S. Energy Information Administration (Form EIA-923), summed across every unit at this plant. These are authoritative actuals, not an estimate.
22.48 TWh
Net Generation
EIA-923 · 12 mo to 2026-04 · plant total
?
Community rating score (Bayesian-adjusted). Based on 1 vote. Ranked against all rated facilities.
52.3
Rating
1 vote
#51 of 97
Mid Quartile
?
Total NRC-reported scram events (emergency reactor shutdowns). Ranked fleet-wide — fewer scrams = better rank.
4
Scrams
#20 of 94
Top Quartile
?
Years since commercial operation began. License remaining: 28 years.
51.6
Operating Age
years
28 yrs remaining

Reactor Status Timeline

Online NRC data, Mon to Fri ? Actual daily reactor status from NRC reports (Mon to Fri), the current state, and what is coming: the utility's published Scheduled outage plus, for subscribers, NukeWorker's model Projection. Colored by status. How far ahead you can see depends on your plan.
Aug2025SepOctNovDecJan2026FebMarAprMayJunJulAugOnline: Jul 19, 2025 to Jul 21, 2025Reduced Power: Jul 22, 2025 to Jul 23, 2025Online: Jul 24, 2025 to May 5, 2026Refueling Outage: May 6, 2026 to May 28, 2026Power Ascension: May 29, 2026 to May 30, 2026Online: May 31, 2026 to Jul 19, 2026Today
OnlineReduced PowerPower AscensionRefueling Outage
Full history & analysis →
?
Composite Operational Excellence Score for Oconee 3 — average percentile rank across 7 publicly observable metrics in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). Toggle the time window (3yr / 5yr / Lifetime) to see how this unit's standing shifts. Each dimension percentile-ranked across the active US fleet. Sub-score = average of components. Composite = average of the three sub-scores.

NukeWorker's Operational Excellence Score 5-yr composite · ranks 9 of 93

NukeWorker scores Oconee 3's operational excellence at 81 out of 100 over the past five years, ranking it 9 of 93 reactors in the active US fleet. The score blends reliability, efficiency, and operating discipline drawn from public performance data.
Time window
NukeWorker's
Operational
Excellence Score
81/100
Top Quartile · #9/93
5-year window

Oconee 3 ranks #9 of 93 active US units on NukeWorker's Operational Excellence Score over the 5-year window. Strongest area: Scrams (5-year) (90th percentile). Weakest: Forced Outage Days/yr (42th percentile).

Reliability
69
Capacity factor + Forced outages + B2B streaks
Efficiency
83
Fuel utilization + Refuel duration
Discipline
90
Startup duration + Scram count
Cohort Rankings apples-to-apples comparison within each peer group
Reactor type: #6 of 61 PWR
Containment: #6 of 47 Dry Ambient (PWR)
Cycle length: #6 of 40 24-month cycle
Fleet rank above (9 of 93) compares all active US units; cohort ranks compare only against units sharing this property.
Per-dimension breakdown (7 metrics)
Capacity Factor 79th
94.6% (higher better, Reliability)
Forced Outage Days/yr 42th
4.0d (lower better, Reliability)
B2B Avg Streak 87th
702d (higher better, Reliability)
Refuel Duration 83th
22d (lower better, Efficiency)
Scrams (5-year) 90th
0.0/yr (lower better, Discipline)

Each dimension's percentile is computed across the active US fleet (93 units with sufficient history). Sub-score = average of its component percentiles. Composite = average of the three sub-scores. 5-year window. View full leaderboard →

Methodology

NukeWorker's Operational Excellence Score is a composite ranking that combines 7 publicly observable performance metrics into a single 0-100 number per US nuclear unit.

How it's computed: Each unit's raw value is converted to a percentile (0-100) within the 93 active US units that have at least 2 completed refueling cycles. The 7 percentiles are averaged into 3 sub-scores (Reliability, Efficiency, Discipline), and those are averaged into the final composite.

