Perry Nuclear Power Plant is at North Perry, in Lake County, Ohio, on the shore of Lake Erie about 40 miles northeast of Cleveland.
Read more
Construction began on October 1, 1974. The plant was built around a General Electric BWR-6 boiling water reactor with a Mark III containment. The reactor first went critical in June 1986, connected to the grid on December 19, 1986, and entered commercial operation on November 18, 1987. A second unit was suspended in 1985 and formally cancelled in 1994, when its major buildings and 500-foot cooling tower were already complete.
Facility Statistics
?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Perry 1 has operated for about 38.9 years and averaged a 87.3% lifetime capacity factor, generating roughly 266.4 TWh of electricity. Its longest unbroken run reached 745 days.
Lifecycle & Tenure
Operating Age: 38.9 Yrs
Build Time: 10.5 Yrs
Lic. Remaining: 20 Yrs
Production & Power
Lifetime CF: 87.3%
Efficiency: 33%
Generated: 266.4 TWh
Reliability & Outages
Record Run: 745 Days
Refuelings: 14
Avg Startup: 8.2 Days
Ownership & Construction
?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Ownership, operation and management history
| Date | Change |
From | To |
| Feb 27, 2020 |
Spin-off |
FirstEnergy |
Energy Harbor |
| Mar 1, 2024 |
Sold |
Energy Harbor |
Vistra |
VST
Vistra Corp.
NYSE
$140.16
▼ -0.67 (-0.48%)
Previous Close
140.83
Day's Range
136.18 – 141.50
52-Week Range
132.66 – 203.66
Volume
6,723,877
Operational Excellence Score Subscribers
Perry 1 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.
- This unit's composite score and fleet rank
- Reliability, Efficiency and Discipline sub-scores
- All seven measured inputs, with fleet percentiles
- Rank against comparable units, not just the fleet
- Three-year, five-year and lifetime windows
- Five-year trend, and every other operating US reactor
Scram History
10 events since 2011
?
Automatic and manual reactor scram (emergency shutdown) events reported to the NRC since 2011. Includes event dates, trip type, and average recovery time. Click the title to view the full fleet scram dashboard.
Perry 1 has recorded 10 reactor scrams, or emergency shutdowns, since 2011 (8 automatic, 2 manual). On average the unit was back to full power about 13.8 days after each trip.
Recent Events
| 2023-08-10 |
Auto |
AUTOMATIC REACTOR TRIP The following information was provide... |
|
| 2023-01-05 |
Auto |
AUTOMATIC REACTOR SCRAM The following information was provid... |
|
| 2019-07-27 |
Auto |
AUTOMATIC REACTOR SCRAM DUE TO MAIN TURBINE TRIP "At 1929 ED... |
|
| 2019-02-25 |
Auto |
AUTOMATIC REACTOR SCRAM DUE TO GENERATOR TRIP "At 0024 EST o... |
|
| 2016-02-08 |
Manual |
MANUAL REACTOR SCRAM FOLLOWING SPURIOUS OPENING OF TWO SAFET... |
|
| 2016-01-24 |
Auto |
TS REQUIRED SHUTDOWN DUE TO UNIDENTIFIED LEAKAGE IN DRYWELL ... |
|
| 2014-11-07 |
Auto |
AUTOMATIC REACTOR SCRAM DUE TO LOSS OF FEEDWATER "The Perry ... |
|
| 2014-10-20 |
Auto |
AUTOMATIC REACTOR SCRAM ON LOSS OF FEEDWATER "The Perry Powe... |
|
+2 more events
Technical Specs
?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Turbine Supplier:
GENERAL ELECTRIC CO. IAEA
Thermal Power:
3758 MWt
Net Capacity:
1240 MWe
Gross Capacity:
1,303 MWe IAEA
Design Capacity:
1,205 MWe IAEA
Efficiency:
33%
Lifetime Output:
337.3 TWh through 2025 IAEA
Licensing
?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #:
05000440
License #:
NPF-58
License Type:
OL-FP
Const. Permit:
1977-05-03
Construction Start:
1974-10-01 IAEA
Operating Lic:
1986-11-13
First Criticality:
1986-06-06 IAEA
Grid Connection:
1986-12-19 IAEA
Commercial Op:
1987-11-18
License Renewed:
2025-07-07
License Exp:
2046-11-07
Market & Region
?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region:
RFC
— Reliability First Corporation
Census Region:
ENC
— East North Central
Balancing Authority:
PJM
— PJM Interconnection (ISO/RTO)
Market Structure:
Merchant
— Competitive generator selling into wholesale markets