San Onofre 2

Decommissioned

Southern California Edison·San Clemente, CA·PWR·1,070 MWe

Operational history, outage history & performance charts, scram history, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for San Onofre 2.

Decommissioned

Permanently shut down on 2012-01-09. View Outage History →

Excellence Score, Records & Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: San Onofre Nuclear Generating Station.

San Onofre Nuclear Generating Station stands on the Pacific coast in San Diego County, California, just south of San Clemente, on land within Marine Corps Base Camp Pendleton.

Read more

Unit 1, a Westinghouse pressurized water reactor, began construction in August 1964, entered commercial operation on January 1, 1968, and was shut down on November 30, 1992. Units 2 and 3 are Combustion Engineering two-loop pressurized water reactors that entered commercial operation on August 8, 1983, and April 1, 1984. In January 2012 both units went offline after premature wear was found in replacement steam generators installed in 2010 and 2011, and Unit 3 had a radioactive leak on January 31, 2012. Southern California Edison announced the permanent retirement of Units 2 and 3 in June 2013.

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
San Onofre 2 has operated for about 28.4 years and averaged a 75.5% lifetime capacity factor, generating roughly 103.0 TWh of electricity. Its longest unbroken run reached 4,837 days.
Lifecycle & Tenure
Operating Age: 28.4 Yrs
Build Time: 9.8 Yrs
Lic. Remaining: N/A Yrs
Production & Power
Lifetime CF: 75.5%
Efficiency: 31.6%
Generated: 103.0 TWh
Reliability & Outages
Record Run: 4,837 Days
Refuelings: 5
Avg Startup: 9.3 Days

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Architect Engineer: BECH
Constructor: BECH
Ownership, operation and management history
No change of owner, operator or management company on record. Our history starts in 1999.
EIX Edison International NYSE
$57.40 ▲ +0.87 (+1.53%)
Previous Close 56.53
Day's Range 56.52 – 57.42
52-Week Range 51.10 – 81.62
Volume 1,794,247
Delayed quote as of Oct 21, 2026 3:49 PM ET. Source: Yahoo Finance. Full quote on Yahoo Finance

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: PWR
Containment: PWR-DRYAMB
NSS Supplier: COMB CE
Turbine Supplier: GEC TURBINE GENERATORS, LTD. IAEA
Thermal Power: 3390 MWt
Net Capacity: 1070 MWe
Gross Capacity: 1,127 MWe IAEA
Design Capacity: 1,070 MWe IAEA
Efficiency: 31.6%
Lifetime Output: 219.2 TWh through 2025 IAEA

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000361
License #: NPF-10
License Type: OL-FP
Const. Permit: 1973-10-18
Construction Start: 1974-03-01 IAEA
Operating Lic: 1982-09-07
First Criticality: 1982-07-26 IAEA
Grid Connection: 1982-09-20 IAEA
Commercial Op: 1983-08-08
License Exp: 2013-10-18