Oyster Creek

Decommissioned

Holtec International·Forked River, NJ·BWR·619 MWe

Decommissioned

Permanently shut down on 2018-09-17. Outage statistics below reflect only the operating period. The final shutdown is not counted as an outage.

Outage Record

Outage Days by Year

?
Total days spent in outage each year, split by scheduled refueling (blue) and forced/unplanned (red). Lower totals indicate better reliability and outage execution. Hover for details.
Across its recorded history, Oyster Creek has spent 251 days in scheduled refueling outages and 185 days in forced or unplanned outages. Taller bars mark the years with the most downtime.
?
Duration of each outage in days, shown chronologically. Green bars are scheduled refueling outages, red bars are forced/unscheduled. The orange dashed line marks the average duration. Extended outages (>180 days) and D&D periods are excluded.

Outage Duration Trend

Oyster Creek has 50 outages plotted here, averaging 9 days each. The most recent, in Jul 2017, was a unplanned outage lasting 2 days.
?
Scheduled refueling outage durations over time. Green bars are at or below this unit's average, amber up to 30% above it, red beyond that. The dashed line is the average. Shorter outages mean better execution.

Refueling Duration Trend

Oyster Creek has completed 9 scheduled refueling outages on record, averaging 28 days each. The most recent, in Sep 2016, ran 23 days.
?
Time in days from first power generation (>0%) to sustained full power (≥95% for 2+ consecutive days) after each scheduled refueling outage. The dashed line marks the average. Includes startup testing holds and power dips.

Startup Duration Trend

After a refueling outage, Oyster Creek takes about 4 days to climb from first power back to full power. That average is drawn from 9 startups on record, and the most recent took 3 days.
?
Daily reactor power over the 120 days before each scheduled refueling outage, one line per refueling, lined up on the day the outage began. A coastdown is the slow decline as the fuel runs out near the end of a cycle. The highlighted line is the most recent refueling and fainter lines are older. Counts and medians cover coastdowns of a week or longer. A shutdown straight from full power, with no decline ahead of it, is what a forced outage looks like.

Coastdown Before Refueling

3 of 9 refuelings 23 days median 90% power at shutdown 0.3% per day
Oyster Creek coasted down for a week or longer before 3 of its 9 refuelings on record. Those coastdowns ran a median of 23 days and ended near 90% power. The most recent refueling, in Sep 2016, followed a 7-day coastdown from 97% to 95%.
?
Monthly capacity factor with outage events overlaid as red bands. Green bars show average power level per month. Toggle to Daily view for raw daily data.

Power History

Over its operating life, Oyster Creek has run at about 88.7% of its rated capacity. Across the last 12 reported months it averaged 41.5%. On the chart, green stretches near the top are full-power running, amber marks reduced power (50 to 89%), and red drops toward zero are outages.

Outage History & Daily Power Log

This table logs every recorded outage for Oyster Creek, 51 in all since 2000. Of those, 10 were scheduled refueling outages, 3 were planned maintenance and 38 were unplanned or forced. The typical outage lasted about 12 days. Where the Scheduled column shows (Model), the date is a NukeWorker projection because the utility had not published one.
Scheduled 1R27SGR/Major
2018-09-18 Decommissioned 1 (D&D) 440d 2018-09-17 +1d
Scram # 52839 Manual
2017-07-04 2017-07-05 2 198d - -
Unscheduled
2016-12-14 2016-12-18 5 21d - -
Scram # 52381 Auto
2016-11-20 2016-11-23 4 40d - -
Scheduled 1R26
2016-09-19 2016-10-11 23 131d 2016-09-19 0d
Unscheduled
2016-04-25 2016-05-11 17 349d - -
Scram # 51055 Auto
2015-05-08 2015-05-12 5 43d - -
Scram # 50916 Auto
2015-03-23 2015-03-26 4 161d - -
Scheduled 1R25
2014-09-15 2014-10-13 29 63d 2014-09-15 0d
Scram # 50270 Manual
2014-07-11 2014-07-14 4 2d - -
Scram # 50270 Manual
2014-07-09 2014-07-09 1 204d - -
Scram # 49633 Manual
2013-12-14 2013-12-17 4 23d - -
Planned Mid-Cycle Planned
2013-11-18 2013-11-21 4 42d - -
Scram # 49414 Manual
2013-10-07 2013-10-07 1 3d - -
Scram # 49414 Manual
2013-10-04 2013-10-04 1 2d - -
Scram # 49404 Auto
2013-10-01 2013-10-02 2 306d - -
Scheduled 1R24
2012-10-22 2012-11-29 39 87d 2012-10-22 0d
Scram # 48125 Auto
2012-07-23 2012-07-27 5 330d - -
Unscheduled
2011-08-28 2011-08-28 1 114d - -
Unscheduled
2011-05-01 2011-05-06 6 128d - -
Unscheduled
2010-12-24 2010-12-24 1 2d - -
Unscheduled
2010-12-21 2010-12-22 2 21d - -
Scheduled 1R23
2010-11-01 2010-11-30 30 184d 2010-11-01 0d
Unscheduled
2010-04-29 2010-05-01 3 287d - -
Unscheduled
2009-07-12 2009-07-16 5 71d - -
Unscheduled
2009-04-26 2009-05-02 7 82d - -
Unscheduled
2009-02-02 2009-02-03 2 59d - -
Unscheduled
2008-11-29 2008-12-05 7 11d - -
Scheduled 1R22
2008-10-25 2008-11-18 25 180d 2008-10-24 +1d
Unscheduled
2008-04-26 2008-04-28 3 128d - -
Unscheduled
2007-12-20 2007-12-20 1 152d - -
Unscheduled
2007-07-18 2007-07-21 4 75d - -
Planned Mid-Cycle Planned
2007-04-29 2007-05-04 6 168d - -
Scheduled 1R21
2006-10-16 2006-11-12 28 158d 2006-10-15 +1d
Unscheduled
2006-05-06 2006-05-11 6 90d - -
Planned Mid-Cycle Planned
2006-01-29 2006-02-05 8 240d - -
Unscheduled
2005-06-02 2005-06-03 2 192d - -
Scheduled 1R20
2004-11-03 2004-11-22 20 43d 2004-11-02 +1d
Unscheduled
2004-09-15 2004-09-21 7 106d - -
Unscheduled
2004-05-27 2004-06-01 6 277d - -
Unscheduled
2003-08-22 2003-08-24 3 7d - -
Unscheduled
2003-08-15 2003-08-15 1 81d - -
Unscheduled
2003-05-21 2003-05-26 6 207d - -
Scheduled 1R19
2002-10-05 2002-10-26 22 321d 2002-10-05 0d
Unscheduled
2001-11-12 2001-11-18 7 179d - -
Unscheduled
2001-05-15 2001-05-17 3 179d - -
Scheduled 1R18
2000-10-14 2000-11-17 35 56d 2000-10-14 0d
Unscheduled
2000-08-16 2000-08-19 4 153d - -
Unscheduled
2000-03-06 2000-03-16 11 2d - -
Unscheduled
2000-03-02 2000-03-04 3 30d - -
Unscheduled
2000-01-22 2000-02-01 11 - - -
Page created in 0.102 seconds with 11 queries.