Oyster Creek

Decommissioned

Holtec International·Forked River, NJ·BWR·619 MWe

Operational history, outage history & performance charts, scram history, capacity factor & statistics, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for Oyster Creek.

Decommissioned

Permanently shut down on 2018-09-17. View Outage History →

Excellence Score, Records & Plant Facts

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Oyster Creek has operated for about 48.8 years and averaged a 88.7% lifetime capacity factor, generating roughly 97.1 TWh of electricity. Its longest unbroken run reached 2,767 days.
Lifecycle & Tenure
Operating Age: 48.8 Yrs
Build Time: 5 Yrs
Lic. Remaining: N/A Yrs
Production & Power
Lifetime CF: 88.7%
Efficiency: 32.1%
Generated: 97.1 TWh
Reliability & Outages
Record Run: 2,767 Days
Refuelings: 10
Avg Startup: 6.3 Days

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Holtec International
Architect Engineer: B&R
Constructor: B&R
Ownership, operation and management history
DateChange FromTo
Aug 8, 2000 Sold GPU AmerGen (PECO Energy / British Energy)
Dec 22, 2003 Ownership stake AmerGen (Exelon / British Energy) AmerGen (wholly owned by Exelon)
Jan 2009 Merger AmerGen Exelon
Jul 1, 2019 Sold Exelon Holtec
Publicly Traded No — Privately held

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: BWR
Containment: BWR-MARK 1
NSS Supplier: GE 2
Turbine Supplier: GENERAL ELECTRIC CO. IAEA
Thermal Power: 1930 MWt
Net Capacity: 619 MWe
Gross Capacity: 652 MWe IAEA
Design Capacity: 650 MWe IAEA
Efficiency: 32.1%
Lifetime Output: 196.2 TWh through 2025 IAEA

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000219
License #: DPR-16
License Type: OL-FP
Const. Permit: 1964-12-15
Construction Start: 1964-12-15 IAEA
Operating Lic: 1991-07-02
First Criticality: 1969-05-03 IAEA
Grid Connection: 1969-09-23 IAEA
Commercial Op: 1969-12-01
License Renewed: 2009-04-08
License Exp: 2009-12-15