Reactor Status Timeline
Online NRC data, Mon to Fri ? Actual daily reactor status from NRC reports (Mon to Fri) and the current state. What is coming -- the utility's published Scheduled outage and NukeWorker's model Projection -- is part of a subscription. Colored by status. How far ahead you can see depends on your plan.OnlineCoastdownPower AscensionRefueling Outage
?
Composite Operational Excellence Score (0-100) — average percentile rank across 7 dimensions in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). 5-year window. Higher = more operationally excellent. Click to see the full breakdown.
Excellence
ranked of 93
Subscribers
?
Days of continuous operation since the last outage ended (Started 2026-04-23). Clean run (no forced outages since last refueling).
141
Current Run
days ✔
?
Longest recorded period of continuous operation between outages (2005-04-10 to 2006-10-09).
547
Record Run
days
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold set for this unit with no trips to 0% power.
9
B2B Runs
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power).
93.6%
Capacity Factor
?
Net electricity actually generated over the most recent 12 months reported by the U.S. EIA (Form EIA-923). Authoritative actuals, not an estimate.
4.71 TWh
Net Generation
EIA-923 · 12 mo to 2026-06
?
Total number of scheduled refueling outages detected in the historical data.
19
Outages
since 1999
?
Average time from first power generation (>0%) to sustained full power (≥95% for 2+ days) across the last 3 scheduled outages. Click to compare against the fleet on the Operator Efficiency Leaderboard.
2.7
Avg Startup
days (last 3)
?
Average fuel utilization — percent of the designed fuel cycle that this unit consumes before refueling, derived from the historical burn-down trajectory. Higher = more efficient operator (refuels with less margin remaining; closer to coastdown). Computed as 100% minus the unit's average refuel-point fuel %, using the last 3 years where available, otherwise lifetime average. Click to compare against the fleet on the Operator Efficiency Leaderboard.
98.1%
Fuel Utilization
3yr avg
?
NukeWorker's Operational Excellence Score is a composite 0–100 ranking of every active US nuclear unit across 7 measured performance metrics, grouped into three sub-scores:
• Reliability — capacity factor, forced outage days, B2B avg streak
• Efficiency — fuel utilization, refuel duration
• Discipline — startup duration, scram count
Each unit's metric is converted to a percentile across the active fleet. Sub-score = average of its components; composite = average of the three sub-scores. Use the time-window toggle below to switch between 3yr / 5yr / lifetime.
• Reliability — capacity factor, forced outage days, B2B avg streak
• Efficiency — fuel utilization, refuel duration
• Discipline — startup duration, scram count
Each unit's metric is converted to a percentile across the active fleet. Sub-score = average of its components; composite = average of the three sub-scores. Use the time-window toggle below to switch between 3yr / 5yr / lifetime.
Time window
— change how far back we look
5-yr trend:
Stable vs 2025
Compare Ginna head-to-head with up to 3 other units.
Compare now
?
Duration of each outage in days, shown chronologically. Green bars are scheduled refueling outages, red bars are forced/unscheduled. The orange dashed line marks the average duration. Extended outages (>180 days) and D&D periods are excluded.
Outage Duration Trend
Ginna has 36 outages plotted here, averaging 15 days each. The most recent, in Apr 2026, was a scheduled refueling outage lasting 18 days.
?
Time in days from first power generation (>0%) to sustained full power (≥95% for 2+ consecutive days) after each scheduled refueling outage. The dashed line marks the average. Includes startup testing holds and power dips.
Startup Duration Trend
After a refueling outage, Ginna takes about 5 days to climb from first power back to full power. That average is drawn from 19 startups on record, and the most recent took 3 days.
?
Estimated fuel remaining in the current cycle, expressed as a percentage of the unit's typical cycle. Starts at 100% when the unit returns to power post-refuel and drops as full-power-days are burned. Days at reduced power burn fuel proportionally — so a unit with significant downtime (high burn deficit) drops slower and ends up with MORE fuel left than its calendar position would suggest. Coastdown threshold around 15%. Toggle to overlay past cycles on a normalized "days into cycle" axis to see how aggressively this unit historically burns down before refuel.
Fuel Burn Down Cycle since Apr 24, 2026
73.8% remaining
0.6 FPD margin
Ginna has an estimated 73.8% of its fuel left. Across its last 18 cycles, it has refueled with an average of 3.7% remaining.
Avg refuel: 3.7%
Avg refuel (3yr): 1.9%
Deepest burn: 0.0% (2005-04 → 2006-10)
Most margin: 9.5% (2008-05 → 2009-09)
?
Monthly capacity factor with outage events overlaid as red bands. Green bars show average power level per month. Toggle to Daily view for raw daily data.
Power History
Over its operating life, Ginna has run at about 93.6% of its rated capacity. Across the last 12 reported months it averaged 93.9%. On the chart, flat stretches near the top are full-power running and drops to zero are outages.
