B2B CHAMPION
1,240 days without a trip
·
5 Career Runs · 2 since last trip
Champion since Aug 23, 2024
Breaker-to-Breaker Runs
5 runs
?
Breaker-to-breaker runs measure continuous operation between refueling outages using a cycle-adjusted threshold (90% of cycle length minus RFO duration). An active streak means the unit has been running continuously since the last refueling with no trips to 0% power.
Palo Verde 2 has logged 5 breaker-to-breaker runs, continuous stretches from one refueling to the next with no trip to zero power. Its longest ran 519 days, and its runs average 499 days.
519
Best Run (days)
2R16 (2011-05-06) → 2R17 (2012-10-06)
★ Double breaker-to-breaker
2R15 → 2R16 → 2R17
All Runs
| 2024-11-12 |
2026-03-20 |
493 days |
2R25 → 2R26 |
| 2023-06-04 |
2024-10-05 |
489 days |
2R24 → 2R25 |
| 2015-11-15 |
2017-04-08 |
510 days |
2R19 → 2R20 |
| 2011-05-06 |
2012-10-06 |
519 days |
2R16 → 2R17 |
| 2009-12-02 |
2011-04-02 |
486 days |
2R15 → 2R16 |
About This Site
?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Palo Verde Nuclear Generating Station.
Palo Verde Nuclear Generating Station is near Tonopah, Arizona, in the northeastern Sonoran Desert, about 45 miles west of downtown Phoenix. Its wet cooling towers use treated sewage water from nearby cities and towns.
Read more
Construction of Unit 1 began on May 25, 1976, and Units 2 and 3 on June 1, 1976. All three units are Combustion Engineering System 80 pressurized water reactors. They connected to the grid in June 1985, May 1986 and November 1987, and entered commercial operation on January 28, 1986, September 19, 1986 and January 8, 1988. Construction permits were sought in the late 1970s for two further units, but those were cancelled for economic reasons before the permits were issued.
Facility Statistics
?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Palo Verde 2 has operated for about 40.1 years and averaged a 89.1% lifetime capacity factor, generating roughly 285.2 TWh of electricity. Its longest unbroken run reached 532 days.
Lifecycle & Tenure
Operating Age: 40.1 Yrs
Build Time: 10.3 Yrs
Lic. Remaining: 19.5 Yrs
Production & Power
Lifetime CF: 89.1%
Efficiency: 32.9%
Generated: 285.2 TWh
Reliability & Outages
Record Run: 532 Days
Refuelings: 19
Avg Startup: 5.6 Days
Ownership & Construction
?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Ownership, operation and management history
No change of owner, operator or management company on record. Our history starts in 1999.
PNW
Pinnacle West Capital Corporation
NYSE
$105.88
▼ -0.73 (-0.68%)
Previous Close
106.61
Day's Range
105.62 – 106.56
52-Week Range
86.18 – 111.16
Volume
1,665,117
Operational Excellence Score Subscribers
Palo Verde 2 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.
- This unit's composite score and fleet rank
- Reliability, Efficiency and Discipline sub-scores
- All seven measured inputs, with fleet percentiles
- Rank against comparable units, not just the fleet
- Three-year, five-year and lifetime windows
- Five-year trend, and every other operating US reactor
Scram History
8 events since 2011
?
Automatic and manual reactor scram (emergency shutdown) events reported to the NRC since 2011. Includes event dates, trip type, and average recovery time. Click the title to view the full fleet scram dashboard.
Palo Verde 2 has recorded 8 reactor scrams, or emergency shutdowns, since 2011 (7 automatic, 1 manual). On average the unit was back to full power about 13.4 days after each trip.
Recent Events
| 2026-03-19 |
Manual |
UNUSUAL EVENT DECLARED FOR RCS LEAKAGE FOR GREATER THAN 15 M... |
|
| 2023-06-02 |
Auto |
AUTOMATIC REACTOR TRIP The following information was provide... |
|
| 2021-05-19 |
Auto |
EN Revision Imported Date: 8/2/2021 EN Revision Text: AUTOMA... |
|
| 2021-02-26 |
Auto |
EN Revision Imported Date: 3/1/2021 EN Revision Text: REACTO... |
|
| 2020-03-03 |
Auto |
REACTOR TRIP DUE TO LOW STEAM GENERATOR LEVEL "At 2050 MST o... |
|
| 2019-08-16 |
Auto |
AUTOMATIC REACTOR TRIP DUE TO TURBINE TRIP "At 0821 MST, on ... |
|
| 2018-05-23 |
Auto |
AUTOMATIC REACTOR TRIP ON LOW DEPARTURE FROM NUCLEATE BOILIN... |
|
| 2013-12-02 |
Auto |
AUTOMATIC REACTOR TRIP FOLLOWING THE LOSS OF THE 1A REACTOR ... |
|
Technical Specs
?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Turbine Supplier:
GENERAL ELECTRIC CO. IAEA
Thermal Power:
3990 MWt
Net Capacity:
1314 MWe
Gross Capacity:
1,414 MWe IAEA
Design Capacity:
1,304 MWe IAEA
Efficiency:
32.9%
Lifetime Output:
375.4 TWh through 2025 IAEA
Licensing
?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #:
05000529
License #:
NPF-51
License Type:
OL-FP
Const. Permit:
1976-05-25
Construction Start:
1976-06-01 IAEA
Operating Lic:
1986-04-24
First Criticality:
1986-04-18 IAEA
Grid Connection:
1986-05-20 IAEA
Commercial Op:
1986-09-19
License Renewed:
2011-04-22
License Exp:
2046-04-24
Market & Region
?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region:
WECC
— Western Electricity Coordinating Council
Census Region:
MTN
— Mountain
Balancing Authority:
SRP
— Salt River Project
Market Structure:
Regulated
— Rate-regulated utility (cost-of-service pricing)