Reactor Status Timeline
Online NRC data, Mon to Fri ? Actual daily reactor status from NRC reports (Mon to Fri) and the current state. What is coming -- the utility's published Scheduled outage and NukeWorker's model Projection -- is part of a subscription. Colored by status. How far ahead you can see depends on your plan.Fuel Burn Down Cycle since Nov 6, 2025
NukeWorker's Operational Excellence Score 5-yr composite · ranks 42 of 93 ↓20
Operational
Excellence Score
South Texas 2 ranks #42 of 93 active US units on NukeWorker's Operational Excellence Score over the 5-year window. Strongest area: Fuel Utilization (72th percentile). Weakest: Scrams (5-year) (29th percentile).
Per-dimension breakdown (7 metrics)
Each dimension's percentile is computed across the active US fleet (93 units with sufficient history). Sub-score = average of its component percentiles. Composite = average of the three sub-scores. 5-year window. View full leaderboard →
Methodology
NukeWorker's Operational Excellence Score is a composite ranking that combines 7 publicly observable performance metrics into a single 0-100 number per US nuclear unit.
How it's computed: Each unit's raw value is converted to a percentile (0-100) within the 93 active US units that have at least 2 completed refueling cycles. The 7 percentiles are averaged into 3 sub-scores (Reliability, Efficiency, Discipline), and those are averaged into the final composite.
Active window — 5-year:
- Reliability — Capacity factor (5yr), forced outage days/yr (5yr), B2B avg streak (lifetime)
- Efficiency — in-cycle fuel utilization (3yr), median refuel duration (5yr)
- Discipline — robust mean startup duration, scrams/yr (5yr, annualised)
Cohort rankings: alongside the fleet rank, each unit gets ranked within its reactor type (PWR/BWR), containment design (Ice Condenser, Mark I, etc.), and cycle length (12/18/24-month). Useful for apples-to-apples comparisons.
What's excluded: subjective community ratings, confidential INPO ratings, financial metrics. We only use publicly available NRC + cycle data.
Why three windows? 5yr (default) is the industry standard. 3yr captures recent operational changes and post-pandemic recovery. Lifetime gives newer units a fair comparison and reveals long-term consistency.
Edge cases: units with fewer than 2 cycles (e.g., Vogtle 4) show "Provisional". Decommissioned units excluded.
Refresh cadence: recomputed daily. Each window cached separately.
A data-derived proxy for operational performance; not affiliated with INPO. INPO ratings are confidential and qualitative — ours is public and quantitative.
Capacity Factor (365-Day)
Breaker-to-Breaker Runs 10 runs
| 2024-05-20 | 2025-10-04 | 502 days | 2RE23 → 2RE24 |
| 2022-11-10 | 2024-03-23 | 499 days | 2RE22 → 2RE23 |
| 2021-04-20 | 2022-10-08 | 536 days | 2RE21 → 2RE22 |
| 2019-11-05 | 2021-03-21 | 502 days | 2RE20 → 2RE21 |
| 2018-04-27 | 2019-10-05 | 526 days | 2RE19 → 2RE20 |
| 2016-11-10 | 2018-03-25 | 500 days | 2RE18 → 2RE19 |
| 2015-05-08 | 2016-10-09 | 520 days | 2RE17 → 2RE18 |
| 2013-12-22 | 2015-03-29 | 462 days | 2RE16 → 2RE17 |
| 2007-04-28 | 2008-10-05 | 526 days | 2RE12 → 2RE13 |
| 2005-11-01 | 2007-03-25 | 509 days | 2RE11 → 2RE12 |
Scram History 6 events since 2011
Outage Duration Trend
?Power History (12-Month)
?Outage Days by Year
?Facility Statistics
NukeWorker Member Ratings 40 votes
Facility Map
28.7961, -96.0562
