Watts Bar 2

Online · 100% power

Tennessee Valley Authority·Spring City, TN·PWR·1,122 MWe

Live reactor status, daily power data, outage history & performance charts, scram history, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for Watts Bar 2.

?
Composite Operational Excellence Score (0-100) — average percentile rank across 7 dimensions in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). 5-year window. Higher = more operationally excellent. Click to see the full breakdown.
   
Excellence
Rank locked · 93 units
Subscribers
?
Current reactor power level from the most recent NRC daily report.
100%
Power
ONLINE
?
Days of continuous operation since the last outage ended. Ranked against all operating units.
464
Current Run
days
#9 of 95
Top Quartile
?
Longest recorded period of continuous operation between outages.
528
Record Run
days
#87 of 95
Bottom Quartile
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold (459 days for this 18-month cycle unit) with no trips to 0% power.
1
B2B Runs
Active: 462 days
#86 of 86
Bottom Quartile
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power). Ranked against all NRC-tracked units.
84.4%
Capacity Factor
#86 of 95
Bottom Quartile
?
Net electricity actually generated over the most recent 12 months reported by the U.S. Energy Information Administration (Form EIA-923), summed across every unit at this plant. These are authoritative actuals, not an estimate.
19.81 TWh
Net Generation
EIA-923 · 12 mo to 2026-07 · plant total
?
Total NRC-reported scram events (emergency reactor shutdowns). Ranked fleet-wide — fewer scrams = better rank.
16
Scrams
#90 of 94
Bottom Quartile
?
Years since commercial operation began. License remaining: 29 years.
10
Operating Age
years
29 yrs remaining

Excellence Score, Records & Plant Facts

B2B CHAMPION
464 days without a trip  ·  1 Career Run  · 1 since last trip
Champion since Oct 19, 2026

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Watts Bar Nuclear Plant.

Watts Bar Nuclear Plant is in Rhea County, Tennessee, near Spring City, between Chattanooga and Knoxville, on a 1,770-acre site beside the Tennessee River. The Tennessee Valley Authority built it.

Read more

The plant has two Westinghouse four-loop pressurized water reactors with ice condenser containments. Construction began on both units in 1973 and was suspended in 1985. Work resumed in 1992 on Unit 1 and in 2007 on Unit 2. Unit 1 entered commercial operation in May 1996, and Unit 2 followed in October 2016, the first U.S. reactor to enter commercial operation since Unit 1 at the same plant in 1996.

10 miles south of Spring City, Tennessee Forum Lodging tips

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Watts Bar 2 has operated for about 10 years and averaged a 84.4% lifetime capacity factor, generating roughly 85.1 TWh of electricity. Its longest unbroken run reached 528 days.
Lifecycle & Tenure
Operating Age: 10 Yrs
Build Time: 43.7 Yrs
Lic. Remaining: 29 Yrs
Production & Power
Lifetime CF: 84.4%
Efficiency: 32.4%
Generated: 85.1 TWh
Reliability & Outages
Record Run: 528 Days
Refuelings: 6
Avg Startup: 6.2 Days

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Architect Engineer: TVA
Constructor: TVA
Ownership, operation and management history
No change of owner, operator or management company on record. Our history starts in 1999.
Publicly Traded No — Federal corporation with no common equity. Its listed TVC/TVE securities are power bonds, not stock.

Operational Excellence Score Subscribers

Watts Bar 2 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.

  • This unit's composite score and fleet rank
  • Reliability, Efficiency and Discipline sub-scores
  • All seven measured inputs, with fleet percentiles
  • Rank against comparable units, not just the fleet
  • Three-year, five-year and lifetime windows
  • Five-year trend, and every other operating US reactor

Included with every outage subscription and with NukeWorker Gold membership. Trading the outage rather than working it? The same record, cut by power market, is on NukeGryd.

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: PWR
Containment: PWR-ICECND
NSS Supplier: WEST 4LP
Turbine Supplier: WESTINGHOUSE ELECTRIC CORPORATION IAEA
Thermal Power: 3459 MWt
Net Capacity: 1122 MWe
Gross Capacity: 1,218 MWe IAEA
Design Capacity: 1,165 MWe IAEA
Efficiency: 32.4%
Status: Operating
Lifetime Output: 78.4 TWh through 2025 IAEA

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000391
License #: NPF-96
License Type: OL
Const. Permit: 1973-01-23
Construction Start: 1973-09-01 IAEA
Operating Lic: 2015-10-22
First Criticality: 2016-05-23 IAEA
Grid Connection: 2016-06-03 IAEA
Commercial Op: 2016-10-19
License Exp: 2055-10-22

Market & Region

?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region: SERC — SERC Reliability Corporation
Census Region: ESC — East South Central
Balancing Authority: TVA — Tennessee Valley Authority
Market Structure: Regulated — Rate-regulated utility (cost-of-service pricing)