Active window — 5-year:

  • Reliability — Capacity factor (5yr), forced outage days/yr (5yr), B2B avg streak (lifetime)
  • Efficiency — in-cycle fuel utilization (3yr), median refuel duration (5yr)
  • Discipline — robust mean startup duration, scrams/yr (5yr, annualised)

Cohort rankings: alongside the fleet rank, each unit gets ranked within its reactor type (PWR/BWR), containment design (Ice Condenser, Mark I, etc.), and cycle length (12/18/24-month). Useful for apples-to-apples comparisons.

What's excluded: subjective community ratings, confidential INPO ratings, financial metrics. We only use publicly available NRC + cycle data.

Why three windows? 5yr (default) is the industry standard. 3yr captures recent operational changes and post-pandemic recovery. Lifetime gives newer units a fair comparison and reveals long-term consistency.

Edge cases: units with fewer than 2 cycles (e.g., Vogtle 4) show "Provisional". Decommissioned units excluded.

Refresh cadence: recomputed daily. Each window cached separately.

A data-derived proxy for operational performance; not affiliated with INPO. INPO ratings are confidential and qualitative — ours is public and quantitative.

5-yr trend: 2021: 66/100 (#26/93)2022: 78/100 (#13/92)2023: 77/100 (#13/92)2024: 76/100 (#14/93)2025: 83/100 (#10/93)2026: 81/100 (#10/93) Stable vs 2025
Compare Oconee 3 head-to-head with up to 3 other units. Compare now

Capacity Factor (365-Day)

?
100%
Current
93.2%
365-Day Avg
#25
of 94 plants
Min: 0% Max: 100% 27 days <80%
B2B CHAMPION
760 days without a trip  ·  3 Career Runs  · 1 since last trip
Champion since Feb 28, 2026

Outage Duration Trend

?
Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.
Oconee 3 has completed 16 scheduled refueling outages on record, averaging 36 days each. The most recent, in May 2026, ran 23 days.

Power History (12-Month)

?
Daily power output as a percentage of rated capacity over the past 365 days. Green segments indicate full power (90%+), yellow shows reduced output, and red indicates significant power reductions or shutdowns.
Over the past 12 months Oconee 3 has run at an average of 93.2% of rated power. On the chart, green stretches are full-power running and dips toward zero mark reduced output or outages.

Outage Days by Year

?
Total days spent in outage each year, split by scheduled refueling (blue) and forced/unplanned (red). Lower totals indicate better reliability and outage execution. Hover for details.
Across its recorded history, Oconee 3 has spent 577 days in scheduled refueling outages and 120 days in forced or unplanned outages. Taller bars mark the years with the most downtime.

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Oconee 3 has operated for about 51.6 years and averaged a 92.3% lifetime capacity factor, generating roughly 192.2 TWh of electricity. Its longest unbroken run reached 728 days.
Lifecycle & Tenure
Operating Age: 51.6 Yrs
Build Time: 7.1 Yrs
Lic. Remaining: 28 Yrs
Production & Power
Lifetime CF: 92.3%
Efficiency: 33.4%
Generated: 192.2 TWh
Reliability & Outages
Record Run: 728 Days
Refuelings: 16
Avg Startup: 4.9 Days

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
155 East Pickens Highway
Seneca, SC 29672, USA
Get Directions
Phone: (864) 885-3000

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2026.
$110
Lodging/Night
$68
M&IE/Day
$178
Total/Day
Standard Rate, SC

Unemployment Benefits SC

?
Maximum state unemployment insurance benefits for SC. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$326
Max Weekly
20
Max Weeks
$6,520
Max Total
7-day waiting period before benefits begin

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Duke Energy
Architect Engineer: DBDB
Constructor: DUKE

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: PWR
Containment: PWR-DRYAMB
NSS Supplier: B&W LLP
Thermal Power: 2610 MWt
Net Capacity: 873 MWe
Efficiency: 33.4%
Status: Operating

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000287
License #: DPR-55
License Type: OL-FP
Const. Permit: 1967-11-06
Operating Lic: 1974-07-19
Commercial Op: 1974-12-16
License Renewed: 2025-03-31
License Exp: 2054-07-19

Market & Region

?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region: SERC — SERC Reliability Corporation
Census Region: SAT — South Atlantic
Balancing Authority: DUK — Duke Energy Carolinas
Market Structure: Regulated — Rate-regulated utility (cost-of-service pricing)