Limerick 2

Online · 100% power

Constellation Energy·Pottstown, PA·BWR·1,122 MWe

Data refreshed 5.4h ago Rx Status: Oct 22, 2026 at 5:16 AM (M-F)

Reactor Status Timeline

Online NRC data, Mon to Fri ? Actual daily reactor status from NRC reports (Mon to Fri) and the current state. What is coming -- the utility's published Scheduled outage and NukeWorker's model Projection -- is part of a subscription. Colored by status. How far ahead you can see depends on your plan.
Nov2025DecJan2026FebMarAprMayJunJulAugSepOctNovOnline: Oct 22, 2025 to Mar 6, 2026Reduced Power: Mar 7, 2026Online: Mar 8, 2026 to Apr 17, 2026Reduced Power: Apr 18, 2026Online: Apr 19, 2026 to May 29, 2026Reduced Power: May 30, 2026Online: May 31, 2026 to Sep 11, 2026Reduced Power: Sep 12, 2026 to Sep 13, 2026Online: Sep 14, 2026 to Oct 22, 2026Today
OnlineReduced Power
?
Composite Operational Excellence Score (0-100) — average percentile rank across 7 dimensions in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). 5-year window. Higher = more operationally excellent. Click to see the full breakdown.
   
Excellence
Rank locked · 93 units
Subscribers
?
Days of continuous operation since the last outage ended (Started 2025-05-16). Clean run (no forced outages since last refueling).
524
Current Run
days ✔
?
Longest recorded period of continuous operation between outages (2023-05-18 to 2025-04-28).
711
Record Run
days
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold set for this unit with no trips to 0% power.
2
B2B Runs
83% toward B2B (522/628d)
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power).
94.3%
Capacity Factor
?
Net electricity actually generated over the most recent 12 months reported by the U.S. EIA (Form EIA-923), summed across every unit at this plant. Authoritative actuals, not an estimate.
19.35 TWh
Net Generation
EIA-923 · 12 mo to 2026-07 · plant total
?
Total number of scheduled refueling outages detected in the historical data.
14
Outages
since 1999
?
Average time from first power generation (>0%) to sustained full power (≥95% for 2+ days) across the last 3 scheduled outages. Click to compare against the fleet on the Operator Efficiency Leaderboard.
4
Avg Startup
days (last 3)
?
Average fuel utilization — percent of the designed fuel cycle that this unit consumes before refueling, derived from the historical burn-down trajectory. Higher = more efficient operator (refuels with less margin remaining; closer to coastdown). Computed as 100% minus the unit's average refuel-point fuel %, using the last 3 years where available, otherwise lifetime average. Click to compare against the fleet on the Operator Efficiency Leaderboard.
98.3%
Fuel Utilization
3yr avg

Reactor Status

Capacity Factor (365-Day)

?
100%
Current
99.6%
365-Day Avg
#18
of 94 plants
Min: 63% Max: 100% 3 days <80%

Outage Days by Year

?
Total days spent in outage each year, split by scheduled refueling (blue) and forced/unplanned (red). Lower totals indicate better reliability and outage execution. Hover for details.
Across its recorded history, Limerick 2 has spent 319 days in scheduled refueling outages and 83 days in forced or unplanned outages. Taller bars mark the years with the most downtime.
?
Duration of each outage in days, shown chronologically. Green bars are scheduled refueling outages, red bars are forced/unscheduled. The orange dashed line marks the average duration. Extended outages (>180 days) and D&D periods are excluded.

Outage Duration Trend

Limerick 2 has 41 outages plotted here, averaging 10 days each. The most recent, in Apr 2025, was a scheduled refueling outage lasting 19 days.
?
Scheduled refueling outage durations over time. Green bars are at or below this unit's average, amber up to 30% above it, red beyond that. The dashed line is the average. Shorter outages mean better execution.

Refueling Duration Trend

Limerick 2 has completed 14 scheduled refueling outages on record, averaging 23 days each. The most recent, in Apr 2025, ran 19 days.
?
Time in days from first power generation (>0%) to sustained full power (≥95% for 2+ consecutive days) after each scheduled refueling outage. The dashed line marks the average. Includes startup testing holds and power dips.

Startup Duration Trend

After a refueling outage, Limerick 2 takes about 4 days to climb from first power back to full power. That average is drawn from 14 startups on record, and the most recent took 3 days.
?
Daily reactor power over the 120 days before each scheduled refueling outage, one line per refueling, lined up on the day the outage began. A coastdown is the slow decline as the fuel runs out near the end of a cycle. The highlighted line is the most recent refueling and fainter lines are older. Counts and medians cover coastdowns of a week or longer. A shutdown straight from full power, with no decline ahead of it, is what a forced outage looks like.

