B2B CHAMPION
464 days without a trip
·
1 Career Run · 1 since last trip
Champion since Oct 19, 2026
Breaker-to-Breaker Runs
1 run
?
Breaker-to-breaker runs measure continuous operation between refueling outages using a cycle-adjusted threshold (90% of cycle length minus RFO duration). An active streak means the unit has been running continuously since the last refueling with no trips to 0% power.
Watts Bar 2 has logged 1 breaker-to-breaker run, continuous stretches from one refueling to the next with no trip to zero power. It is on an active 462-day streak right now.
462
Active Streak (days)
Since 2025-07-17
About This Site
?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Watts Bar Nuclear Plant.
Watts Bar Nuclear Plant is in Rhea County, Tennessee, near Spring City, between Chattanooga and Knoxville, on a 1,770-acre site beside the Tennessee River. The Tennessee Valley Authority built it.
Read more
The plant has two Westinghouse four-loop pressurized water reactors with ice condenser containments. Construction began on both units in 1973 and was suspended in 1985. Work resumed in 1992 on Unit 1 and in 2007 on Unit 2. Unit 1 entered commercial operation in May 1996, and Unit 2 followed in October 2016, the first U.S. reactor to enter commercial operation since Unit 1 at the same plant in 1996.
Facility Statistics
?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Watts Bar 2 has operated for about 10 years and averaged a 84.4% lifetime capacity factor, generating roughly 85.1 TWh of electricity. Its longest unbroken run reached 528 days.
Lifecycle & Tenure
Operating Age: 10 Yrs
Build Time: 43.7 Yrs
Lic. Remaining: 29 Yrs
Production & Power
Lifetime CF: 84.4%
Efficiency: 32.4%
Generated: 85.1 TWh
Reliability & Outages
Record Run: 528 Days
Refuelings: 6
Avg Startup: 6.2 Days
Ownership & Construction
?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Ownership, operation and management history
No change of owner, operator or management company on record. Our history starts in 1999.
Publicly Traded
No — Federal corporation with no common equity. Its listed TVC/TVE securities are power bonds, not stock.
Operational Excellence Score Subscribers
Watts Bar 2 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.
- This unit's composite score and fleet rank
- Reliability, Efficiency and Discipline sub-scores
- All seven measured inputs, with fleet percentiles
- Rank against comparable units, not just the fleet
- Three-year, five-year and lifetime windows
- Five-year trend, and every other operating US reactor
Scram History
16 events since 2011
?
Automatic and manual reactor scram (emergency shutdown) events reported to the NRC since 2011. Includes event dates, trip type, and average recovery time. Click the title to view the full fleet scram dashboard.
Watts Bar 2 has recorded 16 reactor scrams, or emergency shutdowns, since 2011 (12 automatic, 4 manual). On average the unit was back to full power about 10.9 days after each trip.
Recent Events
| 2025-07-13 |
Auto |
AUTOMATIC REACTOR TRIP The following information was provide... |
|
| 2024-03-05 |
Auto |
AUTOMATIC REACTOR TRIP The following information was provide... |
|
| 2024-01-27 |
Auto |
AUTOMATIC REACTOR TRIP The following information was provide... |
|
| 2023-08-04 |
Auto |
AUTOMATIC REACTOR TRIP The following information was provide... |
|
| 2023-06-27 |
Auto |
EN Revision Imported Date: 6/29/2023 EN Revision Text: AUTOM... |
|
| 2021-03-17 |
Auto |
EN Revision Imported Date: 4/16/2021 EN Revision Text: AUTOM... |
|
| 2019-05-22 |
Manual |
MANUAL REACTOR TRIP DUE TO FAILURE OF MAIN FEEDWATER REGULAT... |
|
| 2018-08-22 |
Auto |
AUTOMATIC REACTOR TRIP"At 0943 EDT on August 22, 2018, the W... |
|
+8 more events
Technical Specs
?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Turbine Supplier:
WESTINGHOUSE ELECTRIC CORPORATION IAEA
Thermal Power:
3459 MWt
Net Capacity:
1122 MWe
Gross Capacity:
1,218 MWe IAEA
Design Capacity:
1,165 MWe IAEA
Efficiency:
32.4%
Lifetime Output:
78.4 TWh through 2025 IAEA
Licensing
?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #:
05000391
License #:
NPF-96
License Type:
OL
Const. Permit:
1973-01-23
Construction Start:
1973-09-01 IAEA
Operating Lic:
2015-10-22
First Criticality:
2016-05-23 IAEA
Grid Connection:
2016-06-03 IAEA
Commercial Op:
2016-10-19
License Exp:
2055-10-22
Market & Region
?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region:
SERC
— SERC Reliability Corporation
Census Region:
ESC
— East South Central
Balancing Authority:
TVA
— Tennessee Valley Authority
Market Structure:
Regulated
— Rate-regulated utility (cost-of-service pricing)