Dresden 3

Online · 100% power

Constellation Energy·Morris, IL·BWR·895 MWe

Reactor Status Timeline

Online NRC data, Mon to Fri ? Actual daily reactor status from NRC reports (Mon to Fri) and the current state. What is coming -- the utility's published Scheduled outage and NukeWorker's model Projection -- is part of a subscription. Colored by status. How far ahead you can see depends on your plan.
Dec2025Jan2026FebMarAprMayJunJulAugSepOctNovDecOnline: Nov 25, 2025 to Jan 9, 2026Reduced Power: Jan 10, 2026Online: Jan 11, 2026 to Mar 6, 2026Reduced Power: Mar 7, 2026Online: Mar 8, 2026 to Apr 7, 2026Forced Outage: Apr 8, 2026 to Apr 13, 2026Reduced Power: Apr 14, 2026Online: Apr 15, 2026 to May 30, 2026Reduced Power: May 31, 2026Online: Jun 1, 2026 to Sep 4, 2026Reduced Power: Sep 5, 2026Online: Sep 6, 2026 to Sep 18, 2026Reduced Power: Sep 19, 2026Online: Sep 20, 2026 to Oct 7, 2026Coastdown: Oct 8, 2026 to Oct 25, 2026Refueling Outage (D3R29): Oct 26, 2026 to Nov 17, 2026D3R29Power Ascension: Nov 18, 2026 to Nov 20, 2026Online: Nov 21, 2026 to Nov 25, 2026Today
OnlineReduced PowerCoastdownPower AscensionRefueling OutageForced Outage
?
Composite Operational Excellence Score (0-100) — average percentile rank across 7 dimensions in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). 5-year window. Higher = more operationally excellent. Click to see the full breakdown.
   
Excellence
Rank locked · 93 units
Subscribers
?
Days of continuous operation since the last outage ended. Clean run (no forced outages since last refueling).
8
Current Run
days ✔
?
Longest recorded period of continuous operation between outages (2010-11-25 to 2012-11-12).
718
Record Run
days
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold set for this unit with no trips to 0% power.
2
B2B Runs
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power).
93.2%
Capacity Factor
?
Net electricity actually generated over the most recent 12 months reported by the U.S. EIA (Form EIA-923), summed across every unit at this plant. Authoritative actuals, not an estimate.
15.15 TWh
Net Generation
EIA-923 · 12 mo to 2026-08 · plant total
?
Total number of scheduled refueling outages detected in the historical data.
15
Outages
since 1999
?
Average time from first power generation (>0%) to sustained full power (≥95% for 2+ days) across the last 3 scheduled outages. Click to compare against the fleet on the Operator Efficiency Leaderboard.
3
Avg Startup
days (last 3)
?
Average fuel utilization — percent of the designed fuel cycle that this unit consumes before refueling, derived from the historical burn-down trajectory. Higher = more efficient operator (refuels with less margin remaining; closer to coastdown). Computed as 100% minus the unit's average refuel-point fuel %, using the last 3 years where available, otherwise lifetime average. Click to compare against the fleet on the Operator Efficiency Leaderboard.
97.3%
Fuel Utilization
3yr avg

Reactor Status

Capacity Factor (365-Day)

?
100%
Current
90.6%
365-Day Avg
#62
of 94 plants
Min: 0% Max: 100% 35 days <80%

Outage Days by Year

?
Total days spent in outage each year, split by scheduled refueling (blue) and forced/unplanned (red). Lower totals indicate better reliability and outage execution. Hover for details.
Across its recorded history, Dresden 3 has spent 301 days in scheduled refueling outages and 149 days in forced or unplanned outages. Taller bars mark the years with the most downtime.
?
Duration of each outage in days, shown chronologically. Green bars are scheduled refueling outages, red bars are forced/unscheduled. The orange dashed line marks the average duration. Extended outages (>180 days) and D&D periods are excluded.

Outage Duration Trend

Dresden 3 has 47 outages plotted here, averaging 10 days each. The most recent, in Oct 2026, was a scheduled refueling outage lasting 23 days.
?
Scheduled refueling outage durations over time. Green bars are at or below this unit's average, amber up to 30% above it, red beyond that. The dashed line is the average. Shorter outages mean better execution.

Refueling Duration Trend

Dresden 3 has completed 15 scheduled refueling outages on record, averaging 20 days each. The most recent, in Oct 2026, ran 23 days.
?
Time in days from first power generation (>0%) to sustained full power (≥95% for 2+ consecutive days) after each scheduled refueling outage. The dashed line marks the average. Includes startup testing holds and power dips.

Startup Duration Trend

After a refueling outage, Dresden 3 takes about 3 days to climb from first power back to full power. That average is drawn from 15 startups on record, and the most recent took 3 days.
?
Daily reactor power over the 120 days before each scheduled refueling outage, one line per refueling, lined up on the day the outage began. A coastdown is the slow decline as the fuel runs out near the end of a cycle. The highlighted line is the most recent refueling and fainter lines are older. Counts and medians cover coastdowns of a week or longer. A shutdown straight from full power, with no decline ahead of it, is what a forced outage looks like.

