Southern California Edison·San Clemente, CA·PWR·1,070 MWe
Operational history, outage history & performance charts, scram history, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for San Onofre 2.
Breaker-to-breaker runs measure continuous operation between refueling outages using a cycle-adjusted threshold (90% of cycle length minus RFO duration). An active streak means the unit has been running continuously since the last refueling with no trips to 0% power.
San Onofre 2 has logged 1 breaker-to-breaker run, continuous stretches from one refueling to the next with no trip to zero power. Its longest ran 590 days, and its runs average 590 days.
590
Best Run (days)
1999-02-26 → 2R13 (2000-10-08)
590
Avg Run (days)
About This Site
?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: San Onofre Nuclear Generating Station.
San Onofre Nuclear Generating Station stands on the Pacific coast in San Diego County, California, just south of San Clemente, on land within Marine Corps Base Camp Pendleton.
Read more
Unit 1, a Westinghouse pressurized water reactor, began construction in August 1964, entered commercial operation on January 1, 1968, and was shut down on November 30, 1992. Units 2 and 3 are Combustion Engineering two-loop pressurized water reactors that entered commercial operation on August 8, 1983, and April 1, 1984. In January 2012 both units went offline after premature wear was found in replacement steam generators installed in 2010 and 2011, and Unit 3 had a radioactive leak on January 31, 2012. Southern California Edison announced the permanent retirement of Units 2 and 3 in June 2013.
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
San Onofre 2 has operated for about 28.4 years and averaged a 75.5% lifetime capacity factor, generating roughly 103.0 TWh of electricity. Its longest unbroken run reached 4,837 days.
Lifecycle & Tenure
Operating Age:28.4 Yrs
Build Time:9.8 Yrs
Lic. Remaining:N/A Yrs
Production & Power
Lifetime CF:75.5%
Efficiency:31.6%
Generated:103.0 TWh
Reliability & Outages
Record Run:4,837 Days
Refuelings:5
Avg Startup:9.3 Days
Ownership & Construction
?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Automatic and manual reactor scram (emergency shutdown) events reported to the NRC since 2011. Includes event dates, trip type, and average recovery time. Click the title to view the full fleet scram dashboard.
San Onofre 2 has recorded 1 reactor scram, or emergency shutdown, since 2011 (1 automatic, 0 manual). On average the unit was back to full power about 4 days after each trip.
1
Total
1
Automatic
0
Manual
4
Avg Recovery (days)
Recent Events
2011-09-08
Auto
AUTOMATIC REACTOR TRIP DUE TO A GRID DISTURBANCE On Septembe...
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.