Coastdown Before Refueling

12 of 14 refuelings 36 days median 83% power at shutdown 0.4% per day
Limerick 2 coasted down for a week or longer before 12 of its 14 refuelings on record. Those coastdowns ran a median of 36 days and ended near 83% power. The most recent refueling, in Apr 2025, followed a 39-day coastdown from 97% to 78%.
?
Estimated fuel remaining in the current cycle, expressed as a percentage of the unit's typical cycle. Starts at 100% when the unit returns to power post-refuel and drops as full-power-days are burned. Days at reduced power burn fuel proportionally — so a unit with significant downtime (high burn deficit) drops slower and ends up with MORE fuel left than its calendar position would suggest. Coastdown threshold around 15%. Toggle to overlay past cycles on a normalized "days into cycle" axis to see how aggressively this unit historically burns down before refuel.

Fuel Burn Down Cycle since May 18, 2025

27.2% remaining 2.0 FPD margin
Limerick 2 has an estimated 27.2% of its fuel left. Across its last 13 cycles, it has refueled with an average of 3.7% remaining.
Avg refuel: 3.7% Avg refuel (3yr): 1.7% Deepest burn: 1.0% (2013-04 → 2015-04) Most margin: 9.4% (1999-05 → 2001-04)
?
Monthly capacity factor with outage events overlaid as red bands. Green bars show average power level per month. Toggle to Daily view for raw daily data.

Power History

Over its operating life, Limerick 2 has run at about 94.3% of its rated capacity. Across the last 12 reported months it averaged 99.6%. On the chart, green stretches near the top are full-power running, amber marks reduced power (50 to 89%), and red drops toward zero are outages.

Outage History & Daily Power Log

This table logs every recorded outage for Limerick 2, 41 in all since 1999. Of those, 14 were scheduled refueling outages and 27 were unplanned or forced. The typical outage lasted about 10 days. Where the Scheduled column shows (Model), the date is a NukeWorker projection because the utility had not published one.
Scheduled 2R18
2025-04-28 2025-05-16 19 711d 2025-04-29 -1d
Scheduled 2R17
2023-05-01 2023-05-18 18 39d 2023-05-01 0d
Unscheduled
2023-03-19 2023-03-23 5 380d - -
Unscheduled
2022-03-03 2022-03-04 2 293d - -
Scheduled 2R16
2021-04-26 2021-05-14 19 690d 2021-04-26 0d
Scram # 54098 Manual
2019-06-04 2019-06-06 3 33d - -
Scheduled 2R15
2019-04-15 2019-05-02 18 544d 2019-04-15 0d
Unscheduled
2017-10-09 2017-10-18 10 137d - -
Scheduled 2R14
2017-04-17 2017-05-25 39 319d 2017-04-17 0d
Scram # 51968 Manual
2016-06-02 2016-06-02 1 165d - -
Scram # 51614 Auto
2015-12-20 2015-12-20 1 2d - -
Unscheduled
2015-12-14 2015-12-18 5 223d - -
Scheduled 2R13
2015-04-13 2015-05-05 23 349d 2015-04-13 0d
Unscheduled
2014-04-25 2014-04-29 5 373d - -
Scheduled 2R12
2013-03-25 2013-04-17 24 239d 2013-03-25 0d
Unscheduled
2012-07-28 2012-07-29 2 56d - -
Unscheduled
2012-06-01 2012-06-02 2 7d - -
Unscheduled
2012-05-18 2012-05-25 8 353d - -
Scram # 46903 Auto
2011-05-30 2011-05-31 2 38d - -
Scheduled 2R11
2011-03-28 2011-04-22 26 30d 2011-03-28 0d
Scram # 46641 Manual
2011-02-26 2011-02-26 1 686d - -
Scheduled 2R10
2009-03-23 2009-04-11 20 404d 2009-03-23 0d
Unscheduled
2008-02-11 2008-02-13 3 4d - -
Unscheduled
2008-02-02 2008-02-07 6 283d - -
Unscheduled
2007-04-24 2007-04-25 2 14d - -
Unscheduled Startup Hold
2007-04-09 2007-04-10 2 6d - -
Scheduled 2R9
2007-03-10 2007-04-03 25 379d 2007-03-09 +1d
Unscheduled
2006-02-23 2006-02-24 2 129d - -
Unscheduled
2005-10-17 2005-10-17 1 3d - -
Unscheduled
2005-10-13 2005-10-14 2 202d - -
Unscheduled Startup Hold
2005-03-21 2005-03-25 5 4d - -
Scheduled 2R8
2005-03-01 2005-03-17 17 251d 2005-02-28 +1d
Unscheduled
2004-06-23 2004-06-23 1 459d - -
Scheduled 2R7
2003-03-04 2003-03-22 19 221d 2003-03-04 0d
Unscheduled
2002-07-24 2002-07-26 3 391d - -
Unscheduled
2001-06-27 2001-06-28 2 69d - -
Scheduled 2R6
2001-04-05 2001-04-19 15 38d 2001-04-05 0d
Unscheduled
2001-02-24 2001-02-26 3 411d - -
Unscheduled
2000-01-09 2000-01-10 2 8d - -
Unscheduled
1999-12-31 2000-01-01 2 222d - -
Scheduled 2R5
1999-04-17 1999-05-23 37 - 1999-04-17 0d
Page created in 0.096 seconds with 12 queries (cached).