B2B CHAMPION
1,406 days without a trip
·
5 Career Runs · 2 since last trip
Champion since Jul 24, 2024
Breaker-to-Breaker Runs
5 runs
?
Breaker-to-breaker runs measure continuous operation between refueling outages using a cycle-adjusted threshold (90% of cycle length minus RFO duration). An active streak means the unit has been running continuously since the last refueling with no trips to 0% power.
Salem 2 has logged 5 breaker-to-breaker runs, continuous stretches from one refueling to the next with no trip to zero power. Its longest ran 527 days, and its runs average 508 days.
527
Best Run (days)
2R26 (2023-04-28) → 2R27 (2024-10-06)
★ Double breaker-to-breaker
2R26 → 2R27 → 2R28
All Runs
| 2024-11-25 |
2026-04-05 |
496 days |
2R27 → 2R28 |
| 2023-04-28 |
2024-10-06 |
527 days |
2R26 → 2R27 |
| 2020-05-18 |
2021-10-02 |
502 days |
2R24 → 2R25 |
| 2008-05-16 |
2009-10-14 |
516 days |
2R16 → 2R17 |
| 1999-05-27 |
2000-10-06 |
498 days |
2R10 → 2R11 |
About This Site
?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Salem Nuclear Power Plant.
Salem Nuclear Generating Station is in Lower Alloways Creek Township, Salem County, New Jersey, on Artificial Island on the Delaware River shore, where it shares the island with the Hope Creek plant. It draws cooling water from the Delaware estuary.
Read more
The plant has two Westinghouse four-loop pressurized water reactors. Construction began on September 25, 1968. Unit 1 entered commercial operation on June 30, 1977, and Unit 2 on October 13, 1981. In the 1990s both reactors were shut down for about two years because of maintenance problems. In August 2013 the plant shut down after a leak of slightly radioactive water and resumed two days later.
Facility Statistics
?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Salem 2 has operated for about 45.1 years and averaged a 89.7% lifetime capacity factor, generating roughly 252.1 TWh of electricity. Its longest unbroken run reached 531 days.
Lifecycle & Tenure
Operating Age: 45.1 Yrs
Build Time: 13 Yrs
Lic. Remaining: 13.5 Yrs
Production & Power
Lifetime CF: 89.7%
Efficiency: 33%
Generated: 252.1 TWh
Reliability & Outages
Record Run: 531 Days
Refuelings: 19
Avg Startup: 6 Days
Ownership & Construction
?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Ownership, operation and management history
No change of owner, operator or management company on record. Our history starts in 1999.
PEG
Public Service Enterprise Group Incorporated
NYSE
$74.29
▲ +0.66 (+0.90%)
Previous Close
73.63
Day's Range
73.83 – 74.42
52-Week Range
66.15 – 87.63
Volume
4,126,879
Operational Excellence Score Subscribers
Salem 2 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.
- This unit's composite score and fleet rank
- Reliability, Efficiency and Discipline sub-scores
- All seven measured inputs, with fleet percentiles
- Rank against comparable units, not just the fleet
- Three-year, five-year and lifetime windows
- Five-year trend, and every other operating US reactor
Scram History
14 events since 2011
?
Automatic and manual reactor scram (emergency shutdown) events reported to the NRC since 2011. Includes event dates, trip type, and average recovery time. Click the title to view the full fleet scram dashboard.
Salem 2 has recorded 14 reactor scrams, or emergency shutdowns, since 2011 (10 automatic, 4 manual). On average the unit was back to full power about 7.8 days after each trip.
Recent Events
| 2022-12-24 |
Auto |
AUTOMATIC REACTOR TRIP The following information was provide... |
|
| 2019-08-11 |
Manual |
MANUAL REACTOR TRIP DUE TO FEEDWATER REGULATING VALVE MALFUN... |
|
| 2019-01-31 |
Manual |
MANUAL REACTOR TRIP - CIRCULATING WATER ICING CONDITIONS "At... |
|
| 2018-09-14 |
Auto |
AUTOMATIC REACTOR TRIP DUE TO A FAILURE OF THE STEAM GENERAT... |
|
| 2018-05-07 |
Manual |
MANUAL REACTOR TRIP"This 4 and 8 hour notification is being ... |
|
| 2016-08-31 |
Auto |
AUTOMATIC REACTOR TRIP ON LOW REACTOR COOLANT FLOW "This 4-h... |
|
| 2016-06-28 |
Auto |
AUTOMATIC REACTOR TRIP ON MAIN GENERATOR PROTECTION SIGNAL "... |
|
| 2016-02-14 |
Auto |
AUTOMATIC REACTOR TRIP ON MAIN GENERATOR PROTECTION TRIP "Th... |
|
+6 more events
Technical Specs
?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Turbine Supplier:
WESTINGHOUSE ELECTRIC CORPORATION IAEA
Thermal Power:
3459 MWt
Net Capacity:
1142 MWe
Gross Capacity:
1,200 MWe IAEA
Design Capacity:
1,115 MWe IAEA
Efficiency:
33%
Lifetime Output:
327.9 TWh through 2025 IAEA
Licensing
?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #:
05000311
License #:
DPR-75
License Type:
OL-FP
Const. Permit:
1968-09-25
Construction Start:
1968-09-25 IAEA
Operating Lic:
1981-05-20
First Criticality:
1980-08-08 IAEA
Grid Connection:
1981-06-03 IAEA
Commercial Op:
1981-10-13
License Renewed:
2011-06-30
License Exp:
2040-04-18
Market & Region
?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region:
RFC
— Reliability First Corporation
Census Region:
MAT
— Middle Atlantic
Balancing Authority:
PJM
— PJM Interconnection (ISO/RTO)
Market Structure:
Merchant
— Competitive generator selling into wholesale markets