This table logs every recorded outage for Ginna, 36 in all since 1999. Of those, 19 were scheduled refueling outages and 17 were unplanned or forced. The typical outage lasted about 15 days. Where the Scheduled column shows (Model), the date is a NukeWorker projection because the utility had not published one.
| Type ⇅ | Actual Start ⇅ | Actual End ⇅ | Duration ⇅ | Days Online ⇅ | Scheduled | Delta |
|---|---|---|---|---|---|---|
|
Scheduled
G1R46
|
2026-04-06 | 2026-04-23 | 18 | 538d | 2026-04-06 | 0d |
|
Scheduled
G1R45
|
2024-09-30 | 2024-10-15 | 16 | 352d | 2024-09-30 | 0d |
|
Scram
# 56790
|
2023-10-13 | 2023-10-14 | 2 | 32d | - | - |
|
Scram
# 56731
|
2023-09-10 | 2023-09-11 | 2 | 133d | - | - |
|
Scheduled
G1R44
|
2023-04-10 | 2023-04-30 | 21 | 535d | 2023-04-09 | +1d |
|
Scheduled
G1R43
|
2021-10-04 | 2021-10-22 | 19 | 499d | 2021-10-18 | -14d |
|
Scheduled
G1R42
|
2020-04-06 | 2020-05-23 | 48 | 294d | 2020-04-06 | 0d |
|
Unscheduled
|
2019-06-17 | 2019-06-17 | 1 | 221d | - | - |
|
Scheduled
G1R41
|
2018-10-22 | 2018-11-08 | 18 | 226d | 2018-10-22 | 0d |
|
Unscheduled
|
2018-03-09 | 2018-03-10 | 2 | 299d | - | - |
|
Scheduled
G1R40
|
2017-04-24 | 2017-05-14 | 21 | 535d | 2017-04-24 | 0d |
|
Scheduled
G1R39
|
2015-10-19 | 2015-11-06 | 19 | 512d | 2015-10-19 | 0d |
|
Unscheduled
Startup Hold
|
2014-05-25 | 2014-05-25 | 1 | 5d | - | - |
|
Scheduled
G1R38
|
2014-04-28 | 2014-05-20 | 23 | 275d | 2014-04-27 | +1d |
|
Scram
# 49214
|
2013-07-25 | 2013-07-27 | 3 | 247d | - | - |
| 2012-11-20 | 2012-11-20 | 1 | 2d | - | - | |
|
Scheduled
G1R37
|
2012-10-22 | 2012-11-18 | 28 | 373d | 2012-10-20 | +2d |
|
Scram
# 47338
|
2011-10-12 | 2011-10-15 | 4 | 125d | - | - |
|
Scheduled
G1R36
|
2011-04-24 | 2011-06-09 | 47 | 475d | 2011-04-25 | -1d |
|
Unscheduled
|
2009-12-31 | 2010-01-04 | 5 | 90d | - | - |
|
Scheduled
G1R35
|
2009-09-14 | 2009-10-02 | 19 | 491d | 2009-09-13 | +1d |
|
Scheduled
G1R34
|
2008-04-21 | 2008-05-11 | 21 | 400d | 2008-04-13 | +8d |
|
Unscheduled
|
2007-03-17 | 2007-03-18 | 2 | 48d | - | - |
|
Unscheduled
|
2007-01-28 | 2007-01-28 | 1 | 87d | - | - |
|
Scheduled
G1R33
|
2006-10-09 | 2006-11-02 | 25 | 547d | 2006-10-08 | +1d |
|
Scheduled
G1R32
|
2005-03-21 | 2005-04-10 | 21 | 31d | 2005-03-20 | +1d |
| 2005-02-17 | 2005-02-18 | 2 | 123d | - | - | |
|
Unscheduled
|
2004-10-16 | 2004-10-17 | 2 | 368d | - | - |
|
Scheduled
G1R31
|
2003-09-16 | 2003-10-14 | 29 | 30d | 2003-09-16 | 0d |
| 2003-08-15 | 2003-08-17 | 3 | 484d | - | - | |
|
Scheduled
G1R30
|
2002-03-19 | 2002-04-18 | 31 | 41d | 2002-03-19 | 0d |
| 2002-02-06 | 2002-02-06 | 1 | 472d | - | - | |
| 2000-10-22 | 2000-10-22 | 1 | 4d | - | - | |
|
Scheduled
G1R29
|
2000-09-19 | 2000-10-18 | 30 | 509d | 2000-09-19 | 0d |
| 1999-04-28 | 1999-04-29 | 2 | 7d | - | - | |
|
Scheduled
G1R28
|
1999-03-02 | 1999-04-21 | 51 | - | 1999-03-02 | 0d |