Coastdown Before Refueling

12 of 14 refuelings 40 days median 84% power at shutdown 0.3% per day
Dresden 3 coasted down for a week or longer before 12 of its 14 refuelings on record. Those coastdowns ran a median of 40 days and ended near 84% power. The most recent refueling, in Oct 2026, followed a 18-day coastdown from 95% to 89%.
?
Monthly capacity factor with outage events overlaid as red bands. Green bars show average power level per month. Toggle to Daily view for raw daily data.

Power History

Over its operating life, Dresden 3 has run at about 93.2% of its rated capacity. Across the last 12 reported months it averaged 89.2%. On the chart, green stretches near the top are full-power running, amber marks reduced power (50 to 89%), and red drops toward zero are outages.

Outage History & Daily Power Log

This table logs every recorded outage for Dresden 3, 47 in all since 1999. Of those, 15 were scheduled refueling outages, 1 was planned maintenance and 31 were unplanned or forced. The typical outage lasted about 10 days. Where the Scheduled column shows (Model), the date is a NukeWorker projection because the utility had not published one.
Scheduled D3R29
2026-10-26 2026-11-17 23 196d 2026-10-27 -1d
Unscheduled
2026-04-08 2026-04-13 6 212d - -
Unscheduled
2025-09-04 2025-09-08 5 293d - -
Scheduled D3R28
2024-10-28 2024-11-15 19 62d 2024-10-28 0d
Unscheduled
2024-08-24 2024-08-27 4 489d - -
Unscheduled
2023-04-22 2023-04-23 2 156d - -
Scheduled D3R27
2022-10-31 2022-11-17 18 202d 2022-10-31 0d
Unscheduled
2022-04-11 2022-04-12 2 163d - -
Scram # 55527 Auto
2021-10-17 2021-10-30 14 345d - -
Scheduled D3R26
2020-10-26 2020-11-06 12 72d 2020-10-26 0d
Unscheduled
2020-08-12 2020-08-15 4 639d - -
Scheduled D3R25
2018-10-30 2018-11-12 14 713d 2018-10-29 +1d
Scheduled D3R24
2016-11-01 2016-11-16 16 331d 2016-10-31 +1d
Planned Mid-Cycle Planned
2015-11-30 2015-12-06 7 377d - -
Scheduled D3R23
2014-11-03 2014-11-18 16 375d 2014-11-03 0d
Unscheduled
2013-10-20 2013-10-24 5 321d - -
Scheduled D3R22
2012-11-12 2012-12-03 22 718d 2012-11-12 0d
Scheduled D3R21
2010-11-01 2010-11-25 25 19d 2010-11-01 0d
Unscheduled
2010-10-12 2010-10-13 2 371d - -
Unscheduled
2009-10-04 2009-10-06 3 162d - -
Unscheduled
2009-04-25 2009-04-25 1 157d - -
Scheduled D3R20
2008-11-03 2008-11-19 17 291d 2008-11-03 0d
Unscheduled
2008-01-10 2008-01-17 8 117d - -
Unscheduled
2007-09-15 2007-09-15 1 297d - -
Scheduled D3R19
2006-11-04 2006-11-22 19 346d 2006-11-03 +1d
Unscheduled
2005-11-06 2005-11-23 18 191d - -
Unscheduled
2005-04-27 2005-04-29 3 143d - -
Scheduled D3R18
2004-10-27 2004-12-05 40 171d 2004-10-26 +1d
Unscheduled
2004-05-06 2004-05-09 4 95d - -
Unscheduled
2004-01-31 2004-02-01 2 7d - -
Unscheduled
2004-01-24 2004-01-24 1 35d - -
Unscheduled
2003-12-06 2003-12-20 15 172d - -
Unscheduled
2003-06-12 2003-06-17 6 183d - -
Unscheduled
2002-12-08 2002-12-11 4 44d - -
Scheduled D3R17
2002-10-09 2002-10-25 17 77d 2002-10-09 0d
Unscheduled
2002-07-22 2002-07-24 3 121d - -
Unscheduled
2002-03-16 2002-03-23 8 88d - -
Unscheduled
2001-12-11 2001-12-18 8 8d - -
Unscheduled
2001-12-02 2001-12-03 2 149d - -
Unscheduled
2001-07-06 2001-07-06 1 3d - -
Unscheduled
2001-07-02 2001-07-03 2 64d - -
Unscheduled
2001-04-28 2001-04-29 2 208d - -
Scheduled D3R16
2000-09-16 2000-10-02 17 134d 2000-09-16 0d
Unscheduled
2000-05-04 2000-05-05 2 144d - -
Unscheduled
1999-12-11 1999-12-12 2 263d - -
Unscheduled
1999-03-22 1999-03-23 2 26d - -
Scheduled D3R15
1999-01-30 1999-02-24 26 - 1999-01-30 0d