Palo Verde 1

Refueling Outage · Day 12

Arizona Public Service·Tonopah, AZ·PWR·1,311 MWe

Live reactor status, daily power data, outage history & performance charts, scram history, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for Palo Verde 1.

?
Composite Operational Excellence Score (0-100) — average percentile rank across 7 dimensions in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). 5-year window. Higher = more operationally excellent. Click to see the full breakdown.
   
Excellence
Rank locked · 93 units
Subscribers
?
Current reactor power level from the most recent NRC daily report.
0%
Power
OFFLINE (12 Days)
?
Days of continuous operation since the last outage ended. Ranked against all operating units.
--
Current Run
offline
?
Longest recorded period of continuous operation between outages.
531
Record Run
days
#83 of 95
Bottom Quartile
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold (452 days for this 18-month cycle unit) with no trips to 0% power.
10
B2B Runs
#11 of 85
Top Quartile
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power). Ranked against all NRC-tracked units.
88.1%
Capacity Factor
#73 of 95
Bottom Quartile
?
Net electricity actually generated over the most recent 12 months reported by the U.S. Energy Information Administration (Form EIA-923), summed across every unit at this plant. These are authoritative actuals, not an estimate.
31.17 TWh
Net Generation
EIA-923 · 12 mo to 2026-07 · plant total
?
Total NRC-reported scram events (emergency reactor shutdowns). Ranked fleet-wide — fewer scrams = better rank.
5
Scrams
#23 of 94
Top Quartile
?
Years since commercial operation began. License remaining: 18.6 years.
40.7
Operating Age
years
18.6 yrs remaining

Excellence Score, Records & Plant Facts

B2B CHAMPION
1,281 days without a trip  ·  10 Career Runs  · 2 since last trip
Champion since Feb 6, 2025

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Palo Verde 1 has operated for about 40.7 years and averaged a 88.1% lifetime capacity factor, generating roughly 281.2 TWh of electricity. Its longest unbroken run reached 531 days.
Lifecycle & Tenure
Operating Age: 40.7 Yrs
Build Time: 9.7 Yrs
Lic. Remaining: 18.6 Yrs
Production & Power
Lifetime CF: 88.1%
Efficiency: 32.9%
Generated: 281.2 TWh
Reliability & Outages
Record Run: 531 Days
Refuelings: 19
Avg Startup: 4.6 Days

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Arizona Public Service
Architect Engineer: BECH
Constructor: BECH
Ownership, operation and management history
No change of owner, operator or management company on record. Our history starts in 1999.
PNW Pinnacle West Capital Corporation NYSE
$100.72 ▼ -0.86 (-0.85%)
Previous Close 101.58
Day's Range 100.72 – 101.77
52-Week Range 86.18 – 111.16
Volume 82,638
Delayed quote as of Oct 14, 2026 10:26 AM ET. Source: Yahoo Finance. Full quote on Yahoo Finance

Operational Excellence Score Subscribers

Palo Verde 1 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.

  • This unit's composite score and fleet rank
  • Reliability, Efficiency and Discipline sub-scores
  • All seven measured inputs, with fleet percentiles
  • Rank against comparable units, not just the fleet
  • Three-year, five-year and lifetime windows
  • Five-year trend, and every other operating US reactor

Included with every outage subscription and with NukeWorker Gold membership. Trading the outage rather than working it? The same record, cut by power market, is on NukeGryd.

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: PWR
Containment: PWR-DRYAMB
NSS Supplier: COMB CE80
Turbine Supplier: GENERAL ELECTRIC CO. IAEA
Thermal Power: 3990 MWt
Net Capacity: 1311 MWe
Gross Capacity: 1,414 MWe IAEA
Design Capacity: 1,221 MWe IAEA
Efficiency: 32.9%
Status: Operating
Lifetime Output: 355.0 TWh through 2025 IAEA

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000528
License #: NPF-41
License Type: OL-FP
Const. Permit: 1976-05-25
Construction Start: 1976-05-25 IAEA
Operating Lic: 1985-06-01
First Criticality: 1985-05-25 IAEA
Grid Connection: 1985-06-10 IAEA
Commercial Op: 1986-01-28
License Renewed: 2011-04-22
License Exp: 2045-06-01

Market & Region

?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region: WECC — Western Electricity Coordinating Council
Census Region: MTN — Mountain
Balancing Authority: SRP — Salt River Project
Market Structure: Regulated — Rate-regulated utility (cost-of-service pricing)